Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100K728 + (ML20100K728)
- ML20100K730 + (ML20100K730)
- 3F1284-06, Forwards to EPA Transmitting Fifth Quarterly Progress Rept for Crystal River 316 Study + (ML20100K732)
- L-85-140, Special Rept:On 850322,main Steam Safety Valve Radiation Monitor Declared Inoperable.Caused by Inoperable Gm Tube Detector or Gm Tube Electronic Interface Due to Collected Condensation.Components Replaced.Monitor Returned to Svc + (ML20100K735)
- ML20100K737 + (ML20100K737)
- ML20100K740 + (ML20100K740)
- BSEP-85-0386, Special Rept 2-SR-85-2:on 850206,fire Barrier Established for Fire Door 201.Caused by Routing Temporary Fire Suppression Supply Through Open Door to Provide Alternate Suppression for Stations 2-CB-1 & 2-CB-2 + (ML20100K746)
- ML20100K748 + (ML20100K748)
- 05000289/LER-1984-003, :on 840702,fire Area Identified W/O Fire Barrier Penetration Seals.Caused by Inadequate Supervision of Workers Installing Seals.Procedure Revised + (ML20100K760)
- ML20100K763 + (ML20100K763)
- 05000244/LER-1985-003, :on 850309,cable Tunnel Smoke Detection Sys Auto Deluge Inadvertently Removed from Svc.Caused by Personnel Error of Misreading Zone to Be Deactivated. Procedure Reviewed + (ML20100K764)
- ML20100K768 + (ML20100K768)
- ML20100K770 + (ML20100K770)
- ML20100K774 + (ML20100K774)
- BSEP-85-0402, Responds to NRC Re Violations Noted in Insp Repts 50-324/84-35 & 50-325/84-35.Corrective Actions:Main Steam Lines Drained & Inspected for Damage.Procedure OP-32 Revised to Include Drain Valves to Allow Complete Draining + (ML20100K776)
- ML20100K777 + (ML20100K777)
- ML20100K782 + (ML20100K782)
- ML20100K787 + (ML20100K787)
- 05000220/LER-1985-004, :on 850304,during Shutdown,Turbine Trip Signal Led to HPCI Initiation.Caused by High Reactor Water Level.Level Control Adjusted.Water Level Returned to Normal + (ML20100K788)
- ML20100K791 + (ML20100K791)
- ML20100K792 + (ML20100K792)
- ML20100K799 + (ML20100K799)
- ML20100K800 + (ML20100K800)
- ML20100K803 + (ML20100K803)
- 05000413/LER-1985-018, :on 850307,Train a Diesel Generator & Turbine Driven Auxiliary Feedwater Pump Concurrently Inoperable. Caused by Personnel Error Placing Batteries on Equalize Charge.Batteries Returned to Svc + (ML20100K811)
- ML20100K813 + (ML20100K813)
- ML20100K814 + (ML20100K814)
- ML20100K826 + (ML20100K826)
- ML20100K827 + (ML20100K827)
- ML20100K834 + (ML20100K834)
- ML20100K835 + (ML20100K835)
- ML20100K844 + (ML20100K844)
- ML20100K847 + (ML20100K847)
- ML20100K854 + (ML20100K854)
- JAFP-96-0074, Forwards Rev 17 to Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan.Rev Withheld,Per 10CFR73.21 & 2.790(d)(1) + (ML20100K859)
- ML20100K863 + (ML20100K863)
- JAFP-96-0075, Forwards Rev 4 to Security Contingency Plan.Rev Withheld,Per 10CFR73.21 + (ML20100K864)
- 05000254/LER-1985-005-07, :on 850306,at 100% Thermal Power Operation, Fuel Pool Radiation Monitor 1A Failed Downscale.On 850307, Monitors 1B & 1A Spiked High.Probably Caused by Electrical Noise Interference.Mod Issued + (ML20100K867)
- ML20100K871 + (ML20100K871)
- 05000413/LER-1985-019, :on 850307,during Performance of Analog Channel Operational Test,Steam Generator C Level Channel 4 Found Inoperable.Caused by Personnel Error.Circuit Card Replaced + (ML20100K880)
- IR 05000529/2004001 + (ML20100K882)
- 05000370/LER-1984-027, :on 841025,manual Reactor Trip Initiated Following Loss of Main Feedwater Pump 2A Due to Water in Pump Control Oil Sys.Water Drained from Filters & Sys Restarted + (ML20100K895)
- ML20100K898 + (ML20100K898)
- ML20100K900 + (ML20100K900)
- ML20100K907 + (ML20100K907)
- ML20100K908 + (ML20100K908)
- ML20100K917 + (ML20100K917)
- 05000259/LER-1985-006-02, :on 850304,during Performance of HPCI Sys Motor Operated Valve Operability Surveillance Instruction 4.5.E.1.c,HPCI Inverter Fuse Cleared.Caused by Blown Inverter Fuse.Fuse Replaced + (ML20100K921)
- ML20100K925 + (ML20100K925)
- ML20100K931 + (ML20100K931)
- 1CAN038510, Forwards Master Schedule for Completion of Seismic,Partially tornado-protected,condensate Storage Tank,Per NUREG-0737, Item II.E.1.1 + (ML20100K934)