Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101U341 + (ML20101U341)
- ML20101U345 + (ML20101U345)
- ML20101U349 + (ML20101U349)
- ML20101U351 + (ML20101U351)
- ML20101U355 + (ML20101U355)
- 05000301/LER-1991-007-01, :on 911110,DHR Requirement Violated During SG Crevice Cleaning.Caused by Inadequate Procedural Guidance. Need to Continue Performing SG Crevice Cleaning Procedure Will Be Assessed + (ML20101U360)
- ML20101U361 + (ML20101U361)
- ML20101U362 + (ML20101U362)
- ML20101U366 + (ML20101U366)
- ML20101U376 + (ML20101U376)
- ML20101U395 + (ML20101U395)
- ML20101U398 + (ML20101U398)
- ML20101U409 + (ML20101U409)
- ML20101U411 + (ML20101U411)
- ML20101U414 + (ML20101U414)
- ML20101U415 + (ML20101U415)
- ML20101U419 + (ML20101U419)
- ML20101U429 + (ML20101U429)
- ML20101U435 + (ML20101U435)
- 05000339/LER-1992-015, :on 920621,hi Hydrogen Main Control Room Annunicator for Containment Analyzer Discovered Inoperable & Local Panel Incorrectly Wired.Caused by Personnel Error. Relay Correctly Wired & Test Results Verified + (ML20101U437)
- ML20101U463 + (ML20101U463)
- ML20101U465 + (ML20101U465)
- ML20101U475 + (ML20101U475)
- ML20101U479 + (ML20101U479)
- ML20101U485 + (ML20101U485)
- ML20101U508 + (ML20101U508)
- ML20101U509 + (ML20101U509)
- RBG-19993, Final Deficiency Rept DR-276 Re Potential Failure of RCIC Condensate Storage Tank Suction Line Isolation Valve. Initially Reported on 841226.HPCS Check Valve Relocated Upstream of Tank Takeoff + (ML20101U521)
- ML20101U554 + (ML20101U554)
- ML20101U556 + (ML20101U556)
- ML20101U559 + (ML20101U559)
- ML20101U564 + (ML20101U564)
- ML20101U584 + (ML20101U584)
- ML20101U599 + (ML20101U599)
- ML20101U635 + (ML20101U635)
- BVY-92-084, Responds to NRC Request for Addl Info Re Rept Made by Vynp on 920625 of NRC-licensed Operator Who Tested Positive Following fitness-for-duty Test.Response Withheld (Ref 10CFR2.790) + (ML20101U645)
- ML20101U648 + (ML20101U648)
- 05000353/LER-1992-005, :on 920605,EDG D21 Inadvertently Started During Performance of Shutdown of DG Operating Procedure.Caused by Personnel Error.Operator Counseled,Operator Aid Applied to Manual Air Start Valves & Chapter Revised + (ML20101U650)
- ML20101U661 + (ML20101U661)
- 05000352/LER-1992-013, :on 920624,determined That RHR HX Failed Heat Transfer Capacity Test,Per Generic Ltr 89-13.Caused by HX Fouling & Leaking RHR HX 1B Bypass Valve.Restricting Orifice Removed to Allow Increased Flow + (ML20101U665)
- 05000353/LER-1992-007-02, :on 920624,discovered That Main Control Room Operator Failed to Return Reactor Encl Isolation Valves a & B Reset Switches Back to as-found Auto Position.Caused by Design Deficiency.Alarm Annunciation Installed + (ML20101U668)
- ML20101U669 + (ML20101U669)
- ML20101U671 + (ML20101U671)
- ML20101U672 + (ML20101U672)
- ML20101U682 + (ML20101U682)
- ML20101U711 + (ML20101U711)
- RBG-20025, Forwards Final Response to SER Confirmatory Item 18 Re Containment Purge Valves.Response Addresses Staff Position 6 Re Operation of Drywell Purge Sys.Encl Revised FSAR Pages Will Be Incorporated Into Next Amend + (ML20101U739)
- RBG-20046, Forwards Response to NRC 841105 Request for Addl Info on Initial Test Program.Response Also Addresses SER Confirmatory Item 61 Re Program Revs & Generic Ltr 83-24 + (ML20101U744)
- ML20101U762 + (ML20101U762)
- ML20101U763 + (ML20101U763)
- ML20101U774 + (ML20101U774)