Monthly Operating Rept for June 1984
ML20090H962
Person / Time
Site: Ginna 
Issue date: 06/30/1984
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML20090H961 List:
References
NUDOCS 8407270309
Download: ML20090H962 (5)


Text

.

'?

e,

.l.

OPERATING DATA REPORT DOCKET NO.

50-244 DATE July 19. 1984 COMPLETED BY F MO --- u Andrew E.

McNamara TE LE Pil'ONE 1(315) 524-4446 OPERATING STATUS Ext. 301

1. Unit Name:

GINNA STATION. UNIT #1 Notes

2. Reporting Period:

June 1984 The unit returned to 3 1.icensed Thermal Power (MW ):

1520 service on 6/2/84 after

4. Nameplate Rating (Gross MWe):

490 a shutdown that began on

5. Design Electrical Rating (Net MWe):

470 5/30/84 for a generator

6. Maximum Dependable Capacity (Gross MWe):

490 exciter cooler failure.

Details on Page 4.

7. Maximum Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any-This Month Yr.-to-Da te Cumulative
11. Ilours In Reporting Period 720 4,367 127,943
12. Number of Ilours Reactor Was Critical 704.50 2,431.73 96,031.71
13. Reactor Reserve Shutdown flours 15.50 56.23 1.687.55*

.14. Ilours Generator On-Line 688.25 2.363.75 93.875.38

15. Unit Reserve Shutdown flours 0.00 0.00 8.50*
16. Gross Thermal Energy Generated (MWil) 1,002,072-3,369,936 129,627,305
7, c,a Ebrrical Energy Generated (MW11).

337,733 1,121,605 42,285,975

18. Net Electrical Energy Generated (MWil) 321.073 1.064.808 40.091.053
19. Unit Service Factor 95.59%

54.13%

73.37%

20. Unit Availability Factor 95.59%

54.13%

73.38%

21. Unit Capacity Factor (Using MDC Nety 94.88% _

51.88%

68.39%

22. Unit Capacity Factor (Using DER Net) 94.88%

51.88%

68.39%

23. Unit Forced Outage Rate 4.41%

10.07%

8.07%

24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

- 25. If Shur Down At End Of Report. Period, Estimated Date of Startup:

26. Units la Test Status (Prior to Commercial Operation):

Forecast :

Achieved l

INITIAL CRITICALITY -

)

IN!!!AL ELECTRICITY COMMERCIAL OPERATION l

  • Cummulative total commencing' January 1, 1975' 8407270309 840719

.,,cy,,,u,.

PDR ADOCK 05000244 R

PDR Y

~.

~-

z-

. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT

  1. 1, Ginna Station DATE July _19, 1984 COMPLETED BY

[i,,W f. )M-y1h Andrew E. McNahara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH June 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

( MWe-Net) 1.

17.

488 2.

206 18.

488 3.

_415_

19.

487 4.

325 20.

_487 5.

366 21.

488 6.

488 22.

487 7.

483_

23.

487 8.

479 24.

487 9.

484 25.

487 10.

_483 26.

_486 11.

485 27.

483 l

12.

484 28.

463

'13, 484 29.

485 14.

483 30.

484 15.

487 31.

16.

488-INSTRUCTIONS.

.Orr this format, list the average daily unit power level in MWe-Net for each day in.t he reporting month.

Compute to the nearest whole megawatt.

~

D(X:KET NO.

50 244 UNIT NAME #1,Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE July 19. 1984 CONfPLETED llY ded:# f. h41a----

1 REPORT MONTil June. 1984 TELEPIIONEI(

52 4 4 Ext. 301 m

Eq oy Licensee e,,

m Cause & Corrective No.

Da te

{

jj

]o j j

$j Event j..

g Action to v

Prevent Recurrence p

gz g

Report #

yj 2

g U

Q 84-4 Began on F

31.75*

A 1

N/A HA Exciter Air cooler gasket, poor 5/30/84 Failure compression.

Shimmed air Ended on cooler to provide proper 6/02/84 alignment; sealant on both sides of gasket.

  • Hours in June only 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee 3-Automatic Scram.

Event Report (LER) File (NUREG-C-Refueling 4-Other (Explain) 0161)

D-Regulatory Restriction E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain) inrv. inns ll-Other (Explain)

Exhibit 1 - Same Source

[

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna_ Station, Unit #1 DATE July 19, 1984 COMPLETED BY d h-Andrew E.

McNdmara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH June 1984 The unit was returned to service on June 2, 1984 after repairs were effected on the turbine generator exciter cooler.

Repairs are detailed on Page 3 of this report.

The reactor power level was escalated to ~ 87% on June 3; on that date a power reduction was initiated to ~ 50% power for inspection of the "B" Condenser for suspected tube plugging problems.

The power level was gradually increased on 6/5 to ~ 90% and full 100% power level was not reached until 6/8 due to heater drain tank problems.

The reactor power level remained at 100% until 6/15 when it was reduced to ~ 98% to perform periodin tests on the Auxiliary Feedwater System.

On 6/27 the reactor power level was reduced to ~ 90% power level due to a turbine runback initiated by a dropped rod signal which proved erroneous.

On 6/28 the reactor power level was reduced ~ 80% due to a loss of condenser vacuum.

GINNA STATION l

. HAINTENANCE REPORT

SUMMARY

JUNE, 1984-

- During the Month of June, routine maintenance and inspections were completed along with maintenance scheduled during the current Refueling Outage.

Safety relatad maintenance included:

1. -

Major inspection of the lA Reactor Coolant Drain Tank Pump.

2.

Minor inspection of the 1C Standby Aux. Feedwater Pump.

- 3.

Calibration of Delta T and TAVG. Spans 4.

At Power Alignment of Control Rod Position Indication System

. all banks.

l

!=

L

^>

gmy.'.d p

e

+

.sy.--