Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-85-067, Application for Amend to License DPR-35,adding Footnote to Tech Spec Section 3.7.D.2,granting Temporary Relief to Allow Hydrogen Injection Testing + (ML20100H243)
- ML20100H247 + (ML20100H247)
- ML20100H251 + (ML20100H251)
- ML20100H261 + (ML20100H261)
- ML20100H262 + (ML20100H262)
- ML20100H279 + (ML20100H279)
- ML20100H283 + (ML20100H283)
- 05000388/LER-1984-023, :on 841206,fire Watch Required for Two Independent Work Activities.Caused by Fire Watch Log Not Referencing Activities.Addl Guidelines for Tracking Fire Protection Activities & Separate Log Developed + (ML20100H289)
- ML20100H291 + (ML20100H291)
- ML20100H296 + (ML20100H296)
- ML20100H297 + (ML20100H297)
- W3P85-0785, Interim Deficiency Rept 180 Re Failure to Maintain Adequate Document Control of Vendor Manuals.Initially Reported on 840918.Addl Time to Evaluate Safety Significance Required. Submittal of Written Rept Rescheduled for 850430 + (ML20100H300)
- 05000259/LER-1996-001-01, :on 960121,Unit 1/2 B DG Auto Started During Local Panel Testing.Caused by Failure of Blocking Diode in Start Failure Circuitry.Failed Diode Replaced & Panel Alarm Pushbutton Annuciation Circuitry Checked + (ML20100H318)
- ML20100H325 + (ML20100H325)
- HL-5110, Discusses Resolution of Issue of Conformance Re Core Shroud Stabilizer Design + (ML20100H337)
- 05000327/LER-1996-001-02, :on 960121,discovered Fire Watch Patrol Did Not Patrol Some Assigned Areas in Control Bldg & on 960126,fire Watch Patrol Not Performed within Timeframe Required by Ts. Appropriate Disciplinary Action Taken + (ML20100H339)
- 05000267/LER-1996-001, :on 960120,test Interval to Test Area Radiation Monitors Exceeded Due to Inattention to Controls for Identifying & Performing Required Surveillance Tests.Test Procedure Reissued & Completed + (ML20100H344)
- ML20100H358 + (ML20100H358)
- ML20100H359 + (ML20100H359)
- ML20100H364 + (ML20100H364)
- ULNRC-03338, Forwards Callaway Plant Personnel Exposure & Monitoring Rept for 1995. No Incidents of Exceeding TS 3.4.8 Limits Occurred + (ML20100H375)
- ML20100H378 + (ML20100H378)
- ML20100H381 + (ML20100H381)
- ML20100H405 + (ML20100H405)
- ML20100H407 + (ML20100H407)
- ML20100H408 + (ML20100H408)
- ML20100H420 + (ML20100H420)
- ML20100H434 + (ML20100H434)
- RBG-19473, Interim Deficiency Rept DR-245 Re Weld Joint Between Three Hydraulic Lines & Housing Flange as Part of Reactor Pressure Vessel Supplied by Ge.Next Rept Will Be Submitted by 850117 + (ML20100H450)
- ML20100H457 + (ML20100H457)
- ML20100H458 + (ML20100H458)
- 05000269/LER-1995-008, :on 951129,determined That Containment Isolation Valve Inoperable Due to Deficient Design Change. Valve 3RC-5 Disabled in Safety Position (Closed) Until Gear Ratio in Valve Corrected + (ML20100H467)
- ML20100H475 + (ML20100H475)
- ML20100H487 + (ML20100H487)
- ML20100H491 + (ML20100H491)
- ML20100H494 + (ML20100H494)
- ML20100H503 + (ML20100H503)
- ML20100H509 + (ML20100H509)
- B11460, Responds to Insp Rept 50-336/85-01 Re NRC 850107-11 Audit of Work Performed in Response to IE Bulletins 79-02,79-04,79-07 & 79-14.Info Re Listed Items Concerning IE Bulletin 79-02 Will Be Submitted by 850401,per Varela 850111 Request + (ML20100H516)
- GO2-96-029, Forwards Resignation Ltrs & Appointment & Acceptance Re Decommissioning Trust Fund Trustee + (ML20100H520)
- ML20100H521 + (ML20100H521)
- ML20100H525 + (ML20100H525)
- ML20100H528 + (ML20100H528)
- ML20100H529 + (ML20100H529)
- ML20100H530 + (ML20100H530)
- ML20100H546 + (ML20100H546)
- ML20100H549 + (ML20100H549)
- RBG-19467, Interim Deficiency Rept DR-188 Re Hubs on Socket Weld Flanges Supplied by West Jersey Mfg Co.Next Rept Will Be Submitted by 841207 + (ML20100H550)
- RBG-19466, Interim Deficiency Rept DR-184 Re Shop Weld on Bf Shaw Co Support Trunnion.Next Rept Will Be Submitted by 850109 + (ML20100H567)
- 1CAN118413, Forwards Summary Results of Upper Core Barrel Bolt Replacement & Stress Analysis of Upper Core Barrel Joint W/Reduced Number of Bolts.Reactor Vessel Internal Bolting, Addl Insps & Bolting Replacements Satisfactory + (ML20100H568)
- ML20100H572 + (ML20100H572)