Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076D920 + (ML20076D920)
- ML20076D929 + (ML20076D929)
- ML20076D934 + (ML20076D934)
- ML20076D943 + (ML20076D943)
- ML20076D944 + (ML20076D944)
- 05000368/LER-1983-020, Telecopy LER 83-020/01T-0:on 830519,fire Watch Posted in Wrong Location for Period Exceeding Tech Spec Limit.Further Details Will Be Provided + (ML20076D950)
- ML20076D953 + (ML20076D953)
- ML20076D963 + (ML20076D963)
- ML20076D967 + (ML20076D967)
- ML20076D968 + (ML20076D968)
- ML20076D975 + (ML20076D975)
- L-83-195, NPDES Noncompliance Notification:On 830413,routine Analysis Revealed Average Oil & Grease Concentration of 25 mg/1 & Pollutant Load of 27.9 Lb Per Day.Caused by Bearing Failure on Turbine.Bearing Repaired + (ML20076D983)
- ML20076D995 + (ML20076D995)
- RBG-15-083, Interim Deficiency Rept DR-112 Re Oversized Power Cable Lugs Supplied by Power Conversion Products.Initially Reported on 830419.Investigation Continuing.Interim or Final Status Rept Will Be Submitted by 830628 + (ML20076D997)
- ML20076E019 + (ML20076E019)
- ML20076E042 + (ML20076E042)
- ML20076E045 + (ML20076E045)
- ML20076E052 + (ML20076E052)
- 05000265/LER-1983-006-03, /03L-0:on 830424,AO 2-203-2D MSIV Failed to Initiate Half Scram on Reactor Protection Sys Channel B. Caused by Channel B 10% Closure Limit Switch Failure.Limit Switch Replaced w/like-for-like Switch + (ML20076E058)
- ML20076E061 + (ML20076E061)
- ML20076E064 + (ML20076E064)
- 05000346/LER-1983-016-03, Amplifier of Startup Level Transmitter LT-SP9A3 for Steam Generator 1-2 Failed. Caused by Component Failure within Amplifier.Amplifier Replaced + (ML20076E065)
- ML20076E068 + (ML20076E068)
- ML20076E069 + (ML20076E069)
- ML20076E074 + (ML20076E074)
- ML20076E075 + (ML20076E075)
- RBG-15-084, Interim Deficiency Rept DR-113 Re Misapplication of Matls Used for in-line Cable Splices on Electrical Connections for Hydrogen Igniter Assemblies.Initially Reported on 830419. Investigation Continuing.Next Rept by 830629 + (ML20076E077)
- ML20076E087 + (ML20076E087)
- ML20076E090 + (ML20076E090)
- ML20076E093 + (ML20076E093)
- ML20076E095 + (ML20076E095)
- ML20076E102 + (ML20076E102)
- ML20076E106 + (ML20076E106)
- ML20076E107 + (ML20076E107)
- ML20076E112 + (ML20076E112)
- ML20076E116 + (ML20076E116)
- ML20076E117 + (ML20076E117)
- ML20076E121 + (ML20076E121)
- RBG-15-085, Interim Deficiency Rept DR-114 Re Weld Defects in Radial Rebar Anchor Ring for Shield Bldg Roof.Initially Reported on 830419.Investigation Continuing.Interim or Final Status Rept Will Be Submitted by 830630 + (ML20076E131)
- ML20076E135 + (ML20076E135)
- ML20076E137 + (ML20076E137)
- ML20076E140 + (ML20076E140)
- ML20076E141 + (ML20076E141)
- ML20076E142 + (ML20076E142)
- ML20076E143 + (ML20076E143)
- ML20076E146 + (ML20076E146)
- ML20076E148 + (ML20076E148)
- ML20076E150 + (ML20076E150)
- ML20076E151 + (ML20076E151)
- ML20076E153 + (ML20076E153)
- ML20076E156 + (ML20076E156)