Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20090H930 + (ML20090H930)
- ML20090H933 + (ML20090H933)
- ML20090H934 + (ML20090H934)
- ML20090H936 + (ML20090H936)
- ML20090H937 + (ML20090H937)
- ML20090H939 + (ML20090H939)
- ML20090H941 + (ML20090H941)
- ML20090H942 + (ML20090H942)
- ML20090H944 + (ML20090H944)
- ML20090H945 + (ML20090H945)
- ML20090H948 + (ML20090H948)
- 05000331/LER-1984-022, :on 840619,spurious Isolation Signal Caused Primary Containment Group III Isolation & Standby Gas Treatment Sys Actuation.Initiation Setpoint Not Reached.Sys Restored to Normal Operation + (ML20090H950)
- ML20090H954 + (ML20090H954)
- ML20090H957 + (ML20090H957)
- ML20090H958 + (ML20090H958)
- ML20090H960 + (ML20090H960)
- ML20090H962 + (ML20090H962)
- ML20090H963 + (ML20090H963)
- ML20090H965 + (ML20090H965)
- ML20090H966 + (ML20090H966)
- ML20090H968 + (ML20090H968)
- ML20090H970 + (ML20090H970)
- 05000373/LER-1984-038, :on 840622,repaired Penetration Found Improperly Sealed & W/O Required Fire Watch.New Work Request Issued for Repair & Hourly Fire Watch Initiated.Reexam of Fire Walls to Be Made & Procedures Revised + (ML20090H977)
- ML20090H978 + (ML20090H978)
- 05000331/LER-1984-023, :on 840619,w/plant at 75% Power,Surveillance Test Revealed Three of Four Reactor High Pressure Switches Out of Tolerance in Nonconservative Direction.Switches Recalibr,Returned to Svc & Retested + (ML20090H979)
- ML20090H982 + (ML20090H982)
- ML20090H986 + (ML20090H986)
- ML20090H989 + (ML20090H989)
- ML20090H992 + (ML20090H992)
- ML20090H999 + (ML20090H999)
- ML20090J003 + (ML20090J003)
- ML20090J005 + (ML20090J005)
- ML20090J007 + (ML20090J007)
- 0CAN058408, Provides Brief Description of Interim Guideline to Correlate post-accident Sampling Sys Readings to Core Damage,Per NUREG-0737,Item II.B.3 & 840313 Commitment.Fuel Condition Divided Into Four Categories + (ML20090J011)
- ML20090J012 + (ML20090J012)
- 05000250/LER-1982-020-03, /03L-0:on 820511,insufficient Data Recorded to Verify Satisfactory Performance of Emergency Diesel Generator Cooling Sys.Caused by Inadequate Review of Operating Procedure 4304.1.Procedures Revised + (ML20090J013)
- ML20090J016 + (ML20090J016)
- 05000423/LER-1992-003-01, :on 920207,inadvertent Encl Bldg Integrity Breach Occurred.Caused by Inadequate Work Planning.Encl Bldg Integrity Restored & Erosion/Corrosion Exam Procedure Changed + (ML20090J028)
- 05000250/LER-1984-018, :on 840717,Part 21 Deficiency Identified Deenergizing of Interlocking Relays to safety-related Valves in RHR Pump Suction & Discharge Lines,Resulting in Inability to Open Valves.Caused by Loss of Power + (ML20090J040)
- ML20090J045 + (ML20090J045)
- 05000298/LER-1992-004, :on 920210,Group 3 Isolation Occurred on High Reactor Water Cleanup Temp.Caused by Failure to Maintain Interim Corrective Actions.Operating Procedures Revised & Isolation Was Reset + (ML20090J049)
- ML20090J053 + (ML20090J053)
- ML20090J056 + (ML20090J056)
- ML20090J061 + (ML20090J061)
- ML20090J067 + (ML20090J067)
- ML20090J071 + (ML20090J071)
- 05000316/LER-1984-009, :on 840410,Cardox Fire Protection Sys on Reactor Cable Tunnel Discovered Isolated W/No Firewatch. Caused by Firewatch & Security Officer Error in Not Checking Appropriate Switch in Normal Position + (ML20090J074)
- ML20090J077 + (ML20090J077)
- ML20090J079 + (ML20090J079)
- ML20090J080 + (ML20090J080)
- ML20090J082 + (ML20090J082)