Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20102C374 + (ML20102C374)
- RBG-20-150, Forwards marked-up Rev to Initial Startup Test Phase of FSAR Section 14.2, Initial Test Program. Justification & Summary Explanation of Revs Also Encl + (ML20102C378)
- NLS8500042, Responds to 850130 Telcon Requesting Info Re Automatic Depressurization Sys Accumulator Gas Supply & Verification of Class 1 Seismic Automatic Depressurization Sys Components,Per TMI Item II.K.3.28 + (ML20102C382)
- ML20102C389 + (ML20102C389)
- ML20102C390 + (ML20102C390)
- ML20102C392 + (ML20102C392)
- ML20102C394 + (ML20102C394)
- ML20102C395 + (ML20102C395)
- ML20102C397 + (ML20102C397)
- ML20102C398 + (ML20102C398)
- ST-HL-AE-1200, Application to Amend CPPR-128 & CPPR-129 to Permit Elimination of Postulated Circumferential & Longitudinal Breaks in RCS Main Loop Piping & Associated Dynamic Effects from Consideration in Structural Design Basis.Fee Paid + (ML20102C400)
- ML20102C412 + (ML20102C412)
- ML20102C414 + (ML20102C414)
- ML20102C415 + (ML20102C415)
- ML20102C418 + (ML20102C418)
- ML20102C419 + (ML20102C419)
- 3F0385-03, Forwards Requests for Exemption from Required Schedule for Completion of Three Plant Fire Protection Mods,Superseding 841005 Requests.Completion Dates Extended to First Quarter 1986 + (ML20102C420)
- ML20102C421 + (ML20102C421)
- ML20102C422 + (ML20102C422)
- ML20102C423 + (ML20102C423)
- ML20102C424 + (ML20102C424)
- ML20102C428 + (ML20102C428)
- ML20102C433 + (ML20102C433)
- ML20102C434 + (ML20102C434)
- RBG-20-162, Forwards Rev 1 to Environ Qualification Document to Assist NRC Reviewer in Developing Ser,Section 3.11 & in Addressing SER Open Item 5.Jusitification for Interim Operation for Class 1E Electrical Components in Harsh Environ Also Encl + (ML20102C436)
- ML20104A001 + (ML20104A001)
- ML20104A002 + (ML20104A002)
- PMNS20200354, Notice of Meeting with Southern Nuclear Operating Company + (ML20104A011)
- PMNS20200355, Notice of Meeting with Southern Nuclear Operating Company + (ML20104A012)
- PMNS20200356, Notice of Meeting with Southern Nuclear Operating Company + (ML20104A014)
- ML20104A015 + (ML20104A015)
- ML20104A017 + (ML20104A017)
- ML20104A018 + (ML20104A018)
- Press Release-20-022, NRC Issues Final Environmental Impact Statement for Surry Subsequent License Renewal + (ML20104A019)
- 05000413/LER-2020-001, Valid Actuation of the Unit 1 Reactor Protection System and Auxiliary Feedwater System + (ML20104A020)
- IR 05000440/2020401 + (ML20104A027)
- PMNS20200357, Notice of Meeting with Southern Nuclear Operating Company + (ML20104A030)
- ML20104A034 + (ML20104A034)
- ML20104A035 + (ML20104A035)
- ML20104A037 + (ML20104A037)
- ML20104A038 + (ML20104A038)
- ML20104A039 + (ML20104A039)
- ML20104A040 + (ML20104A040)
- ML20104A045 + (ML20104A045)
- 05000352/LER-1984-039, :on 841221,reactor Water Cleanup Sys,Reactor Encl & Refuel Floor Ventilation Sys Isolated.Caused by Overvoltage of Static Inverter.Scram Reset + (ML20104A054)
- ML20104A071 + (ML20104A071)
- ML20104A079 + (ML20104A079)
- ML20104A081 + (ML20104A081)
- ML20104A086 + (ML20104A086)
- ML20104A088 + (ML20104A088)
- ML20104A093 + (ML20104A093)