MONTHLY OPERATING REPORT DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT l_

DATE July 2, 1984 COMPLsrsu BY D. F.*Heinlein TELEPHONE (114) 676-8208 PART /

OPERATIONS

SUMMARY

C.

iay Unit 1 received Facility Operating License NPF-25 on June 11, 1984.

1 The plant entered Mode 6 when fuel loading commenced on June 13, 1984 at 1923 hours0.0223 days <br />0.534 hours <br />0.00318 weeks <br />7.317015e-4 months <br />.

Fuel loading was completed on June 20, 1984 at 1936 hours0.0224 days <br />0.538 hours <br />0.0032 weeks <br />7.36648e-4 months <br />.

2 i

Mode 5 was entered with the tensioning of the last vessel head closure bolts 4

on June 28.1984 at 6203 hours0.0718 days <br />1.723 hours <br />0.0103 weeks <br />0.00236 months <br />.

PART B PORV AND SAFETY VALVE

SUMMARY

i No PORV's or safety valves were challenged during the month.

l V

ll l

l 8407270384 840630 PDR ADOCK 05000483

)

R PDR CA-#804 l

4 05/09/84 q G ~-

QDP-ZZ-04204 Page 1 of 4 i

~.

~

Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.

UNIT Callaway DATE July 2, 1984 COMPLETED BY K. R. Bryant TELEPHONE (314) 676-8292 MON'IH in n a 149' s

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-het)

(MWe Net) 1 NA 17 0

NA 0

2 gg A

0 3

3,,

4 NA 3

0 5

NA f

21 0

'g NA 0

y NA 0

7 23 a

24 m

g NA 3

0 NA 0

10 26 0

11 27 0

0 0

12 28 13 0

3 n

14 -

0 30 0

15 0

31 NA 0

is 0 [fh84 l

Page 2 of 4 QDP-ZZ-04204

),

J..

Part D OPERATING DATA REPORT 50-483 00CKET NO.

UNIT Callaway July 2, 1984 DATE I

COMPLFTED BY K. R. Bryant (314) 676-8292 TELEPHONE OPEflATING STATUS 480 June 1984 GROM MOURS IN REPORTING PERIOO:

t. REPORTING PERIOD:

3411 Max. DEPENO. CAPACITY IMWo.Ned:

0

2. CURRENTLY AUTHORIZED POWER LEVEL (mwd:

DESIGN ELECTRICAL RATING (MWo.Ned:

i17%

O 0

3. POWER LEVEL TO WHICM RESTRICTED (IF ANYI (MWo.Ned:
4. REASONS FOR RESTRICTION (IP ANYi: Required to meet commitments listed in Operating License THIS MONTM VR 70 DATE CUMULATIVE NPF-25 before exceeded 5% Rated Thermal Power 0

0 0

5. NUMeER OF MOURS REACTOR WAS CRITICAL 0

0 0

S. REACTOR RESERVE SMUTDOWN MOURS 0

0 0

7. MOURS GENERATOR ON LINE.

0 0

0

8. UNIT RESERVE SMUTDOWN MOURS..

0 0

0

9. GROSS THERMAL ENERGY GENERATED (MWHI 0

0 0

10. GROSS ELECTRICAL ENERGY GENER ATED IMWM)...

0 0

0

11. NET ELECTRICAL ENERGY GENERATED (MWM)

NA NA NA

12. REACTOR SERVICE FACTOR NA NA NA
13. REACTOR AVAILAslLITY FACTOR NA NA NA i
14. UNIT SERVICE FACTOR..

NA NA NA

15. UNIT AVAILABILITY F ACTOR NA NA NA
18. UNIT CAPACITY FACTOR (Dems MOC)

NA NA NA i

17. UNIT CAPACITY FACTOR (Dems Demon MWol.......

NA NA NA

18. UNIT FORCEO OUTAGE RATE
19. SMUTDOWNS SCHEDULED OVER NExT S MONTMS (TYPE. DATE. ANO 00RATidN OF EACMl:

None

20. IF SMUT DOWN AT END OF REPORT PERIOO. ESTIMATED DATE OF STARTUP:

8/16/84

21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED 8/14/84 INITIAL CRITICALITY 9/2/84 INITIAL ELECTRICITY f

COMMERCIAL OPERATION

'* Forecast completion'of ascension testing 10/29/84.

gg Page 3 of 4 QDP-ZZ-04204

~

~

~,

l.

?

-r

<p..

DOCKET NO. ___50-483 Part E UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway i

QATE July 2.

1984 COMPLETED BY D. E. Heinlein TELErilONE (314) 676-8208 l

REPORT MONTil JUNE 1984

(

9

' METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED IHOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS /COMMENTE i

SUMMARY

No unit shutdowns or power reductions as 'he plant is in its initial <tartup and in Mode 5, ascending for the first time.

~

CA-f804 05/09/84 Page 4 of 4 QDP-ZZ-04204

m-y:9-4 3 Q4i

.- f) '

~

UNION ELEcTaic COMPANY

' CALLAWAY PLANT -

July 9,'1984

"^'= ^o oa = :

4 P. O. 50M S20 PULTON, MO. 8 52 59 Director, Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-866 DOCKET NUMBER 50-463 CALLAWAY PLAfft UNIT 1 FACILITY OPERATING LICENSE NPF-25 MONTHLY OPERATING REPORT JUNE 1984

Dear Sir:

The enclosed Monthly Operating Report for June 1984 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

/

S. E. Miltenberger SEM/M

/

drs Enclosure cc w/ encl:

James G. Keppler.

NRC Resident Inspector

.USNRC Region'III Office.p g Missouri Public Service Commission 799 Roosevelt Road 37 v D. F. Schnell

. Glen Ellyn, IL. 60137 J. E. Davis (Z40MOR) -

7 QR. L. Powers Director M

'N..

D. W. Capone

' Office of Inspection & Enforcement A.C.Passwater/D.E.Shafer/D.J. Walker U..S. Nuclear Regulatory Commission

,G. A. Hughes-

! Washington, DC 20555' ' iE W. R. Robinson (QA Record) e P. T. Applebyf

'American' Nuclear Insurers Library SEM Chrono e/o'Dottie Sherman 3456-0021.6

'The Exchange Suite 245 Z40ULNRC

-270 Farmington Avenue G56.37 Farmington, CT 06032 N. Date 4*