Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093A133 + (ML20093A133)
- ML20093A156 + (ML20093A156)
- 2CAN078401, Forwards Revised Schedule for Installation of Inadequate Core Cooling (ICC) Monitoring Sys,Test Program Status & Plans for ICC Instrument Installation During Next Refueling Outage.Review Process Will Be Discussed at 840712 Meeting + (ML20093A168)
- ML20093A193 + (ML20093A193)
- ML20093A209 + (ML20093A209)
- TXX-4209, Forwards Equipment Environ Qualification Analysis Justifications for Interim Operation Required by 10CFR50.49. Facilities Can Be Safely Operated Until Qualification Program Completed + (ML20093A210)
- 05000313/LER-1982-028-03, /03X-1:on 840909,diesel Driven Fire Pump P-6B Failed to Start When Using Battery Bank B.Caused by Normal end-of-svc Life.Battery Bank B Replaced on 820911 & Periodic Electrical Test Procedure Revised + (ML20093A216)
- ML20093A218 + (ML20093A218)
- ML20093A223 + (ML20093A223)
- TXX-4211, Discusses First Cycle Emergency Procedures Re Reactor Vessel Level Instrumentation.Procedures Under Rev to Eliminate Ref to Instrumentation & Will Be Revised After First Refueling When Measurement Sys Becomes Operational + (ML20093A229)
- TXX-4208, Forwards Justification for Interim Operation Re Seismic & Dynamic Qualification Program for Equipment.Encl Analysis Shows Plant Can Be Operated Safely Until Equipment Qualification Programs Completed + (ML20093A230)
- ML20093A235 + (ML20093A235)
- ML20093A236 + (ML20093A236)
- ML20093A241 + (ML20093A241)
- ML20093A242 + (ML20093A242)
- ML20093A247 + (ML20093A247)
- ML20093A248 + (ML20093A248)
- 05000362/LER-1984-021-01, :on 840602,safety Relief Valve 3PSV-0245 on Nuclear Sample Sys Actuated.Caused by Setpoint on Valve Set Unnecessarily Low.Setpoint Raised & Valve Returned to Svc on 840606 + (ML20093A250)
- ML20093A251 + (ML20093A251)
- ML20093A252 + (ML20093A252)
- ML20093A253 + (ML20093A253)
- ML20093A257 + (ML20093A257)
- TXX-4205, Forwards Revised Schedules for Installation of Accident Monitoring Instrumentation for Reactor Vessel Water Level. Installation Scheduled Prior to End of First Refueling Outage.Amend 50 to FSAR Will Reflect Changes + (ML20093A261)
- AECM-84-0345, Forwards Phase 1B Program,Div I Diesel Generator Disassembly,Reinsp & Verification of Div II Diesel Generator As-Mfg Similarity, Per 840522 Order.Preoperational Testing Will Be Completed by 840707 + (ML20093A266)
- ML20093A268 + (ML20093A268)
- ML20093A269 + (ML20093A269)
- ML20093A273 + (ML20093A273)
- ML20093A275 + (ML20093A275)
- 05000272/LER-1984-014-01, :on 840605,vital Bus 1A Deenergized When Bus Infeed Breaker Failed to Close.Caused by Lack of Adequate Procedural or Administrative Controls.Insp & Tests Performed on Diesel 1A + (ML20093A276)
- ML20093A277 + (ML20093A277)
- ML20093A278 + (ML20093A278)
- 05000346/LER-1984-008, :on 840605,shift Supervisor Notified of Documentation Problem W/Seismic Qualification of Transformer Installed in Two Motor Control Ctrs.Caused by Breakdown in Westinghouse Qa.Also Reported Per Part 21 + (ML20093A282)
- ML20093A283 + (ML20093A283)
- ML20093A287 + (ML20093A287)
- ML20093A290 + (ML20093A290)
- ML20093A294 + (ML20093A294)
- ML20093A295 + (ML20093A295)
- ML20093A301 + (ML20093A301)
- ML20093A316 + (ML20093A316)
- ML20093A318 + (ML20093A318)
- ML20093A320 + (ML20093A320)
- A02399, Discusses Position Re Actuation Logic for Reactor Protection Sys & ESF Actuation Sys.Operation in 2 of 3 Logic Configuration W/One Channel in Bypass Justified.More Restrictive Tech Specs Unnecessary + (ML20093A326)
- ML20093A328 + (ML20093A328)
- ML20093A336 + (ML20093A336)
- ML20093A344 + (ML20093A344)
- ML20093A357 + (ML20093A357)
- ML20093A366 + (ML20093A366)
- ML20093A368 + (ML20093A368)
- ML20093A370 + (ML20093A370)
- ML20093A372 + (ML20093A372)
- ML20093A375 + (ML20093A375)