Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094H402 + (ML20094H402)
- ML20094H403 + (ML20094H403)
- 05000325/LER-1995-019, :on 951012,improper Matl Configuration Resulted in Inoperable RHR SW Valves.Repaired Valves & Returned to Svc + (ML20094H413)
- ML20094H414 + (ML20094H414)
- ML20094H421 + (ML20094H421)
- ML20094H428 + (ML20094H428)
- 05000277/LER-1984-011, :on 840608,acetylene Leak Occurred During Drywell Preheat Welding.Caused by Leak Where Hose Crimped to Std Screw Connection.Personnel Evacuated & Addl Ventilation Used to Expel Gas + (ML20094H431)
- 05000423/LER-1995-017-02, :on 951012,TS Surveillance Was Missed Due to Programmatic Weakness & Personnel Error.Counseled Individuals Involved + (ML20094H432)
- ML20094H453 + (ML20094H453)
- ML20094H462 + (ML20094H462)
- ML20094H464 + (ML20094H464)
- ML20094H465 + (ML20094H465)
- GL-728143-25, GLTS: Past Due General License Device Annual Registration: Kosmos Energy Gulf of Mexico Operations, LLC: RM-728143-25 + (ML20094H466)
- ML20094H467 + (ML20094H467)
- ML20094H468 + (ML20094H468)
- ML20094H472 + (ML20094H472)
- ML20094H475 + (ML20094H475)
- ML20094H477 + (ML20094H477)
- ML20094H478 + (ML20094H478)
- ML20094H480 + (ML20094H480)
- ML20094H481 + (ML20094H481)
- ML20094H483 + (ML20094H483)
- ML20094H485 + (ML20094H485)
- ML20094H488 + (ML20094H488)
- ML20094H489 + (ML20094H489)
- ML20094H490 + (ML20094H490)
- ML20094H491 + (ML20094H491)
- ML20094H493 + (ML20094H493)
- 3F1195-14, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-16.Corrective Actions:Placed DC Cooling to MUP-1A Under Administrative Control + (ML20094H494)
- ML20094H498 + (ML20094H498)
- ML20094H500 + (ML20094H500)
- ML20094H501 + (ML20094H501)
- ML20094H503 + (ML20094H503)
- ML20094H509 + (ML20094H509)
- ML20094H512 + (ML20094H512)
- ML20094H518 + (ML20094H518)
- NRC-95-0122, Transmits Proprietary re-issued GE Rept, Enrico Fermi-2 Detroit Edison Co Calibr Interval Extension Analysis for Addl Instruments. Rept Previously Submitted as Part of 930729 TS Change Request.Proprietary GE Rept Withheld + (ML20094H521)
- ML20094H522 + (ML20094H522)
- ML20094H524 + (ML20094H524)
- ML20094H529 + (ML20094H529)
- ML20094H536 + (ML20094H536)
- ML20094H537 + (ML20094H537)
- ML20094H544 + (ML20094H544)
- ML20094H547 + (ML20094H547)
- ST-HL-AE-4024, Requests Temporary Waiver of Compliance from TS 3.7.4 & 3.7.14 to Permit Outage Time for One Train of Essential Cooling Water Sys & Essential Chilled Water Sys to Be Extended for Addl 24 H to 96 H + (ML20094H549)
- ML20094H550 + (ML20094H550)
- ML20094H552 + (ML20094H552)
- ML20094H553 + (ML20094H553)
- IR 05000329/1978020 + (ML20094H558)
- NRC-95-4589, Provides Comparison Between Wgothic Containment Integrity Analysis Model & More Traditional Few Node Style, Analysis During Initial Blowdown Portion of Containment Response Analysis + (ML20094H559)
- ML20094H560 + (ML20094H560)