Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099H376 + (ML20099H376)
- ML20099H381 + (ML20099H381)
- ML20099H384 + (ML20099H384)
- ML20099H394 + (ML20099H394)
- NLS8400274, Forwards Addl Fee for 830427 Application for Amend to License DPR-46,changing Tech Specs,Per 841106 Request + (ML20099H402)
- ML20099H405 + (ML20099H405)
- 0CAN089206, Advises That TS Changes to Address Operational & SR for Main Steam Line Radiation Monitors,Per Commitment in , Delayed from 920831 to 920930,based on Rescheduling of Safety Review Committee Meeting from mid-Aug to mid-Sept + (ML20099H409)
- 05000416/LER-1992-015, :on 920709,automatic Actuation of RWCU Sys Inboard Containment Isolation Valves Occurred & Leak Detection RWCU HX Room High Temp Annunicator Alarmed.Caused Not Yet Determined.Investigation Underway + (ML20099H411)
- ML20099H427 + (ML20099H427)
- ML20099H431 + (ML20099H431)
- 05000251/LER-1984-023-01, :on 841016,reactor Trip Occurred.Caused by Detector on Nis N-32 Channel Failing & Generating High Level Signal.Nis Channel N-32 Taken Out of Svc & Detector Replaced + (ML20099H437)
- 05000362/LER-1992-004, :on 920720,manual Initiation of Emergency FW Actuation Sys Occurred in Response to Trip of Mfpt.Caused by Low Bearing Lube Oil Pressure Condition of Associated MFP 3P062.PRV 3PCV-4270 Adjusted + (ML20099H449)
- ML20099H454 + (ML20099H454)
- PLA-2349, Monthly Operating Repts for Oct 1984 + (ML20099H459)
- ML20099H471 + (ML20099H471)
- 05000458/LER-1992-011, :on 920713,routine Review of Surveillance Test Procedures (Stps) Revealed That STP Was Overdue.Caused by Personnel Error.Supervisor Counseled & Surveillance Test Scheduling Priority Rept Posted + (ML20099H472)
- ML20099H476 + (ML20099H476)
- BECO-LTR-92-098, Monthly Operating Rept for Jul 1992 for Pilgrim Nuclear Power + (ML20099H477)
- ST-HL-AE-4177, Suppls 920710 Response to Exercise Weaknesses Noted in Insp Repts 50-498/92-09 & 50-499/92-09.Date to Determine Revised Needs for round-the-clock Emergency Medical Care at Facilities Extended from 920805 to 920915 + (ML20099H482)
- JPN-92-044, Forwards Application for Amend to License DPR-59,changing TS Re Offgas Sys Steam Dilution Flow Isolation Setpoints to Increase Offgas Dilution Steam Low Flow & High Flow Isolation Setpoints to 6,300 & 7,900 Lbs Per H,Respectively + (ML20099H493)
- ML20099H498 + (ML20099H498)
- ML20099H500 + (ML20099H500)
- ML20099H502 + (ML20099H502)
- ML20099H504 + (ML20099H504)
- ML20099H508 + (ML20099H508)
- ML20099H511 + (ML20099H511)
- AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL + (ML20099H521)
- ML20099H523 + (ML20099H523)
- ML20099H527 + (ML20099H527)
- 05000397/LER-1984-111, :on 841018,discovered Battery Surveillance Test Not Performed.Caused by Computer Program Being Incorrectly Set Up.Computer Program Fault Corrected & Surveillance Program Reexamined + (ML20099H529)
- ML20099H530 + (ML20099H530)
- ML20099H531 + (ML20099H531)
- ML20099H536 + (ML20099H536)
- ML20099H542 + (ML20099H542)
- ML20099H547 + (ML20099H547)
- ML20099H549 + (ML20099H549)
- ML20099H553 + (ML20099H553)
- ML20099H559 + (ML20099H559)
- ML20099H561 + (ML20099H561)
- ML20099H563 + (ML20099H563)
- ML20099H565 + (ML20099H565)
- ML20099H566 + (ML20099H566)
- ML20099H574 + (ML20099H574)
- ML20099H578 + (ML20099H578)
- ML20099H579 + (ML20099H579)
- RBG-20-255, Responds to NRC Re Violations Noted in Insp Rept 50-458/84-34.Corrective Actions:Training of Startup & Test Personnel Completed on 850116 to Stress Importance of Strict Compliance W/Procedures + (ML20099H585)
- ML20099H590 + (ML20099H590)
- ML20099H603 + (ML20099H603)
- ML20099H606 + (ML20099H606)
- ML20099H607 + (ML20099H607)
- 05000298/LER-1992-012, :on 920715,RCIC Sys Declared Inoperable Due to Intrusion Into Motor Operator.Caused by Packing Leak & Defective Conduit Shield.Mov Motor Replaced.Conduit Will Be Replaced During 1993 Refuleing Outage + (ML20099H612)