Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000244/LER-1996-004, :on 960309,decrease in Steam Generator Level Occurred.Caused by Failed Open Atmospheric Relief Valves. Booster Relay Replaced + (ML20101Q730)
- ML20101Q731 + (ML20101Q731)
- NLS8400231, Forwards Revised Pages 3-2 & 3-3 of QA Program,Per 840808 Request + (ML20101Q737)
- ML20101Q738 + (ML20101Q738)
- ML20101Q746 + (ML20101Q746)
- ML20101Q752 + (ML20101Q752)
- ML20101Q754 + (ML20101Q754)
- ML20101Q755 + (ML20101Q755)
- 05000382/LER-1992-005-08, :on 920609,control Room Emergency Filtration Sys Started Automatically.Cause of Event Was Indeterminate. Technicians Will Continue to Monitor Radiation Monitor Performance During Operations + (ML20101Q756)
- ML20101Q759 + (ML20101Q759)
- ML20101Q766 + (ML20101Q766)
- ML20101Q770 + (ML20101Q770)
- 05000336/LER-1996-014-01, :on 960311,weekly TS Surveillances Missed. Caused by Personnel Error W/Respect to Scheduling.C/A: Implemented Requirements of Surveillance Procedure Sp 2614A-3 + (ML20101Q773)
- ML20101Q782 + (ML20101Q782)
- ML20101Q783 + (ML20101Q783)
- RBG-19652, Responds to NRC Re Violations Noted in Insp Rept 50-458/84-23.Corrective Actions:Programmed Contents of Periodic Quality Repts Reviewed & New Trend Chart Prepared + (ML20101Q787)
- ML20101Q789 + (ML20101Q789)
- ML20101Q791 + (ML20101Q791)
- ML20101Q794 + (ML20101Q794)
- ML20101Q797 + (ML20101Q797)
- 05000338/LER-1996-003, :on 960314,mode 3 Entry with Inoperable Redundant Heat Trace Circuit.Caused by Personnel Error.C/A: Redundant Heat Trace Replaced,Tested & Returned to Svc on 960315 + (ML20101Q798)
- ML20101Q803 + (ML20101Q803)
- 05000328/LER-1992-006-01, :on 920609,failure to Perform Surveillance Instruction within Required Time Frame Identified.Caused by Inadequate Communication Between Personnel.Si Performed + (ML20101Q806)
- ML20101Q815 + (ML20101Q815)
- ML20101Q824 + (ML20101Q824)
- ML20101Q828 + (ML20101Q828)
- RBG-37132, Responds to NRC SER Re Station Blackout Analysis Dtd 920611. Station Blackout Procedure Changes Will Be Completed Prior to Refueling Outage 5,currently Scheduled for Mar 1994 + (ML20101Q830)
- ML20101Q833 + (ML20101Q833)
- ML20101Q837 + (ML20101Q837)
- ML20101Q843 + (ML20101Q843)
- ML20101Q852 + (ML20101Q852)
- ML20101Q853 + (ML20101Q853)
- ML20101Q857 + (ML20101Q857)
- ML20101Q861 + (ML20101Q861)
- ML20101Q862 + (ML20101Q862)
- IR 05000275/1996005 + (ML20101Q863)
- BECO-92-076, Monthly Operating Rept for June 1992 for Pilgrim 1 + (ML20101Q865)
- ML20101Q868 + (ML20101Q868)
- JPN-92-035, Responds to GL 89-10 Re Consideration of Results of NRC Sponsored Tests of motor-operated Valves.Mod Proposed to Remove Bypass Line & 12MOV-80 + (ML20101Q871)
- ML20101Q874 + (ML20101Q874)
- ML20101Q881 + (ML20101Q881)
- ML20101Q890 + (ML20101Q890)
- ML20101Q901 + (ML20101Q901)
- ML20101Q905 + (ML20101Q905)
- ML20101Q910 + (ML20101Q910)
- ML20101Q911 + (ML20101Q911)
- ST-HL-AE-5340, Requests Listed Change to Distribution List for Transmittals Related to Plant + (ML20101Q912)
- ML20101Q918 + (ML20101Q918)
- ML20101Q923 + (ML20101Q923)
- ML20101Q928 + (ML20101Q928)
- ML20101Q929 + (ML20101Q929)