Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085J577 + (ML20085J577)
- ML20085J579 + (ML20085J579)
- ML20085J593 + (ML20085J593)
- ML20085J594 + (ML20085J594)
- ML20085J595 + (ML20085J595)
- ML20085J602 + (ML20085J602)
- ML20085J621 + (ML20085J621)
- RBG-16-057, Interim Deficiency Rept DR-74.Investigation Incomplete. Next Rept Will Be Submitted by 831117 + (ML20085J622)
- RBG-16-076, Final Deficiency Rept DR-117 Re Previously Unanalyzed Containment Negative Pressure Scenario.Condition Does Not Meet Criteria for Reportability Under 10CFR50.55(e) + (ML20085J628)
- ML20085J634 + (ML20085J634)
- ML20085J639 + (ML20085J639)
- ST-HL-AE-1011, First Interim Deficiency Rept Re Design Basis Flood Calculations Not Considering Erosion Effects of Postulated Embankment Breach.Initially Reported on 830830.Next Rept Expected by 840120 + (ML20085J646)
- ML20085J647 + (ML20085J647)
- ML20085J649 + (ML20085J649)
- TXX-4054, Interim Deficiency Rept Re Temp in Excess of FSAR Parameters Experienced in Annulus Between Reactor Vessel Insulation & Shield Wall.Cooling Increased by Reducing Chilled Water Temp & Installing Addl Cooling Coil + (ML20085J654)
- ML20085J659 + (ML20085J659)
- ML20085J660 + (ML20085J660)
- ML20085J663 + (ML20085J663)
- ML20085J664 + (ML20085J664)
- ML20085J665 + (ML20085J665)
- ML20085J668 + (ML20085J668)
- TXX-3592, Final Deficiency Rept Re Pipe Wall Thickness of Reactor Coolant Pressurizer Surge Line.Initially Reported on 821101. Deficiency Not Reportable Per 10CFR50.55(e) + (ML20085J670)
- ML20085J672 + (ML20085J672)
- ML20085J673 + (ML20085J673)
- ML20085J676 + (ML20085J676)
- ML20085J677 + (ML20085J677)
- ELV-03163, Submits Implementation Plan for ERDS Program,Per NUREG-1394, Rev 1 & 910813 Publication of Final Rule in Fr.All NRC Required Plant Parameters Will Be Transmitted from Existing Emergency Response Facility Computers to Pc Workstations + (ML20085J679)
- ML20085J680 + (ML20085J680)
- ML20085J682 + (ML20085J682)
- ELV-03131, Submits Results of Review of Cycle 4 Core Reload Design & Util Plans Re Implementation.Reload Safety Evaluation Demonstrated That Addl Tech Spec Changes Not Required for Operation During Cycle 4 + (ML20085J687)
- ML20085J692 + (ML20085J692)
- 05000368/LER-1983-043-03, /03L-0:on 830907,contract Person Posted for Fire Watch Duty Discovered Asleep.Individual Awakened & Relieved.Disciplinary Actions Taken.Fire Watch Policy Expanded + (ML20085J693)
- ML20085J694 + (ML20085J694)
- 05000220/LER-1995-003-01, :on 950516,discovered That Three I&C Sps Not Performed in Compliance W/Frequency in TS SRs Due to Cognitive Personnel Error.Missed Surveillances Performed & Affected I&C Procedures Will Be Revised + (ML20085J695)
- ML20085J696 + (ML20085J696)
- 05000424/LER-1991-007-03, :on 910925,fuel Handling Bldg Isolation Occurred During Checks of Radiation Monitor.Cause Not Determined.Esf Signal Will Be Blocked When Work Performed at safety-related Display Console + (ML20085J698)
- ML20085J702 + (ML20085J702)
- ELV-03106, Forwards Response to Generic Ltr 91-06, Resolution of Generic Issue A-30, Adequacy of Safety-Related DC Power Supplies + (ML20085J714)
- ML20085J716 + (ML20085J716)
- ML20085J721 + (ML20085J721)
- 3F1091-09, Forwards Relief Request 91-010 from ASME Case Code N-498 Re Hydrostatic Testing of Class 1 & 2 Sys.Alternate Exams Will Be Performed on Class 1 & 2 Sys Starting W/Refuel 8 + (ML20085J722)
- ML20085J728 + (ML20085J728)
- ML20085J729 + (ML20085J729)
- ML20085J733 + (ML20085J733)
- ML20085J741 + (ML20085J741)
- ML20085J743 + (ML20085J743)
- ML20085J744 + (ML20085J744)
- ML20085J746 + (ML20085J746)
- BVY-91-106, Comments on NRC Proposed Amend to Policy Statement Re Cooperation W/States at Commercial Nuclear Power Plants. Consistent W/Mou,Util Established Position of State Liaison Engineer to Communicate W/State of VT + (ML20085J751)
- 05000425/LER-1991-010-02, :on 910923,discovered That Percentage of Ash Content for Diesel Fuel Oil & Fuel Oil Storage Tanks 2A & 2B Delivered/Offloaded on 910813 Not Shown.Caused by Personnel Error.Lab Corrected Testing Info + (ML20085J754)
- ST-HL-AE-1008, Supplemental Final Deficiency Rept Re Westinghouse Supplied Pressure & Level Transmitters.Transmitters Will Be Provided for Applications Described in ,Per Westinghouse Group B & WCAP-8587 Generic Qualifications + (ML20085J756)