.%Aa:2 M Y NIAGARA RUMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST, SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 July 13, 1984 (NMP2L0109)
Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission
-Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re:'Nine Mile Point Unit 2 Docket No. 50-410
Dear Mr. Starostecki:
Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning the main steam isolation valves furnished by Gulf &
Western / Fluid Systems Division. This problem was reported via telecon to Mr.
S. Collins of your staff on June 15, 1984.
Very truly yours, s.
C. V. Mangan Vice President Nuclear Engineering & Licensing TL:Ja Enclosure xc: ' Director.of Inspection and Enfarcement U.S. Nuclear Regulatory Commission Washington, DC 20555 R. A. Gr.imm, Resident Inspector Project File ohho PDR 1i s
e
I
/
NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET N0. 50-410 1
Interim Report for a Problem Concerning the Main Steam Isolation Valves (55(e)-84-23)
Problem Description During a review of documentation, it was observed that the certified material test reports (CMTRs) provided by the valve manufacturer do not document the test coupon heat treatment duration and temperature as required by ASME Section III, NB-2211. Further inquiry revealed that the heat treatment of the test coupons was not performed. A final report will be issued by October 14, 1984.