i a..
MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT l_
DATE July 2, 1984 COMPLsrsu BY D. F.*Heinlein TELEPHONE (114) 676-8208 PART /
OPERATIONS
SUMMARY
C.
iay Unit 1 received Facility Operating License NPF-25 on June 11, 1984.
1 The plant entered Mode 6 when fuel loading commenced on June 13, 1984 at 1923 hours0.0223 days <br />0.534 hours <br />0.00318 weeks <br />7.317015e-4 months <br />.
Fuel loading was completed on June 20, 1984 at 1936 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.36648e-4 months <br />.
2 i
Mode 5 was entered with the tensioning of the last vessel head closure bolts 4
on June 28.1984 at 6203 hours0.0718 days <br />1.723 hours <br />0.0103 weeks <br />0.00236 months <br />.
PART B PORV AND SAFETY VALVE
SUMMARY
i No PORV's or safety valves were challenged during the month.
l V
ll l
l 8407270384 840630 PDR ADOCK 05000483
)
R PDR CA-#804 l
4 05/09/84 q G ~-
QDP-ZZ-04204 Page 1 of 4 i
~.
~
Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT Callaway DATE July 2, 1984 COMPLETED BY K. R. Bryant TELEPHONE (314) 676-8292 MON'IH in n a 149' s
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-het)
(MWe Net) 1 NA 17 0
NA 0
2 gg A
0 3
3,,
4 NA 3
0 5
NA f
21 0
'g NA 0
y NA 0
7 23 a
24 m
g NA 3
0 NA 0
10 26 0
11 27 0
0 0
12 28 13 0
3 n
14 -
0 30 0
15 0
31 NA 0
is 0 [fh84 l
Page 2 of 4 QDP-ZZ-04204
),
J..
Part D OPERATING DATA REPORT 50-483 00CKET NO.
UNIT Callaway July 2, 1984 DATE I
COMPLFTED BY K. R. Bryant (314) 676-8292 TELEPHONE OPEflATING STATUS 480 June 1984 GROM MOURS IN REPORTING PERIOO:
- t. REPORTING PERIOD:
3411 Max. DEPENO. CAPACITY IMWo.Ned:
0
- 2. CURRENTLY AUTHORIZED POWER LEVEL (mwd:
DESIGN ELECTRICAL RATING (MWo.Ned:
i17%
O 0
- 3. POWER LEVEL TO WHICM RESTRICTED (IF ANYI (MWo.Ned:
- 4. REASONS FOR RESTRICTION (IP ANYi: Required to meet commitments listed in Operating License THIS MONTM VR 70 DATE CUMULATIVE NPF-25 before exceeded 5% Rated Thermal Power 0
0 0
- 5. NUMeER OF MOURS REACTOR WAS CRITICAL 0
0 0
S. REACTOR RESERVE SMUTDOWN MOURS 0
0 0
- 7. MOURS GENERATOR ON LINE.
0 0
0
- 8. UNIT RESERVE SMUTDOWN MOURS..
0 0
0
- 9. GROSS THERMAL ENERGY GENERATED (MWHI 0
0 0
- 10. GROSS ELECTRICAL ENERGY GENER ATED IMWM)...
0 0
0
- 11. NET ELECTRICAL ENERGY GENERATED (MWM)
NA NA NA
- 12. REACTOR SERVICE FACTOR NA NA NA
- 13. REACTOR AVAILAslLITY FACTOR NA NA NA i
- 14. UNIT SERVICE FACTOR..
NA NA NA
- 15. UNIT AVAILABILITY F ACTOR NA NA NA
- 18. UNIT CAPACITY FACTOR (Dems MOC)
NA NA NA i
- 17. UNIT CAPACITY FACTOR (Dems Demon MWol.......
NA NA NA
- 18. UNIT FORCEO OUTAGE RATE
- 19. SMUTDOWNS SCHEDULED OVER NExT S MONTMS (TYPE. DATE. ANO 00RATidN OF EACMl:
None
- 20. IF SMUT DOWN AT END OF REPORT PERIOO. ESTIMATED DATE OF STARTUP:
8/16/84
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED 8/14/84 INITIAL CRITICALITY 9/2/84 INITIAL ELECTRICITY f
COMMERCIAL OPERATION
'* Forecast completion'of ascension testing 10/29/84.
gg Page 3 of 4 QDP-ZZ-04204
~
~
~,
l.
?
-r
<p..
DOCKET NO. ___50-483 Part E UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway i
QATE July 2.
1984 COMPLETED BY D. E. Heinlein TELErilONE (314) 676-8208 l
REPORT MONTil JUNE 1984
(
9
' METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED IHOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /COMMENTE i
SUMMARY
No unit shutdowns or power reductions as 'he plant is in its initial <tartup and in Mode 5, ascending for the first time.
~
CA-f804 05/09/84 Page 4 of 4 QDP-ZZ-04204
m-y:9-4 3 Q4i
.- f) '
~
UNION ELEcTaic COMPANY
' CALLAWAY PLANT -
July 9,'1984
"^'= ^o oa = :
4 P. O. 50M S20 PULTON, MO. 8 52 59 Director, Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-866 DOCKET NUMBER 50-463 CALLAWAY PLAfft UNIT 1 FACILITY OPERATING LICENSE NPF-25 MONTHLY OPERATING REPORT JUNE 1984
Dear Sir:
The enclosed Monthly Operating Report for June 1984 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
/
S. E. Miltenberger SEM/M
/
drs Enclosure cc w/ encl:
James G. Keppler.
NRC Resident Inspector
.USNRC Region'III Office.p g Missouri Public Service Commission 799 Roosevelt Road 37 v D. F. Schnell
. Glen Ellyn, IL. 60137 J. E. Davis (Z40MOR) -
7 QR. L. Powers Director M
'N..
D. W. Capone
' Office of Inspection & Enforcement A.C.Passwater/D.E.Shafer/D.J. Walker U..S. Nuclear Regulatory Commission
,G. A. Hughes-
! Washington, DC 20555' ' iE W. R. Robinson (QA Record) e P. T. Applebyf
'American' Nuclear Insurers Library SEM Chrono e/o'Dottie Sherman 3456-0021.6
'The Exchange Suite 245 Z40ULNRC
-270 Farmington Avenue G56.37 Farmington, CT 06032 N. Date 4*
r
__. =-____-____----_--__ __- - - - _-_-___--_-_-- -
_-"