Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073K749 + (ML20073K749)
- ML20073K750 + (ML20073K750)
- HBL-20-004, 3 to the Defueled Safety Analysis Report; Revision 3 of the License Termination Plan; and Revisions 37, 38, and 39 to the Humboldt Bay Quality Assurance Plan + (ML20073K751)
- ML20073K757 + (ML20073K757)
- ML20073K761 + (ML20073K761)
- 05000277/LER-1991-008-01, :on 910407,Tech Spec Violation Due to Failure to Perform Reactor Coolant Temp Logging.Caused by Failure to Follow Procedures.Shift Teams Reviewed & Involved Shift Team Discussed Event in Detail + (ML20073K767)
- ML20073K769 + (ML20073K769)
- ML20073K771 + (ML20073K771)
- ML20073K772 + (ML20073K772)
- ML20073K773 + (ML20073K773)
- ML20073K774 + (ML20073K774)
- ML20073K778 + (ML20073K778)
- ML20073K782 + (ML20073K782)
- ML20073K783 + (ML20073K783)
- ML20073K791 + (ML20073K791)
- ML20073K792 + (ML20073K792)
- ML20073K796 + (ML20073K796)
- ML20073K802 + (ML20073K802)
- ST-HL-AE-4905, Endorses Comments Provided by Nuclear Energy Inst Re Pilot Program for NRC Recognition of Good Performance by Npps, 59FR45315,dtd 940901 + (ML20073K803)
- A830011, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP 5.7.7 Re Activation of Technical Support Ctr & EPIP 5.7.9 Re Activation of Emergency Operations Facility + (ML20073K828)
- ML20073K832 + (ML20073K832)
- ML20073K835 + (ML20073K835)
- ML20073K840 + (ML20073K840)
- ML20073K842 + (ML20073K842)
- ML20073K845 + (ML20073K845)
- ML20073K849 + (ML20073K849)
- ML20073K864 + (ML20073K864)
- ML20073K870 + (ML20073K870)
- ML20073K871 + (ML20073K871)
- ML20073K874 + (ML20073K874)
- ML20073K875 + (ML20073K875)
- ML20073K884 + (ML20073K884)
- BSEP-91-0191, Part 21 Rept Re Discrepancy Noted Between Torque Indicated by motor-actuator Characterization Sys & Output Torque Measured by Limitorque Actuator Test Stand.Initially Reported on 910426.Vendor Contacted Re Software Problem + (ML20073K886)
- ML20073K890 + (ML20073K890)
- BSEP-94-0408, Forwards Rev 47C to Plant Emergency Procedure (Pep) 0PEP-APPENDIX a, Emergency Response Resources + (ML20073K892)
- ML20073K893 + (ML20073K893)
- ML20073K894 + (ML20073K894)
- ML20073K898 + (ML20073K898)
- ML20073K899 + (ML20073K899)
- ML20073K901 + (ML20073K901)
- ML20073K909 + (ML20073K909)
- ML20073K911 + (ML20073K911)
- ML20073K912 + (ML20073K912)
- ML20073K915 + (ML20073K915)
- ML20073K918 + (ML20073K918)
- NRC-91-0047, Advises That Startup Test Rept Not Required for Planned June 1991 Startup for Cycle 3 W/Four Commercially Available Asea Brown Boveri SVEA-96 Lead Fuel Assemblies Loaded Into Core + (ML20073K920)
- ML20073K921 + (ML20073K921)
- ML20073K922 + (ML20073K922)
- B14978, Provides Addl Info to Support 940909 Request to Amend License NPF-49,by Modifying SR 4.7.1.5.1 Re Main Steam Line Isolation Closure Time.Retyped TS Page 3/4 7-9 Encl + (ML20073K926)
- ML20073K938 + (ML20073K938)
- ML20073K941 + (ML20073K941)