Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077J072 + (ML20077J072)
- ML20077J073 + (ML20077J073)
- ML20077J074 + (ML20077J074)
- 05000220/LER-1983-022-01, /01T-0:on 830721,during Normal Operation,Gap Observed Under Outside Reactor Bldg Track Bay Door.Caused by Failure to Reinstall Removable Seals.Seals Installed. Procedures Reviewed W/Personnel + (ML20077J075)
- ML20077J076 + (ML20077J076)
- ML20077J078 + (ML20077J078)
- ML20077J079 + (ML20077J079)
- ML20077J081 + (ML20077J081)
- ML20077J084 + (ML20077J084)
- ML20077J086 + (ML20077J086)
- ML20077J089 + (ML20077J089)
- ML20077J091 + (ML20077J091)
- ML20077J092 + (ML20077J092)
- ML20077J093 + (ML20077J093)
- ML20077J094 + (ML20077J094)
- ML20077J096 + (ML20077J096)
- ML20077J097 + (ML20077J097)
- ML20077J098 + (ML20077J098)
- 05000220/LER-1983-018-03, /03L-0:on 830709,Agastat Time Delay Relay 11K62A Failed to Time Out at Correct Time & to Initiate Emergency Cooling Sys.Caused by Dirty Timing Orifice.Needle Valve Exercised & Timer Reset + (ML20077J099)
- ML20077J100 + (ML20077J100)
- ML20077J104 + (ML20077J104)
- W3P83-2661, Forwards Organization Chart,Providing for Onsite & Offsite Mgt & Technical Resources to Complete Const & to Conduct Preoperational/Startup Testing in Timely Manner. Reorganization Details Will Be Provided in FSAR Amend + (ML20077J106)
- ML20077J107 + (ML20077J107)
- ML20077J108 + (ML20077J108)
- ML20077J109 + (ML20077J109)
- ML20077J110 + (ML20077J110)
- RBG-15-609, Interim Deficiency Rept DR-123 Re Nonconforming Welds & Possible Fabrication Errors in Mccrosky Sheet Metal HVAC Ductwork.Initially Reported on 830706.Investigation Incomplete.Next Rept Will Be Provided by 830919 + (ML20077J111)
- NRC-83-0044, Forwards Addl Info for Resolution of Power Sys Branch SER Confirmatory Items 20,21 & 38 Re Load Shedder,Emergency Load Sequencer & ESF Transformers,Respectively + (ML20077J112)
- ML20077J113 + (ML20077J113)
- ML20077J120 + (ML20077J120)
- ML20077J121 + (ML20077J121)
- ML20077J122 + (ML20077J122)
- NLS2020014, Nebraska Public Power District - Report of Changes to Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46 + (ML20077J126)
- ML20077J131 + (ML20077J131)
- ML20077J135 + (ML20077J135)
- 05000311/LER-1983-035-01, /01T-0:on 830725,flux Map Results Indicated That Tech Spec Limits for Enthalpy Hot Channel Factor Would Be Exceeded During Low Power Operation W/Control Rods Near Insertion Limits.Caused by Improper Modeling + (ML20077J147)
- ML20077J149 + (ML20077J149)
- ML20077J150 + (ML20077J150)
- ML20077J151 + (ML20077J151)
- ML20077J161 + (ML20077J161)
- ML20077J171 + (ML20077J171)
- ML20077J172 + (ML20077J172)
- ML20077J173 + (ML20077J173)
- ML20077J174 + (ML20077J174)
- ML20077J175 + (ML20077J175)
- ML20077J177 + (ML20077J177)
- ML20077J178 + (ML20077J178)
- ML20077J179 + (ML20077J179)
- ML20077J180 + (ML20077J180)
- ML20077J182 + (ML20077J182)
- ML20077J185 + (ML20077J185)