Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083K347 + (ML20083K347)
- BSEP-95-0193, Requests Concurrence W/Change to CP&L re-inspection Schedule for Two 28-inch Reactor Recirculation Sys Suction piping-to-elbow Welds for BSEP Unit 1 + (ML20083K348)
- ML20083K356 + (ML20083K356)
- ML20083K357 + (ML20083K357)
- ML20083K361 + (ML20083K361)
- ML20083K365 + (ML20083K365)
- PLA-2166, Part 21 Rept Re Failure of Crosby IMF-2 Solenoids Supplied by Ge.Initially Reported on 840403.Licensee & GE Jointly Developed Test Procedures to Bench Test Spares & Solenoids on Both Units.Testing Complete on Unit 1 + (ML20083K366)
- ML20083K368 + (ML20083K368)
- ML20083K370 + (ML20083K370)
- ML20083K373 + (ML20083K373)
- IR 05000338/1978029 + (ML20083K375)
- ML20083K376 + (ML20083K376)
- ML20083K386 + (ML20083K386)
- ML20083K387 + (ML20083K387)
- ML20083K388 + (ML20083K388)
- NLS8400101, Forwards Rev 2 to Emergency Plan & Rev 3 to Emergency Plan Implementing Procedure EPIP 5.7.21, Emergency Equipment Inventory + (ML20083K392)
- ML20083K393 + (ML20083K393)
- ML20083K409 + (ML20083K409)
- ML20083K419 + (ML20083K419)
- ML20083K425 + (ML20083K425)
- IR 05000324/1978032 + (ML20083K428)
- ML20083K432 + (ML20083K432)
- ML20083K435 + (ML20083K435)
- NG-84-1302, Responds to NRC Re Violations Noted in IE Insp Rept 50-331/84-02.Corrective Actions:Instrument Technician Informed of Gravity of Error in Test Procedures & Instructed to Exercise More Caution in Future + (ML20083K438)
- ML20083K443 + (ML20083K443)
- ML20083K445 + (ML20083K445)
- ML20083K448 + (ML20083K448)
- ML20083K450 + (ML20083K450)
- ML20083K463 + (ML20083K463)
- ML20083K470 + (ML20083K470)
- ML20083K476 + (ML20083K476)
- ML20083K477 + (ML20083K477)
- TXX-2939, Forwards Revised Chapter 17.1 of Fsar,Amend 4 + (ML20083K480)
- ML20083K484 + (ML20083K484)
- ML20083K486 + (ML20083K486)
- ML20083K488 + (ML20083K488)
- ML20083K495 + (ML20083K495)
- 05000368/LER-1978-024, Forwards LER 78-024/03L-0,78-025/03L-0 & 78-026/03L-0 + (ML20083K497)
- ML20083K502 + (ML20083K502)
- 05000368/LER-1978-024-03, /03L-0 on 781214:barrel Test on Emergency Escape Hatch 2C4 & Personnel Hatch 2C2 Not Performed as Scheduled. Caused by Scheduling Error Due to Responsibility Change of Supervisors.Test Completed on 781215 + (ML20083K504)
- 05000321/LER-1979-001, Forwards LER 79-001/03L-0 + (ML20083K508)
- ML20083K509 + (ML20083K509)
- ML20083K512 + (ML20083K512)
- 05000368/LER-1978-025-03, /03L-0 on 781214:during Low Power Physics Testing, Ceac 1 Rendered Inoperable.Caused by Accidental Shorting of Leads to Common During Calibr of digitial-to-analog Converters in Core Protection Computer Channel B + (ML20083K513)
- ML20083K515 + (ML20083K515)
- 05000321/LER-1979-001-03, /03L-0 on 790109:during Steady State Power at 2400 Mwt,Plant Personnel Inadvertently Opened Both Doors of Reactor Bldg 130-ft Airlock R106.For Reasons Unknown,Switch Which Allows Defeat of Interlock Was Operated + (ML20083K516)
- 05000368/LER-1978-026-03, /03L-0 on 781216:during Normal Testing 2CV-1039-2 Failed to Operate from Control Room,Rendering Emergency Feedwater Pump 2P7A Inoperable.Failure Located in Solid State Relay Actuating 2CV-1039-2 + (ML20083K521)
- ML20083K522 + (ML20083K522)
- ML20083K525 + (ML20083K525)
- 05000333/LER-1978-112, Forwards LER 78-112/03L-0 + (ML20083K526)
- ML20083K530 + (ML20083K530)