ML20077J108
| ML20077J108 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/02/1983 |
| From: | Norris H, Starkey R CAROLINA POWER & LIGHT CO. |
| To: | Deyoung R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| RSEP-83-1022, NUDOCS 8308150222 | |
| Download: ML20077J108 (4) | |
Text
,
n
.,1 l
.a OPERATINC DATA REPORT DOCKET -NO.
050-0261 DATE 08/02/83 COMPLETED BY H.' RAY NORRIS TELEPHONE (803)383-4524
[0PERATING STATUS 4
3-
-i.-UNIT NAME: ROBINSON UNIT 2 1 NOTES 1
- 2. REPORTING PERIOD: JULY 83 i
- 3. LICENSED THERMAL POWER (MWT) 2300 1 There are presently 157, spent fuelI
- 4 NAMEPLATE RATING (GROSS MWE) 739.0 l assemblies in the Spent Fuel Pool.l
- 5. DESIGN ELECTRICAL RATING (NET MWE) 700.0 1
I
- 6. MAX DEPENDABLE. CAPACITY.(GROS.S-MWE) 700.0 l 1
- ~ ~ - - - - - - ~ - - - - - ' - - - -
-7.
MAX DEPENDABLE CAPACITY.(NET MUE) 665.0 O.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
No change, i
- 9. POWER LEVEL TO.WHICH RESTRICFED IF ANY (NET MWE) :1955 MW reactor. power iO. REASONS FOR RESTRICTION IF ANY: Although the unit is not. restricted _by any outside agency, the power level is presently reduced due to Steam Generator: considerations.
P THIS YR TO CUMUL MONTR DATE
-ATIVE ti. HOURS IN REPORTING PERIOD 744.00
'5087.00.
108773.00 I
Si123.86-3
- 12. NUMBER OF HOURS REACTOR CRITICAL 1 722.99 4284.09 fi624.'60
-13.
REACTOR RESERVE SHUTDOWN HRS 21'01 316.83 t
i ' 14. HOURS GENERATOR ON LINE 72f.57' J4173. ')2
.79009.06' p
- 15. UNIT RESERVE SHUTDOWN HOURS
.00;
.s 23.'20 00
^
1 16. GROSS THERMAL ENERGY GEN. (MWH) 1209306.405 733'i 3 i 6. 24 150395907.76.
l - 17. GROSS ELEC. ENERGY GEN. (MWH) 399844.00 (2335910.00 50844673.00-18.' NET ELEC. ENERGY' GENERATED (MWH)
'375135.00_
2185393.00 480574?5.00
'19. UNIT-SERVICE FACTOR 96.99:
82.03
~>2 2 64 3
I 20. UNIT AVAILADILIT.Y FACTOR 96.9Y 82103 72.66
.75.82
=
l64160
-66.44
- 22. UNIT CAP. FACTOR (USING DER NET) 72.03' 61.37 1
-63.12
':23. UNIT FORCED OUTAGE RATE 3.01
'4.96' 13.77l
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE,. ANT DUfMJION' 0F EACH).
Type'2~, October 6, 1983, four week Steam' Generator-Inspeccion Outage.
(
! 25. IF SHUTDOWN AT END OF_ REPORT -PERIOD, -ESTIMATED DATE OF: START UP' on line 26 UNITS IN TEST STATUS- (PRIOR TO COMiiERCI AL OPERAT11NV' FORCAST ACHEIVED.
- s; c
s L
INITIAL. CRITICALITY-a-----"
- H:
-~~~W
.i INITIAL-ELECTRICITY
.j t
j __ g
___s
-J--~-
b-r------
, COMMERCIAL ~0PERATION.
L p
t i
m f
8308150222 030002 4
PDR ADOCK 05000261 I.'.
l
~
l, 4
?
lJ..'
1 R
PDR 1 Ji6) 9;-
Nn..
L ry
+
v
=
APPENDIX D AVERAGE DAILY POWER LEVEL DOCKET NO.. 050-0261 x
UNIT ROBINSON UNIT 2 DATE 08/02/83 COMPLETED BY H.
RAY NORRIS TELEPHONE (003)383-4524 JULY 1983 DAY AVG. DAILY POWER' LEVEL DAY.
AVG. DAILY POWER LEVEL (tiWE-NET)
(MWE-NET) i 536 1 '7 522
~2 537 i8 523 535 19 523 3
'4 S38 20 524 5
535 21 525 6
535 22 522 7
-532 23 528.
0 533 24
- 483 9
533 25 528 10 492 26 530 11 534 27 -
532 12' 536 28 44' 13 537.
29 277 14 537 30 529 15 534 31
- 530 16 529 9
i.i6 8
?
. Fn
---_-__a-_------__-----------.--a,-._a_.ma--s----
--m------s_----
1-,--
.---n
50-261 ilNITSilVTDOWNS / N01'0WEll It E!)tlCTIONS DOCKET NO[
IJNIT NAal!
H. B. ROBINSON DNIE.__83D1D2.
C0alPl.ETED ilY A. E. Scott ltE!'OllT A!0 frill July
'l El.EI'lIONE 803-383-4524___
...e.
8:
c_
ra 5 :a 1 O Hise.$ Correclive No,
(),gre "h
h,
.'2 5 x h."
25 u
,e vent
=?
o.8 Act;i,n i,,
s.
$3 j@g l(cpure se iN 0 hO g,revent l(ccuarence v
3O 07-01 830701 S
0 A
4 HB HTEXCh Power reduction to approximately 80%
due to Steam Generator considerations.
07-02 830728 F
22.43 D
1 83-16 CH VALVEX Two Auxiliary Feedwater System Steam drive turbine pump discharge valves were leaking hot Feedwater back into the pump causing the pump to be declared inoperab1 2.
Both valves were repaired and the system placed back in service.
l 2
1
'I 12: l'ot cc al l(cason:
i}
ggesin,,g$!
for l'ecp.uan!" '" !).na S: Schcif uteil A.lk oipinent Failuse (lixplain) g.htano on or i
. es jg gg,;nienance or.I.
t 2.hlanual Sciain-lint y Sheets toi luensec
(, Ifefueling J. Autoniatic St vani, l; yen, ;tep,y, g;,g:l() tile iNtil(I G-D-Itegulattn y l(esteiction
..gihe,(gigpt 'in) 0161) li Operaios Tiaining A 1.icense lixainination F Aihoinistaative,
3 G Opesafjonal Error (lisplain)
' " " ' ' '""#S'"""
(/771 11 Os hes (li spl.iin)
e CP&L Carolina Power & Light Company sm*o--ns H. B. ROBINSON STEAM ELECTRIC PLANT POST OFFICE BOX 790 HARTSVILLE, SOUTH CAROLINA 29550 AUG101983 Robinson File No':
15505 Serial: RSEP/83-1022 Mr. Richard C. DeYoung, Director Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 MONTHLY OPERATIONS REPORT
Dear Mr. DeYoung:
In accordance with Technical Specification 6.9.1.c for the H. B. Robinson Steam Electric Plant, Unit No. 2, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of July, 1983.
Very truly yours,
.,(j R. B. Starkey, J.
General Manager H. B. Robinson SE Plant AES/ta Enclosure cc:
R. A. Hartfield (2)
. O'Reilly (1) 7 "
l I
[h
_