Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080K821 + (ML20080K821)
- ML20080K824 + (ML20080K824)
- ML20080K826 + (ML20080K826)
- ML20080K828 + (ML20080K828)
- A10023, Discusses Review of RI-91-A-276 Re Various Activities at Millstone Unit 2.W/related Matl + (ML20080K832)
- PY-CEI-NRR-1915, Forwards Semiannual FFD Rept for Period 940701-1231 + (ML20080K841)
- A10024, Discusses Review of RI-91-A-278 Re Various Activities at Millstone Unit 2.W/related Matl + (ML20080K842)
- W3P84-0249, Forwards Updated Tab K to Environ Qualification Audit for Closing Out Open Items Contained in App 3B to Sser 5 + (ML20080K847)
- A10069, Discusses Review of RI-91-A-0289 Re Various Activities at Millstone Unit 2 + (ML20080K850)
- ML20080K855 + (ML20080K855)
- ML20080K856 + (ML20080K856)
- ML20080K862 + (ML20080K862)
- ML20080K867 + (ML20080K867)
- ML20080K883 + (ML20080K883)
- ML20080K890 + (ML20080K890)
- ML20080K903 + (ML20080K903)
- JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation + (ML20080K929)
- ML20080K930 + (ML20080K930)
- ML20080K934 + (ML20080K934)
- ML20080K939 + (ML20080K939)
- 0CAN029512, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/94-24 & 50-368/94-24.Corrective Actions:Initial Training of Sys Engineering Personnel Has Been Conducted Through Supervisory Discussion of Circumstances + (ML20080K942)
- ML20080K944 + (ML20080K944)
- ML20080K951 + (ML20080K951)
- ML20080K959 + (ML20080K959)
- ML20080K967 + (ML20080K967)
- ML20080K970 + (ML20080K970)
- ML20080K973 + (ML20080K973)
- TXX-4049, Advises That Emergency Preparedness Field Exercise Postponed from 831005 to 831214,due to Rescheduling of Emergency Preparedness Planning Activities + (ML20080K974)
- ML20080K977 + (ML20080K977)
- ML20080K981 + (ML20080K981)
- ML20080K985 + (ML20080K985)
- ML20080K990 + (ML20080K990)
- ML20080K996 + (ML20080K996)
- ML20080K999 + (ML20080K999)
- ML20080L007 + (ML20080L007)
- ML20080L019 + (ML20080L019)
- ML20080L025 + (ML20080L025)
- ML20080L028 + (ML20080L028)
- ML20080L029 + (ML20080L029)
- 05000327/LER-1983-115-03, /03L-0:on 830827,while in Mode 1,operator for Auxiliary Bldg Gas Treatment Sys Damper 1-FCV-30-146A Disconnected.Caused by Loose Locking Nuts.Linkage Reconnected.Nuts Tightened + (ML20080L037)
- 05000321/LER-1983-093-03, /03L-0:on 830824,while Starting Hpci,Hpci Turbine Bearing Oil Pressure Low Alarm Received.Hpci Manually Tripped & Declared Inoperable.Caused by Personnel Error. Valves Repositioned & Oil Pressures Adjusted + (ML20080L039)
- ML20080L040 + (ML20080L040)
- ML20080L042 + (ML20080L042)
- ML20080L045 + (ML20080L045)
- U-602412, Provides Info Updating Risks of Flammable & Toxic Hazards Associated W/Railroad Transportation Past Plant + (ML20080L047)
- 05000373/LER-1995-003-01, :on 950127,potential Traversing in-core Probe Containment Isolation Design Concern Noted.Interim Administrative Controls Put in Place to Ensure That Containment Isolation Function Not Compromised + (ML20080L057)
- ML20080L060 + (ML20080L060)
- BSEP-95-0110, Forwards Summary Description of Proposed Vehicle Control Measures Required for Protection Against Malevolent Use of Vehicles at Nuclear Power Plants.Encl Withheld + (ML20080L063)
- ML20080L064 + (ML20080L064)
- ML20080L065 + (ML20080L065)
- ML20080L066 + (ML20080L066)