ML20073K772
| ML20073K772 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 01/28/1983 |
| From: | PACIFIC GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML16340D309 | List: |
| References | |
| PROC-830128, NUDOCS 8304200451 | |
| Download: ML20073K772 (174) | |
Text
{{#Wiki_filter:, ', ~ ~ a< n. =v.ci ne=i pg,g NUCLE R LANT OPER TIO ARTMENT CORPORATE EMERGENCY RESPONSE PLAN p p CONTROLLED DOCUMENT TRANSMITTAL SetEET Nuclear Emergency Response Communications Directory Approved: Change Number: 05 /[ pg Change Date: 01/17/83 Date: CHANGES)
- INSTRUCTIONS CHANGE
SUMMARY
Implerenting Procedure 1. Insert under Tab Replaces Implementing Procedur! " Table of Organization" " Implementing Procedures" Table of Contents (dated ' (dated 01/01/83) in CERP Manual 5/14/81) 2. Destroy superceded item imediately Replaces / reissues CERP Implementing Affected Appendix Appendices with Effective Procedure Appendix Date Dates as follows: 1.1 E-1 04/15/81 Insert CERP Implementing 04/15/81 E-2,3,4,5 01/01/83 Procedure Appendices 10/01/82 into CERP Manual and E-8,9 08/82 destroy superceded items 04/15/81 insnediately 3.1 E-2,3,4,5 01/01/83 10/01/82 E-7,,8 06/82 05/12/81 3.2 E-1 08/13/81 08/13/81 E-2,3 01/01/83 10/01/82 E-7,8 08/82 08/13/81 3.3 E-2,3 01/01/83 10/01/82 E-5,6 08/82 05/01/81 3.4 E-2,3 01/01/83 10~01/82 / E-5,6 08/82 05/01/81 ~ l 3.5 E-2,3 01/01/83 ~ 05/01/82 10/01/82 E-5,6 08/82 3.6 E-1 05/01/81 05/01/81 E-2,3 01/01/83 10/01/82 E-4 11/24/80 11/24/80 E-5 12/01/82 07/14/81 E-7,8 08/82 _ 05/01/81 3.7 E-1 05/01/81 05/01/81 E-2,3 01/01/83 10/01/82 E-4 05/01/81 05/01/81 E-6,7 08/82 05/01/81 4.1 E-2,3 01/01/83 10/01/82 E-5,6 08/82 05/01/81 X CONTINUED ON REVERSE SIDE Ater revising your controlled document in acmrdance with the above appropriate instructions place this sheet in the front of the affected document. Future cfianges will be numbered consecutively. If there are any questions please call: Stephen Foster 8304200451 830413 22-6522 PDR ADOCK 05000275 F PDR
ATTACIDfENT.2 e. ~ Location of Bracketed Privacy / Proprietary Information s Appendices with Procedure Bracketed Information 1.1 E-2, 3, 4, 5 3.1 ,E-2, 3, 4, 5 3.2 E-1, 2, 3 3.3 E-2, 3 3.4 E-2, 3 3.5 E-2, 3 3.6 E-2, 3, 5 3.7 E-2, 3 4.1 E-2, 3 4.2 E-2, 3 4.3 E-2, 3 4.4 E-2, 3' 4.5 E-2, 3 4.6 E-2, 3 4.7 E-2, 3 4.8 E-2, 3 4.9 E-2, 3 -,-n
.~ .y, .c REY 1 ~ 05/14/81 PACIFIC GAS AND ELECTRIC CdMPANY CORPORATE EMERGENCY. RESPONSE PLAN p IMPLEMENTING PROCEDURES Effective Date:01/01/83 TABLE OF ORGANIZATION Number Revision Date Title .1.1 01 04/15/81 Activation.of the Corporate Emergency Response Organization ~
- 1. 2 '
01 05/01/81 Activation of the Corporate Incident Response Center 2.1 01 05/12/81 Plan Maintenance 3.1 01 05/01/81 Governmental Relations 3.2 02 08/13/81 Public Relations 3.3 01 05/01/81 Law 3.4 01 05/01/81 Insurance 3.5 01 05/,01/81 Safety, Health and Claims 3.6 01 05/01/81 Security 3.7 00 05/01/81 Personnel Relations 4.1 01 05/01/81 Materials 4.2 01 05/01/81 Communications 4.3 02 08/08/81 Radiological Analysis and Protection 4.4 01 05/01/81 General Construction 4.5 01 05/01/81 Engineering and Technical Support 4.6 01 05/01/81 Computer Systems and Services, 4.7 01 05/01/81 Nuclear Plant Operations 4.8 01 05/01/81 Division Steport 4.9 01 05/01/81 Quality Assurance em e l 5'-t T rT1 --w =---a-- w N w* w c-- v--t-- ---A
c, m + ' ~ ./ REV 1 ~
- 05/14/81
~ PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN 1 ( IMPLEMENTING PROCEDURE APPENDICIES ~ ~~ Fffective Date? 01/01/83 APPEN01x MUMBER PROCEDURE NUMBER 1 2 3 4 5 6 7-8 9 1.1 04/15/31 01/01/83 01/01/83 01/01/83 01/01/C3 04/15/81 10/01/82 08/82 08/82 1.2 05/0'1/81 07/14/81 05/01/81 05/01/81 I I I x x 2.1 05/1'2/81 10/82 10/82_ x x x x x x 3.1 05/12/81 01/01/83 01/01/83 01/01/83 01/01/83 05/01/82 08/82 08/82 x 3.2 08/13/81 01/01/83 01/01/83 08/13/81 08/13/81 08/13/81 08/82 08/82 1 3.3 05/01/81 01/01/83 01/01/03 05/01/81 08/82 08/82 x x x 3.4 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/81 x x x 3.5 05/01/81 01/01/83 01/01/83 05/01/81 08/81 08/81 x-I x 3.6 05/01/81 01/01/83 01/01/83 11/24/80 12/01/82 05/01/81 08/82 08/82 x 3.7 05/01/81 01/01/83 01/01/83 05/01/81 05/01/81 08/82 08/82 x I 4.1 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 I I x 4.2 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 1 x x 4.3 08/08/81 01/01/83 01/01/83 08/08/82 08/02 08/82 08/08/81 I x 4.4 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x x x 4.5 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x x x 4.6 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x x x 4.7 05/01/81 01/01/83 05/01/81 08/82 08/82 x x x x 4.8 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 X X X 4.9 05/01/81 01/01/83 01/01/83 05/01/81 08/82 08/82 x x I e e 6 e L.-
.-e g PACIFIC GAS.AND ELECTRIC COMPARY ' Rev. 1 CORPO, RATE EMERGENCY RESPONSE PLAN 4/16/81 IMPLEMENTING PROCEDURE 1 PROCEDURE 1.1 ACTIVATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-1 EMERGENCY N ANIZATION, i CORPORATE EMERGENCY RESPONSE OHGANIZATION MANAGEMENT I ~ Cn
- m. tort r
c .a i l co,,,,,. ..c,. on. - =" r. ..e--..- ..,...,,a f.r ..I. .. - ic., I I I I I I ,.X &.,H.G.E .W4..esE.. LI.t. 1 .,t. W RAE I.. ICS .W'#,t. 4 E.n. . eth.u.G. CWWI ,4. Ctll..W g l ( 1 I I l l I I r _ m, ,,,,, _ = .--i c.-., ,,,,.,e., ..c c .c c-- wy e,., _ --.i.. .ici ,e.r i. I I I I I I 1.l.ll"l". '." c.""'. r,c= 1 ~
= =
==
- u.,-
- in .a. .o uA o,,,,,,, e ,c., c-=, ...<rieri --.1 n, .c ..,,,n, e e. u-u, On.e44 .s me - % es-.u-.,= suer coac-m -a 4 Page 19 of 40 --,wv.--e y n-tw ,"g----m--- w-r----------m&wm-r=----T-we--y-es -w*-- -ww---- --r-g-*y
yw-w'+
www--- ne e-e e-w - ~ ' ' -
1 Rev. 1 .l 04/15/81 -PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 REC 0VERY MANAGER NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Recovery Manager 1. J. D. Shiffer \\. Manager, Nuclear ) Plant Operations 2. R. C. Thornberry DCPP Plant Manager 3. J. D. T'ownsend Supervising Nuclear Generation Enijineer Corporate Emergency 1. J. O. Schuyler Coordinator VP - Nuclear Power Generation 2. G. A. Mar :stis Exec. VP - F,acilities. and Electric Resources. Development 3. E. B. Langley, Jr. Sr. VP - Operations Corporate Technical 1. J. B. Hoch and Logistical Project Manager, ~ Coordinator Diablo Canyon 2. M. R. Tresler Supervising Project Control Engineer 3. R. A. Young Project Design Coordinator
- Confidential number. Establish contact through Cmmunications PBX Operator at t Page 20 of 40
Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ( PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 (Continued) RECOVERY MANAGER lhTTIFICATION LIST Effective Date:- 0.1/01/83 Home Phone Name Emergency Plan Title Nonemergency Title Business Phone Corporate Liaison 1. R. J. McDevitt Coordinator Senior Nuclear Power Generation Engineer 2. S. R. Foster Health Physicist 3. T. A. Moulia Technical Assistant Vice President NPG 4. G. A. Pierce l Nuclear Budget ~ Engineer t Public Information l'. D. J. Baxter Recovery Manager Manager of Public Information Z. C. H. Peterson Senior Public Infor-mation Representative 3. S. N. Coffey Public Information ~ Representative Radiological 1. W. H. Fujimoto Emergency Recovery Supervising Nuclear Manager Engineer 2. Unassigned 's Page 21 of 40
n 3 Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN I IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-2 (Continued) REC 0VERY MANAGER NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Titl_e Nonemergency Title Business Phone Radiologica.1 Emergency 3. D. P. Serpa } Recovery Manager Senior Nuclear (continued) Generation Engineer 4. S. M. Skidmore Assistant Project Manager Engineering and 1. B. W. Giffin Logistics Senior Nuclear Recovery Manager Generation Engineer 2. A. L. Simmons Nuclear Generation Engineer' l 3. G. C. Russell Nuclear Generation Engineer Operations and 1. J. D. Townsend l Analytical Supervising Nuclear l Recovery Manager Generation Engineer 2. W. T. Rapp Senior Nuclear Generation Engineer 3. B. W. Giffin Senior Nuclear Generation Engineer Electric System 1. A. D. _ Lyon Dispatcher (, ,] Shift Supervisor 2. On-duty Shif t Suoervisar Page 22 of 40
6 m \\ Rev. 1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (MPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83
- 1ame Errergency Location Emergency Plan Title itormal Business Phone Emergency Phone
~ Communications 1. On-duty Operator General Office PBX Operator 2. R. Larsen L-370. Corona L ~ Site Emergency 1 7,R. C. Thornberry TSC Coordinator
- 2.,.R. Patterson L
- 3.,J. M. Giscion
- 4. pW. B. Kaefer L
Shift Foreman
- 1. r~0. A. Col e Control Room (Interim Site
~ '^ ^ ^ / or g Emergency Coordinator
- 2. yW. J. Dilbeck L
- 3. pW. F. White ] L
- 4. r_0. E. Sundquist L
i i 1 l Page 23 of 40
Rev. 1 04/.15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 7 PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-3 (Continued) ~ Effective Date: 01/01/83 ~ Name Energency Location Emergency Plan Title Nonnal Business Phone Emergency FHone Shift Foreman
- 5. _R. L. Ewing -
(Interim Site ) m Emergency Coordinator 6. D. C. Bashaw (continued) 7 ] 7 4 Collins u J '8.. T Ken singer 3 9 4 A. Rhodes m Corporate Technical 1.,_J. B. Hoch _ CIRC and Logistical J or g. Coo rdinator
- 2. _M. R. Tresler
~ t. J
- 4.,R. A. Young J
Corporate Liaison 1 4 J. McDevitt CIRC _3 Coordinator .y or 2. S. R. Foster W 6 J _ 3. T. A. Moulia J
- 4. g. A. Pierce J
\\ Page 24 of 40 4-
,n,. Rev.1 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAh IMPLEMENTING PROCED'URE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 CORPORATE TECHNICAL AND LOGIST.! CAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone, Corporate Engineering 1. G. H. Moore ( Coordinator DC, Project Engineer 2. J. V. Rocca Chief Mechanical & Nuclear Engineer ' 3.- R. V. Bettinger Chief Civil Engineer 4. J. R. Herrera Chief Electrical Engineer 5. G. H. Aster
- Chief, I
Design-Dra f ting I I Corporate 1. R. S. Bain i Construction Manager, Station Coordinator Construction 2. J. R. Manning ~ ~ Superintendent Station Construction 3. B. T. Saenz ~ Station Construction Admin. Superintendent /' Page 25 of 40 a
a. s s.., 4' Rev. 1 ~ 04/15/81 PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE < s. R10CEDURE 1.1', ACTIVIATION OF THE_ CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued) CORPORATE TECHNICAL _ AND LOGISTICAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Division 1. D. L. Kennady Coordinator Los Padres District. Manager 2. B. McCloskey Los Padres District Marketing Manager 3. R. J. McKell Los Padres District Electric Superintendent 4. Alternate Number Morro Bay Switching Center Corporate Materials 1. E. J. Meyers I Coordinator Director, Project Purchasing 2. D. R'. Shaffer I Director, Materials Purchasing 3. .J. E, f.eanhan Sur cv' (ng Buyer 4. L. J. .Jdick bdpEri..; < ng Buyer 5. R. R. Ochsner Supervising Buyer 6. R. E. Gleason Supervising Buyer Page 26 of 40
o Rev. 1-04/15/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued) CORPORATE TECHNICAL AND LOGISTICAL COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Computer 1. A. W. Simila Applications Manager, Engineering Coordinator Computer Applications 2. R. M. Wetherell l S.upervising Mathema - tician-Programmer ' 3.- B. M. Speckman ~ Supervising Computer' Applications Engineer Corporate 1. T. R. Ferry Communications Mngr Canmunications Department 2. A. J. Nevolo Seoior Communications Engineer 3. C. D. Gilson Supervising Communi-I cations Engineer og Page 27 of 40
~ -v Re.v. 1 04/15/81 PACIFIC, GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN I IMPLEMENTING' PROCEDURE * ~ PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-4 (Continued _) CORPORATE TECHNICAL AND LOGISTICAL COORDINATOR - NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Quality 1. W. A. Raymond [ Assurance Coordinator Manager Quality Assurance 2. P. C. Burgess l Records Management j System Supervisor l 3. T. G. de Uriarte Senio.r Quality I Engineer t \\ e i Page 28 of 40
Rev. 1 o 04/15/81 ., PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGEhCY RESPONSE PLAN IMPLEMEllTING PRO,CEDURE PROCEDURE 1.1 ACTIVIATION OF THE CORFORATE Et ERGENCY ORGANIZATION APPEtiDIX E-5 CORPORATE LIAISON C00PDINATOR fiOTIFICATION LIST Effective Date: 01/,01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Public 1. R. H. Miller Information Mngr, Advertising Dept. Coo rdinator 2. C. G. Poncelet Mngr., Comn. Planning 3. H. N. Peelor Mngr., Pubite Activities Corporate 1. G. A. Blanc ~ Governmental Hngr, Agency Relations Relations Coordinator 2. R. F. Nichols i tingr, Local Gov' t Rel. [ ~ 3. J. R. Torrens Sr Representative Corporate Law 1. P. A. Crane, Jr. Oepartment Asst General Counsel Coo rdinator 2. R. Ohlbach VP and I General Attorrey 3. R. F. Locke i ~ Sr Counsel Confidential number. Establish contact through Canmunications PBX Operator at (415)781-2893. Page 29 of 40
Rev. l' 04/15/81 e PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE FLAN IMPLEMENTIhG PROCEDURE PROCEDURE 1.1-ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-5-(Continued) CORPORATE LIAISON 'C00RDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corpcrate Insurance 1. W. P. Noone Cecrdinator Mngr of Insurance 2. R. M. Reider Director, Insurance Administration 3. C. A Lewis Coora. of Property loss Cntrl. Corporate Safety, 1. B. P. Sadler health, and Claims Mngr, Safety, Coordinator Health and Claims 2. A. L. Bechtold Sr. Attorney 3. C. W. All en Attorney 4. J. C. Vocke Attorney Page 30 of 40
~ Rev. 1 04/15/81 PACIFIC MS ~AND ELECTRIC C0ttPANY CORPORATE EMERGENCY RESPONSE PLAN ~ IMPLEMENTING PROCEDURE N PROCEDURE 1.1 ACTIVIATION OF THE CORPORATE EMERGENCY ORGANIZATION APPENDIX E-5 (Continued) CORPORATE LIAIS0N COORDINATOR NOTIFICATION LIST Effective Date: 01/01/83 Home Phone Emergen y Plan Title. Name Nonemergency Title Business Phone Corporate 1. L. H. Shaffer Security Director, Security Coordinator 2. J.-R. Van Schaick Supervising Security Representative 3. R. Dunleavy i Senior Security Representative Corporate Personnel 1. H. S. Pitner Relations Director, Enployment Coordinator and Planning 2. T. J. Walsh, Jr. 1 Employment Represen-ta ~l1ve ~ ~ 3. Unassigned 1 l Page 31 of 40
PACIFIC GAS AN;,) ELECT. lC COMPANY EMER tENCY LOCATION yo g CORPORATE EMERGENCY RESPONSE PLAN TODAY'S DATE ' AGE EMERGENCY COMMUNICATIONS LOG SHEET tu (2) (a TIME NAME ACTIVITV 12400 hrs.) 180 ENTERED 2 (7) gg EMERGENCY TITLE OR AFFILIATION tesTIALSI W i c 89484 (8/82) Rev. 00 SEE INSTRUCT 10fS O d REVERSE
-..o PACIFIC GAS ANO ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN po.3 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S OATE PAGE 7;x 10 (2) la TIME \\ ENTERED BY (2400 hr J (INITIALS) u; (s)
SUMMARY
OF ACTIVITY PERFORMED toi i ~ O ~ l l ~ \\ 81M85 (8/82) Rev. 00 SEE INETRUCT IONE ON REVarsal,
u Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate 1. G. A. Blanc i Governmental Mngr., Agency Relations ( Relations Coordinator 1 2. R. F.Nichols Mngr., Local Gov't ret. 3. J. R. Torrens Sr. Representative Governmental Relations Representatives ~ -Coast Valleys 1.' C. L. Richmond Division Special Representative 2. R. L. Royster Mngr. Santa Maria 3. B. J. Hoppert Mngr., Paso Robles { t ~ -Sacramento 1. R. D. Testa Drc tr., S ta te Agency Relations 2. J. H. Fraser Mngr., State Leg. Rel. ( _ l Page 9 of 22
m l Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN i IMPLEMENTING PROCEDURL PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-2 (Continued) Effective Datei 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Governmental Relations Representatives (continued) -Washington, D.C. 1. J. H. Bergler Representative-Agency Relations 2. J. A. Vance Washington, D.C., Counsel Page 10 of 22 O
Rev. 1 05/01/81 l PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERSENCY RESPONSE PLAN t
- IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-3 EMERGENCY -ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emeroency Plan Title Normal Business Phone Emergency Phone
,s F Recovery Manager 1 4 0. Shiffer { L-L. 2.,,. R C. Thornberry J
- 3. g
._D. Townsend . J! +. Corporate Liaison
- 1.,R. J. McDevitt
, CIRC Coordinator . ')
- 2.,S. R. Foster
' ] L
- 3.,T. A. Moulia
~ L
- 4. _G. A. Pierce Corporate Techn.ical 1.g.B.Hoch CIRC and Logistical p'
or Coordinator
- 2.. M D. Tresler L-I
- 3. r_R. A. Young Page 11 of 22
Rev. 1 05/01/81, PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s ( IMPLEMENTING PROCEDURE N P PROCEDURE 3.1 GOVERNMENTAL RELATIONS. APPENDIX E-3 ENERGENCY ORGANIZATION CONTACT LIS( Effective Date: 01/01/83 Name. Energency Location Emergency Plan Title Normal Business Phone Emergency Phone Corporate Ptblic
- 1. yR. H. Miller
_J l General Office Information v Coordinator 1. 2. C. G. Poncelet
- 3. _H. N. Peelor
) u ~ Public Information
- 1. _D. J. Baxter E0F Recovery Manager g
- 2.,C_. H. Peterson 6
- 3.,S. N. Coffey w
Page 12 of 22
- - ~ Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS ~ APPENDIX E-4 GOVERNMENTAL BRIEFING CENTERS Effective Date: 01/01/83 Locations Phone Numbers g_ Washington, D.C. Office - Suite 1180 1r 1050 - 17th Street NW Washington, D.C. 20036 i ) ~ Sacramento Office - Park Executive Building Suite 890, 925 L Street Sacramento, California 95814 Officials) Conference Room, San Luis Obispo Office, Coast Valleys Division - District (Government and Public ~ ~ Page 13 of 22
S-Rev. 1 05/01/81 ~ ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN . I IMPLEMENTING PROCEDURE s PROCEDURE 3.1 GOVERNhENTAL RELATIONS APPENDIX E-5 GOVERNMENTAL 0FFICIALS AND AGENCIES Effective Date: 01'/01/83
Response
PGandE Nane of Governmental Governmental Relations Official Representative or Agency' Add ress Phone 1. San Luis Obispo Courthouse Annex Coast Val'ieys Board of San Luis Obispo. Division Supervisors 93401 2. City of 990 Palm Street San Luis Obispo San Luis Obispo 93401 3. City of 214 E Branch St. ~ Arroyo Grande Arroyo Grande 93420 4. City of 6500 Palma Ave. Atascadero Atascadero 93422 5. City of 595 Harbor St. Morro Bay Morro Bay 93442 6. City of 1030 Spring _St. Paso Robles Paso Robles 93446 7. City of 1000 Bello St. Pismo Beach Pismo Beach 93449 8. City of 154 S. 8th St. Grover City Grover City 93433 Page 14 of 22
u Rev. 1 ~. 05/01/81 PACIFIC GAS'AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (G IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-5 (Continued) Effective Date: 01/01/83
Response
PGandE Nane of Governmental . Governmental ^ Relations Official Representative or Agency Add ress Phone Coast Valleys 9. City of 110 East Cook Division Santa Maria Santa Maria-(continued) 93454 o 10. Santa Barbara-Courthouse Board of Santa Barbara Supervisors 931ct 11. City of 918 Obispo Guadalupe Guadalupe 93434 1 Sacramento 1. R. D. Testa Park Executive Bldg., Sui te 890 925 L Street Sacramento, CA 95814 2. J. H. Fraser Park Executive Bldg., Suite 890 925 L Street Sacramento, IA 95814 Washington, D.C.' 1. J. H. Bergler Washington, D.C. 05b h St NW- [))~ ~ Washington, D.C. 20036 Page 15 of 22
~ v ~.. ? e PACIFIC GAS AND ELECTRIC COMPANY s CORPORATE EMERGENCY' RESPONSE PLAN ~ IMPLEMENTING PROCEDURE PROCEDURE 3.1 GOVERNMENTAL RELATIONS APPENDIX E-5 (Continued) ~ Effecti' e Date: 01/01/83 v
Response
PGandE Nane of Governmental Governmental Relations Official Representative or Agency Add ress Phone Washington, D.C. 2. J. A. Vance Washington, D.C. / (continued) Off. Sui te 1180 / ~ 1050 17th St. NW [ Washington, D.C.- 20036 t i i ~ \\ Page 16 of 22
~ ~ h PACIFIC GAS ANO ELECTRIC COaWANY EMERGENCY LOCATION TODAY'SDATE ' AGE pg g CORPORATE EAGERGENCY RESPONSE PLAN EMERGENCY COMMUNICATIONS LOG SHEET to to ' (8 7.se NAmE Acr.viTY (2400Imej M lNmunm (7) N g Ea4ERGENCY TITLE OR AFFILIATION 1 s f, t t 2 6 18 22) R n M SE119ETRUCTIO95 O d REVERSE
i EMERGENCY COMMUNICATIONS t.OG SHEET INSTRUCTIONS Entry Number Instructions 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this Form is being used. Start a new Log Sheet each day. c 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 2400 hobr clock to avoid confusion. i S. Clearly record the nameof the individual calling you or whom you are. calling. 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. 7. Che k the entry activity as to whether the individual called you or you are calling them. c 8. Enter the entire context of the message being communicated. Read back ti)e message to the individual to assure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. l l l l
s- ~ [ PACsFN ANO ELawirilC COMPANY GGewvEATE """5"'Y RESPOfSE PLAN 90e3 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TODAY'S OATE PAGE \\ e (1) (2) (3 TIME ENTERED BY (2400 hrs.) (INITIALS) tai am
SUMMARY
OF ACTIVITY PERFORMED is t s -e e ~ i B N E A" N SEE INSTRUCTIONS ON REVERSE
<m EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET, INSTRUCTIONS Entry Number Instructions 1. Identify the emergency location where this Log Shee* is maintained s during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. / 3. Consecutively number each page used each day. 4. Enter the time foreach Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon comple'..;on of each Log Sheet entry. - 6 8
== .w. o = r w ~ PACIFIC GAS AND ELECTRIC COMPANY Rev. 2 CORPORATE EMERGENCY RESPONSE PLAN 8-13-81 IMPLEMENTING PROCEDURE, 7 ~ PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION PUBLIC RELATIONS DEPARTMENT RELATIONSHIPS .-~, I i 1.._.._..._: g e e ..e
- ,-,j,,,, ;i,,,, l-
- llll
- =,,;.
'g,h. -= ,,,,,,,,,m .u,,:;,;,, .a - l ll ~ ,9 ... _. i.l, ..l -l l: l 1 l , ic i _ l lm-. l l - m.i i m., l ..... ~. - i l.. _.. l i i- - -ia i _... _1 .__i l g l 1 1 . lllll"".:., l ,,,,,,;=,,,,, u j - = = > u,=='=.,.= e i u -..--e,.,...u . -i
==ry- ,,,, ;;;-- j =e. w. =,. u iu, Pa g e 16A o f 30
e_ Rev. 2' 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 ~ PUBLIC RELATIONS APPENDIX E-2 EMERGENCY PLAN TITET! AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/03 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone ~ Corporate Pubite 1. R. H. Miller Information Mngr., Advertising Dept. Coordinator 2. C. G. Poncelet Mngr., Commn. Planning 3. H. N. Peelor Mngr., Public Activities .4edia Center 1. R. P. Davin Representative Sr. Public-Info. Rep. 2. G. C. Sarkisian Prjct. Information Spec. 3. P. M. Zweif'el , Mngr. Community Activities Task Force News Director 1. D. R. Hanes News Director i 2. J. M. Kilbatrick Drctr., Elec. Media 3. R. R. Rutkowski Sr. Public Info.- Rep. L 3 -l Page 17 of 30
v- ~ 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency _ Plan Title Nonemergency Title Business Phone u Interim Public 1. S. G. Brown Infonnation Recovery Sr. Public Info. Rep. Manager 2. G. C. Sarkistan Prjt. Infonnation Spec. 3. P. M. Zweifel ~ Manger, Community Activities Task Force Public Infonnation 1. D. J. Baxter Recovery Manager Mngr., Pub. Infonnation 2. C. H. Peterson Sr. Pub. Info. Rep. 3. S. N. Coffey Public Info. Rep. a Page 18 of 30
~- Rev. 2 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN-i IMPLEMENTING PROCEDURE ' ~ PROCEDURE 3.2 e PUBLIC RELATIONS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date:- 01/01/83 'Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager
- 1.,J. D. Shiffer I'
~ or ?- 2.,.R. C. Thornberry q L .1 37 h D. Tnwnsend L Corporate Liaison I.,.R. J. McDevitt , CIRC Coordinator -] g 2.,,S. R. Fost_er ) L 3.r T. A. Moulia ) L 4.r. A. Pierce G L-Corporate Technical 1.r J. R. Hnch CIRC and Logistical. ] Coordinator b 2.f M. R. Tresler L _L 3.r. A. Young R t. J ~ Public Infomation 1.r. J. Baxter ,E0F D Recovery Manager. }
- 2., C. H. Peterson L
Page 19 of 30
m Rev. 2 08/13/81 PACIFIC GAS AND ELECTRIC COMPANY, CORPORATE EMERGENCT RESPONSE PLAN IMPLEMENTING PROCE. DURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued)
- Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone a
i Public Infonnation
- 3. _S. N. Coff5y
_J Recovery Manager (co,ntinued) Corporate Governmental 1. G. A. Blanc General Office Relations Coordinator [ ] {
- 2. _R. F. Nichols L.
J
- 3. _J. R. Torrens
) g ~ Radiological 1 7. H. Fujimoto EOF W Emergency Recovery ( L Manager 2. UNASSIGNED ~ 3 4 P. Serpa_ L J '~ Corporate Law 1. P. A. Crane, Jr. General Office Department ] ~ Coo rdinator 2. R. Ohlbach ) L 3.'_R. F. Locke ] Corporate 1. T. R. Ferry General Office ~ Communications l Coordinator L~ ~
- 2.,A. J. Nevolo g
) l 3. C. D. Gilson 1 6 Page 20 of 30
Rev. 2 -08/13/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE. PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued)' Effective Date: 01/01/83 Name Emergency Location . Emergency Plan Title Normal Business Phone Emergency Phone County Public
- 1.,Duane Lieb EOC Information
[s -{. s Officer
- 2.,- D. L. Ri chter L.
3. Stava Keil 3 L-Technical Advisor f. W'. J. Keyworth EOF to the Public L I nformati og.. = Recovery 2. T. E. Brake ] Manager { Advisor to the ' 1. g. B. Kae fer 'Eg County Emergency ] g. Organization
- 2.,W. J. Keyworth
~ 3. T. E. Brake p c 4.[W.B. Scott ~ -L Media Center 1. R. P. Davin Media Briefing Center Representative { ~
- 2.. G. C. Sarkisian L
3. P_. M. Zweifel L Page El of 30
Rev. 2 08/13/81 PACIFIC, GAS AND ELECTRIC COMPANY . CORPORATE EMERGENCY RESPONSE PLAN , ~. IMPLDIENTING PROCEDURE s PROCEDURE 3.2 PUBLIC RELATIONS APPENDIX E-3 (Continued) Effective Da'te: 01/01/83 ~ Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone 1. R. H. Miller IGeneral Office Corporate Ptblic Information {' 1 s Coo rdinator ~ 2. C. G. Poncelet [' 3
- 3.,H. N. Peelor L
7 Corporate 1. D. L. - Kennady Los Padres District Off. Division [~ -] Coordinator 2. B. McCloskey [ [" ,) 3., R. J. McKell L 3 s 4. Alternate Number Morro Bay Switching Cntr. Morro Bay Switching Center t Onsite Attorney 1. O F. Locke EOF (ifassigned) { } ~
- 2.,D. G. Lubbock
~ 1 3._ D. A. Oglesby L Technical' Advisor 1. B. E. Thinger SF Media' Center ~ to the News Director } { }
- 2.p & W. Medcalf
~ 3. UNASSIGNED Page 22 of 30
+ b e PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION TODAY'S DATE ' AGE, pg.g CORFOHATE EMERGENCY RESPONSE Pl.AN 3 EMERGENCY COMMUNICATIONS LOG SHEET / e f s tu TIME NAME m. (# ACTIVITY * (2400 hrs.) ist + NE (7) ,s /, 43 EMERGENCY TITLE OR AFFILIATION N (ep CALLED CALUNG MESSAGE te e f , l s i g i f w t i 4 e t e l l i, I l s s f t 6948418182) Rev. 00 SEE INETRUCTIONE O d REVERSE
EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS ~ Entry Number Instructions ~ 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 240d hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization T"itle or their non PGandE affiliation. 7. Che k the entry activity as to whether the individual called you or you are calling them. c e 8. Enter the entire context of the message being communicated. ' Read back the message to the - individual to assure correct copy / transmission. Enter your initials h completion of each Log Sheet entry. 9. 4 C ( ,8 .) ..s c ^
v- ,o .r, PACIFICTAS AND ELECTR6C COMPANY CORPORATE EMERGENCY RESPONSE PLAN, EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S OATE PAGE (~ (1) (2) (I TIME ENTERED BY (2400 hrs.) (INITIALS) u) (s)
SUMMARY
OF ACTIVITY PERFORMED (a l 1 1 I I l l 8946 (8/s2) Rev. 00 SF.E INSTRUCTlONS ON REVERSI. i
v ~- ~ d. r s EMERGENCY RESPONSE AND RECOVERY ACTIVITIES t.00 SNEET - INSTRUCTIONS Entry
- Number instructions 1.
Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day.- 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon complation of each Log Sheet entry. ~ ~ 1 e w' m
q Rev. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN 3 IMPLEMENTING PROCEDURE O PR0bEDURE 3.3 LAW APPENDIX E-2. EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS IOTIFICATION LIST Effective Date: 01/01/83 Name Home Pho'ne Emergency Plan Title Nonemergency Title Business Phone Corporate Law 1. P. A. C ra nc, J r. ( Depar.tment Assistant General Coordinator Counsel 2. R. Ohlbach Vice President and General Attorney 3. R. F. Locke Senior Counsel Onsite Attorney 1. R. F. Locke (if assigned) Senior Counsel E. D. G. Lubbock Senior Counsel 3. D. A. Oglesby Senior Counsel Law Department 1. R. J. Peters Staff Members Attorney ~ 2. J. A. Shaffer Attorney
- Confidential number.
Establish contact through Communications P8X Operator at (415)781-2893. Page 9 of 18
u Rey, f 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORF0PATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.3 LAW PP5N0!X E-2 (Continued) EffectiveDIte: 01/01/83 Name Home Phone . Emergency Plan Title Nonemergency Title Business Phone Law Departaent 3.. UNASSGINED Staff Members 4. UNASSIGNED 5. UNASSIGNED 6. UNASSIGNED 5 California Public 1. J. E: Bryson. i Utilities Canmission President, CPUC 2. J. E. Bodovitz Executive Director, CPUC j 3. J. E. Kerr General Counsel, CPUC = Page 10 of 18
u m e ..Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN - IMPLEMENTI.NG PROCEDURE Pf'CCEDURE 3.3 LAW APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1.r _. D. shiffer 3 J EOF 2. R. C. Thornberry J u
- 3.,J. D. Townsend
') o Corporate Liaison
- 1.,R. J. McDevitt CIRC
'] Coordinator g .o 2. S. R. Foster c. . _3 L
- 3.,,T. A. Moulia
. ]
- 4.. G. A. Pierce
] Corporate Ptblic 1. R. H. Miller General Office Information ] '. G. Poncelet Coo rdinator ~ 2. C ) ~ ~ ~3. H. N. Peelor a Corporate Safety, 1. 'B. P. Sadler General Office Health and Claims ] Coo rdinator [ 2. A. L. Bechtold [~ 3 Page 11 of 18
~,, .u Rev. 1 PACIFLC GAS AND ELECTRIC COMPANY CORPORATE EMERGENtY RESP.GdSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.3 LAW APPENDIX E-3 (Continued). Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone ~ Corporate Safety, 3. C. W. Allen Health and Claims 3 g Coo rdinator (continued) Corporate Insurance 1. W. P. Noone fGeneral Office ~ Cecrdinator [' 3 L
- 2. sR. M. Reider 3
u 3. C. A. Lewis e-b Public Information-1. D. J. Baxter E0F Recovery Manager ] .i ~ ' ' ~ 2. C. H. Peterson J
- 3.,S. N. Coffey
] L Page 12 of 18 1
s PACIFIC GAS AND ELECT IC COMPANY EMERGENCY LOCATION pg.g COMPOAATE EMERGENCY RESPONSE PLAN TOOAY'S DATE ' AGE EMERGENCY COMMUNICATIONS LOG SHEET TIME NAME ta is (u Acnv3yy (2400IwsJ 181 e-WWTEREDm 17) EMERGENCY TITLE OR AFFILIATION N IU tes cAtteo CALuMG MESSAGE tot t. i i e i. e 4 1 i som taisa n.oo sEE esesTauCTiOsss O e mEvansE
< -; J ' I l l s's E_MERGENCY COMMUNICATIONS LOG SHEET _ INSTRUCTIONS Entry instructions _ Number Identify the emergency location where this LogSheet is maintained during an emergency Facility, etc.) (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations 1. ,{ li. Enter the date which this Form is being used. Start a new Log Sheet eai:h day. n-2. Consecutively number each page used each day.- 3. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion., 4. Clearly record the name of the individual calling you or whom you are calling. 5. E affiliation. J Record the individuals PGandE Emergency Organization Title or their non PGand 6. i h ck the entry activity as to whether the' individual called you or you are call ng t em. 7. Che e 5 Enter the entire context of the message being communicated. Read back th 6 4 individual to assure correct copy / transmission. 8. Enter your initials upon completion of each Log Sheet entry. 9. i. i n i b l-
a e, 4 + PIEIFICTAE AND'ELEf7RIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN POwB i
- EMER'GENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY 1.OCATION TODAY'S DATE PAGE (1) e (2)
(3) TIME ENTERED BY 12400 tws.) (INITIALS) ui (s)
SUMMARY
OF ACTIVITY PERFORMED ~ ' tai s i l 4 { 81NM5 48/82) R w.00 ggt IISTRUCTIONE ON REVER51; w, ---r
o ~ n r\\ W EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ~ INSTRUCTIONS Entry Number Instructions ~ 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start anew Log Sheet each day. 3. Consecutively number each page used each day. r 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. i
m c .1 Rev. I 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE , PRDCEDURE 3.4 s INSURANCE APPENDIX E-2 EMERGENCY PLAN TITLES AND PfKSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonocergency Title Business Phone Corporate Insurance 1. W. P. Noone Coordinator Manager of Insurance 2. R. M. Reider Director, Insurance Administration 3. C. A. Lewis Coorainator of Prop-erty Loss. Con trol Coordinator of Property 1. C. h. Lewis Loss Control Coordinator of Prop-erty Loss Control 2. UNASSIGNED 3. B. J.'Casey Assistant Insurance Ana lyst ' Coordinator of 1. R. M. Reider Insurance Director, Insurance - Administration Administration 2. B. J. Casey Assistant Insurance Analyst 3. C. A. Lewis Coordinator of Property loss Control Page 10 of 19
~ Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORP. ORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCECURE 3.4 INSURANCE AP'PENDIX E-2 (Ccntinued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone NHL/ Marsh and McLennan 1. Quentin Jackson General Mgr. Nuclear Mutual Limited 2. D. F. Brown 1 Fire / Extended Coverage ( Loss Control Supervisor 3. J. Mra s Loss Adjustment Supervisor m Page 11 of 19
. Rev. 1 - - 05/01/81 PACIFIC GAS ANU ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEllENTING PROCEDURE PROCEDURE,3.4 s IllSURANCE APPENDIX E-3 EMERGEllCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Energency Location ' - Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager
- 1. pJ. D. Shiffer fEOF L-3 L
J 2. R C. Thornberry J g 3. J. n Town <gnd e n Corporate Liaison 1. R. J. McDevitt . CIRC Coordinator { 3 L
- 2., S. R. Foster
- ]
- 3.,T. A. Moulia 3
m 4. G. A. Pierce p ~) 6 Corporate Public 1. R. H. Miller General Office Information ] g Coo rdinator 2. C. G. Poncelet C- ]
- 3.,,H. N. Peelor
) Corporate Safety,
- 1.,8. P. Sadler General Office Health and Claims
} Coordinator A. L. Bechtold 2. r i 3. C. W. Allen e 6 Pagy 1. cf '.f
m F.cv. 1 05/01/81-PACIFIC GAS AND ELECTRIC. COMPANY - CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE , PROCEDURE 3.4 INSURANCE APPENDIX E-3 (Continued) Effective Date: 01/01/83 Name Emergency location Emergency Plan Title Normal Business Phone Emergency Phone Corporate Law
- 1. _P. A. C ra ne, J r.
heneral Office _ ~ Department ] Coordinator b 2. R. Ohlbach L l 3. R. F. Locke _J Department { fGeneralOffice Accounting 1. .. D. Lee ] ~ 2. UNASSIGNED 3. UNASSIGNED Page 13 of 19
6 Y "~ \\ 1) PACIFIC GAS ANO ELECTRIC COMPANY EMERGENCY LOCATION pg,3 CORPORATE EMERGENCY RESPONSE PLAN TOOAY1 DATE ' AGE EMERGENCY COMMUNICATIONS LOG SHEET pl (a tm TIME NAME ACTIVITY (2400 hrs.) (El WHEBED m 17) egnaam gg EMERGENCY TITLE OR AFFILIATION i e 3 e I = e e e t 8 i 4 69084 (8/87) Rev. 00 SEE INSTRUCTIO88 O e IlEVERSE S e
t ( pm mmw nummmmmaeeenaan t.no aHEaT INateMpt276DNS Entry Number Instructions 1 Identify the emergency k) cation where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center Materials Dept., Emergency Operations Facility, etc.) i s-2. Enter the date which this Form is being uJed. Start a new Log Sheet each day. 3. Consecutively number each page used each day. ~ 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. t ~ 5. Clearly record the name of the individual calling you or whom you are calling. l 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. I l l 7. Che k the entry activity as to whether the individual called you or you are calling them. ~ c l e 1 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. 9. Enter your initia'Is upon completion of each Log Sheet entry. s e r i 8
-g CORPORATE EMERGENCY RESPONSE PLAN PACIFIC GAS AND ELECTRIC COMPANY Pows EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMERGENCY LOCATION TOOAY'S DATE PAGE (1) 12) (3) TIME ENTERED BY (2400 sws.) (INITIAL 5) (4) (si
SUMMARY
OF ACTIVITY PERFORMED (si b e 9 4, e 4 esass (s/s2) Rw.oo sat - m'CTION5 ON REVEr.8Y
= e EMERGENCY RESPONSE 'AND RECOVEMY ACTIVITIES LOG SHEET INSTRUCTIONS. Entry. Number instructions 1.' identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. ~ 5. Enter a summary of each ac,tivity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. f ~ f ~ l O e i
7 '] Rev. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.5, s SAFETY, HEALTH, AND CLAIMS APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Hane Phone Emergency Plan Title Nonemergency Title Business Phone Corporate Safety, 1. B. P. 'Sadler Health, and Claims Manager, Safety, Coo rdinator Health, and Claims 2. A. L. Rechtold Senior Attorney 3. C. W.' Allen Attorney 4. J. C. Vocke Attorney Director - Safety 1. R. D. Fagg Engineering Director, Safety Engineering 2. R. W. Hall Supervisor, Safety Engineering 3. M. W. Johnson Supervisor, Safety Engineering 4. P. C. Boe ttcher Supervisor, Safety Engineering Senior Claims 1. A. L. Bechtold Attorney Senior Attorney J Page 15 of 25
m ~ ~~ ] ~ Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCE. DURE _ PROCEDURE 3.5 i . SAFETY, HEALTH, AND CLAIMS l ~ ' APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Senior Claims 2. J. C. Vocke Attorney Attorney ~ (continued) 3. C.' W. All en Attorney 4. M. Jonas Attorney Senior Health 1. H. W. Reynolds Physicist Senior Health Physicist 2. P. C. Boettcher Supervisor, Safety Engineering Senior Claims 1. E. A. Giudici Investigator Senior Claims Invest.igator 2. D. G. Keeler Casualty Claims Supervisor ~ 3. J. C. Echols Senior Casualty Claims Supervisor 4. R. Wetzel Senior Claims ' Investigator j Page 16 of 25
~ ~ ~ Rev. 1 05/01/81 ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCE, DURE ' PROCEDURE 3.5 s SAFETY, HEALTH, AND CLAIMS APPENDIX E-2 (Continued) ' Effective Date: 01/01/83 ^ Name Home Phone Emergency Plan Title fionemergency Title Business Phone Claims Attorney 1. J. C. Vocke Attorney 2. 'C. W. All en Attorney 3. M. C. Dolan Attorney 4. 'M. Jonas Attorney Field Claims 1. C. 0. Schreil Investigator Claims Investigator , (San Luis Obispo) 2. T. F. Morris Claims investigator (Fresno) 3. S. P. Robison Claims Investigator (San Jose) 4. .E. Fortner Claims Investigator (Stockton) J ( Page 17 of 25
u Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE . PROCEDURE 3.5 SAFETY, HEALTH, Afd0 CLAIMS APPEtl0IX E-2 (Continued) Effective Date: 01/01/83 Nam'e Hone Phone Emergency Plan Title Nonemergency Title Business Phone ~ Senior Fire 1. W. S. Garrett Protection Senior Fire Protec-Engineer tion Engineer 2. L. L. McCune Senior Safety Specialist Safety Coordinator . 1. 'J. L. Frazier Safety Engineering Representative 2. M. W. Johnson Supervising, Safety Engineering 3. M. J. Johnson Safety Specialist 4. R. J.'Delucchi Safety Engineering Representative i American Nuclear Insurers Hospitals 1. French Hospital (San Lui s Obispo) 2. St. Francis Hospital (San Francisco), Page 18 of 25
c. .v v - Rev. 1 05/01/81
- l PACIFIC GAS AND. ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE i
PROCEDURE 3.5 SAFETY, HEALTH, AND CLAIMS APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST . Effective Date: 01/01/83 Emergency locattor$ Name Emergency Plan Title Normal Business Phon _e Emergency Phone Recovery Manager
- 1. _J. D. Shiffer hnr
] _3 L-u s 2. R, C. Thornberry 3 s
- 3.,J. D. Townsend
] L Corporate Lia'ison 1. R. J. Menavitt h~!RC Coordinator -] R. Foster
- 2., Sg
_3 6 1 3. T. A. Moulia 3 L 4. G; A. Pierce 3 Corporate 1. W. P. Noone heneral Office Insurance { ] g Coordinator 2. R. M. Reider ) ~ L 3.;C.A. Lewis _3 u Corporate Law
- 1., P. A._ Cra ne, J r.
heneral Offica Department ] Coo rdinator k 2. R Ohlbach ) 6
- 3.,R. F. Locke
) -~ L Page 19 of 25
T I t i j' - i I t 4 I s a i 1 I i 1-t I a t ) c 4 l i i 0 3 i 1 ? ki t J i' i i fi 1 l i. f I i E 1i J I ). f' 1 e i k. i I; f i-d 1 J .f.
s *. I Wg Dg g Mg g Mg fBg E G A n 9 i E TA D S Y' A O O n T' i I 6 / N s O I T A C O L i YCN E G R E M o E t i TE e EH Y T S I W N G T A O C Y L NP L A A E S P S MN N ) y OO O g CP I S C T I E RR A T Y C N e O C t C I LN N T E E U A E G I D R M NE M IL F AM F O A SE A E C R GT Y O CA E R C I L FI O N IT CP E T AR POG Y C R C E N E E M M G E A R N E 0 M E 0 v l e E R ( ) 2 ) 8 .s /8 r g E h ( M0 46 0 1 I g T4 4 2 9 g 6 p ( g
EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS i ~ Entry Number Instructions 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) \\ Enter the date which this Form is being used. Start a new Log Sheet each' day. 2. 3. Consecutively number each page used each day. 4. Enter the time'for each Log entry. Use the 2400 hour clock to avoid confusion. i 5. Clearly record the name of the individual calling you or whom you are calling. I
- s 6.
Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. Che k the entry activity as to w'hether the, individual called you or you are cilling them. 7. c t 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. 4 P
o .. s. FKflFICCAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN POes EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EMER4ENCY LOCATION 700AY'S DATE PAGE n ~ str - tai im TIME ENTERED BY (2400 hesj llNITIALS se tai
SUMMARY
OF ACTIVITY PERFORMED tm 4a4 { e t \\ N MI A" # SEE INSTRUCTIONS ON REVERSE
r C /p EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET . INSTRUCTIONS .y Entry Number Instructions b 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. ~ 3. Consecutively number each pa'ge used each day. T 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid j confus, ion. 5. Enter a summary of each activity being recorded. l 6. Enter your initials upon completion of each Log Sheet entry.. = l v, ~J i 9
3 .,v. .~. s o PACIFIC GAS AND ELECTRIC COMPANY Re v. 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 <^-s IMPLEMENTING PROCEDURE I e J J PROCEDURE 3.6 SECURIC APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION, CORPORATE SECURITY DEPARTMENT RELATIONSHIPS RECOVEks
- MAhACEh (LOf )
/ CCEPAATE LI AISs%I COORCINATCP (CIRC) -.q COaPGAATL h!TE CH s RATL SECUh17Y SkWhtTY jf[h COORCINATOR SUILRVISCR CO'6CIhAN D (CENEkAL OtFICE) s t h.*) UJhE E Of6 ICE) } i. n BUILDING CLhKMTE Shah:TY oNSITE SECLAITY REPRESENTATIVE KJ RErkESEh"FATIVES PEkh6NNEL SurERv! Son CONT uCT SECURITY (GENEhAL CITICE 6 REPPESLNTAT!vE (CENEAAL OFFICE) ISAN LIIIS 091$f0) SAN LUIS OSISFO) (CIABLO CANYOf) ..i l g-.. I i. SAN LUIS OBISPO COUNTY SHERITr*$ orTICE Legand1 Line Authority Coordination - -.- Corporate Security Department Personnel OSC - Operational Support Center CIRC - Corporate Incident Response Ce'nter Ect' - Ipergency Operations Facality 1, Page 11 of 32
Rev. 1 05/01/81.* PACIFIC GAS AND EldCTRIC COMPAN'Y CORPORATE EMERGENCY RESPONSE PLAN ~ IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY ~ APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Ho[ne Phone Emergency Plan Titia Nonemergency Title . Business Phone Corporate Security 1. L. H. Shaffer Coordinator Director of Security 2. J. R. Van Schaick Supervising Securi-ty . Representative 3. R. Dunleavy Senior Security Representative. Security 1. V. Dettman Representatives Securi ty Representative 2. M. Person Security Representative 3. J. Nichols Security Representative 4. L. Lawrence Security Representative 5. L. Adams Securi ty Representative 6. F. C. Kobely Security Representative Page 12 of 32 l-
v ~ Rev. 1 05/01/81 PACIFIC GAS AF.0 ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ~ (..,. PROCEDURE 3.6 SECURITY ~ ' APPENDIX E-2 (Continued) Effective Date: 01/01'/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone 3 San Luis Obispo 1. Sheriff's Operations County Sheriff's
- Facility Office Buildirig Security 1.
R. J. Eiden Supervisor Security Supervisor 2. A. Jinkerson A_dministrative Assistant 3. R. D. Manning Mngr. Building Administrative w Services Department Page 13 of 32
~, v Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE r-e' PROCEDURE 3.6 SECURITY APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone ~ Recovery Manager
- 1.,J. D. Shiffer EOF
'l L ]
- 2. _R. C. Thornberry 6
~ 3' 3. J. D. Townsend Corporate Liaison 1. R. J. McDevitt .{ CIRC "~ Coordinator } t 2. S. R. Foster e-L
- 3..T. A. Moulia J
~
- 4.. G. A. Pierce d
Site Security 1. L. G. Lunsford OSC Supervisor ] { ~ 2. R. G. Todaro ~ J 3. UNASSIGNED Corporate Personnel 1. H. S. Pitner General Office Relations Coordinator L [,
- 2., T. J. Wal sh, Jr.
) L 3. T. J. Zimbrick L ] Page 14 of 32
s' ~ PACIFIC GAS AN6 ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY APP 5NDIX E-3 (Continued) Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone Onsite Personnel 1. D. Okabayashi [dSC Representative ] L 2. _L. _ Campbell L 3 1 Page 15 of 32 rn - w
c.. s hv. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY - l CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE p-PROCEDURE 3.6 SECURITY -- APPENDIX E-4 PRESCREENED RESPONSE PLAN PE_R_SONNEL LIST i Effective Date: 11/24/80 Name ID No. Department e.+ 9 + = = ** ase em 0 6 PAGE 16 0F 32
.v v ,~ 0$f61f8k ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE D1ERGENCY RESPONSE PLAN ~ IMPLEMENTING PROCEDURE. PROCEDUAE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 A. The ON DUTY Corporate Em'ergency Response Organization (CERO) personnel who are a authorized to make on-the-spot changes to this Restricted Access List are: ~ 1. Member of Corporate Administrative Suy' port Coordina' tor's Staff at Guards Table, 14th Floor 77 Beale Streeti ' 2. Corporate Liaison Coordinator [. 3. Corporate Emergency Coordinator; B. Restricted Personnel Access Authorization List (*means CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. Page 17 of 32
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE (-~, PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restrictbd Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO l l l THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.. Page 18 of 32
p 'Rev. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE 3 ~ s PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST. Effective Date: 12/01/82 ' B. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): . CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE ~ PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY. COORDINATOR. l l i Page 19 of 32 l s
--~,, -.. s. Rev. 1 05/01/81' ~ PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: I':/01/82 'B. Restricted Personnel Access Authorization List (Cont'd.),(*means CERO member): CIRC SADGE ISSUED NAME DEPARTMENT YES NO o THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY C00RCINATOR. i ,Page 20 of 32
r-s Rev. 1 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ,s PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/8'2 B. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED . NAME DEPARTMENT YES NO \\ s i THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. Page 21 of 32
] ~ ~ ~ 'Rev. 1 05/01/81-PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN' IMPLEMENTING PROCEDURE (, PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restricted Personnel Access Authorization. List (Cont'd.) (*means' CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO 1 W THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE ~ PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR.. I._ Page 22 of 32
7 ~ g 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE (- '- PROCEDURE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED - NAME DEPARTMENT YES NO s THEINFORMATIONONTHISPdGEANDALLSUCCESSIVE ~ PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT j IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. 1 Page 23 of 32
.= Rev. 1 05/01/81 PACIF.IC GAS AND ELECTRIC COMPANY . CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ',.~ ~ . PROCEDURE 3.6 s SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B. Restrictid Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO ' THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. l l h Page 24 of 32
..v. Rev. 1 05/01/81 ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ~ PROCEDORE 3.6 SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST i ~ Effective Date: 12/01/82 B. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): ' CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND ALL SUCCESSIVE I PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT i IS ON FILE WITH THE CORPORATE SECURITY COORDINATOR. Page 25 of 32 ,1
.o Rev. 1-05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN ' (~'._ i IMPLEMENTING PROCEDURE s PROCEDURE 3.6 e SECURITY APPENDIX E-5 RESTRICTED ACCESS AUTHORIZATION LIST Effective Date: 12/01/82 B'. Restricted Personnel Access Authorization List (Cont'd.) (*means CERO member): CIRC BADGE ISSUED NAME DEPARTMENT YES NO THE INFORMATION ON THIS PAGE AND'ALL SUCCESSIVE PAGES FOR THIS IMPLEMENTING PROCEDURE ATTACHMENT IS ON FILE WITH THE-CORPORATE SECURITY COORDINATOR. 1. i Page 26 of 32 i
j O e E M S l R Du E Es B V En E t e e R BD E 4 G O ) A s E ti s ON IT E T C A U D RT S E 'Y N I A D E = E O a S T t = i N O I T A e. CO L YCN E G R ) EM i E n T E EH Y T S IV N G IT A O C Y L NP L A A E S P S MN N )7 OO O ( CP I S C T E IRR A T Y C N 4 O C C I N N T E I L E U A E G I D R M L I NE M F AM F SE O A A E C R GT CA Y O E R C I L F ON T ICP I AR E T POG Y CR C E N E E M M G E A R N EM M. j E v 9 eR 4 ) l 2 a 4 g E h (9 M0 m 6 0 IT42 4 9 1 g 8 i
g, PACIFIC GAS ANO ELECTRIC COMPANY COswvsATE EMERGENCY RESPONSE PLAN EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET f'- - EMERGENCY LOCATION TODAY'S DATE PAGE (1) (2) (3) TIME , (2400 hrs.) ENTERED BY (INITIALS)
SUMMARY
OF ACTIVITY PERFORMED (en (4
(s) o m
u
'd w oes Jai to assure correct copy /transmissi'on.
t e
9.
Enter your initialt upon completion of each Log Sheet entry.
b d
1 V
-d g
FIL'TFTCGAS ANO ELBCTRIC COMPANY CORPORATE EMERGENC,Y RESPONSE PLAN -
POe5 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG 3HEET EMERGENCY LOCATION TOOAY'S DATE PAGE (1)
(2)
(3)
ENTERED BY TIME tam hm.)
.4tNITIALS) te (si
SUMMARY
OF ACTIVITY PERFORMED tai l ~ r. e 4
- 486 (8/82) Rev. 00 SEE 4NSTRUCTIONE ON REVER5L
,,,n .-_.-y e.
c. " ~ ') EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS Entry Number Instructions 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) ~ 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity oeing recorded. 6. Enter your initials upon completion of each Log Sheet entry. 6 a m a.ae aw.
.v. e Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPAN.Y ~ CORPORATE EMERGENCY RESPONSE PLAN (~' IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E_1
- EMERGENCY RESPONSE ORGANIZATION, RADIOLOGICAL ANALYSIS AND PROTECTION RELATIONSHIPS e
_.3 l l [____ __ __ ______ :i._ _ ___,.__ __ ____ ~} . i '"4' ","g" lr l l g l t, [I i i - { ._= _ =, j i:, i I i lll . =......1 ~gr -j,____________- =,,,,;.
- r,..,,
-
- l.;::,,
l l = = > l l l 1.________.. l l l ______3 i i ._4. .,= l =:=- j i l 1 i I L d.. -, l! l I "."r L== I u. - j _..
- i. _.. _..
.....i mi n. 7 l -i .,..i., ,r,,, .e. 1c":. e.. i l l t ~s Page 13 of 25
.FWy.'2 08/08/81 PACIFIC GAS AND ELECTRIC C0t1PANY. CORPORATE EMERGENCY RESPONSE PLAN I-,. IMPLF'AENTING PROCEDURE s PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION ~* APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone ~ Radiological Emergency l'. W. H. Fujimoto Recovery Manager Supervising Nuclear Generacion Engineer 2. UNASSIGNED 3. D. P. Serpa Sr. Nuclear Generation Engineer 4. S. M. Skidmore Asst. Project Hngr. Emergency Supervising 1. D. P. Serpa Engineer - Sr. Nuclear Generation Engineer 2. R. W. Lorenz Sr. Nuclear Generation Engineer 3. T. A. Mack Sr. Nuclear Generation Engineer Radiological 1. D. L. Duke Mon itoring Nuclear Generation Director Engineer 2. K. M. Godfrey Environmental Specialist 3. C. T. Polidoroff Nuclear Generation Engineer J Page 14 of 25
u ~ ~ ~ ~ Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY- [ .s' CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ~ PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Radiological Monitoring 4. S. M. Fandel Director (continued) Planning Analyst EARS Operator (CIRC) 1. C. C. Shih Nuclear Generation Engineer 2. G. A. English Nuclear Generation
- Engineer 3.
S. R. Foster Health Physicist EARS Operator (E0F) 1. H. C. Shaw Senior Mechanical Engineer 2. J. S. McKarns Industrial Hygenist 3. R. A. Uba Nuclear Generation Engineer Supervising 1. M. L. Mooney Meteorologist Supervising Meteorologist 2. R. N. Swanson Senior Meteorologist 1 3. R. H. Thuillier Senior Meteorologist t Page 15 of 25
a 6 Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE El1ERGENCY RESPONSE Pl.Afl i ('- IMPLEMEt(TING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS Af40 PROTECTION , APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone DER Laboratory 1. P. A. Szalinski Director Lead Health Physicist 2. C. S. Cheng Chemist 3. J. H. White Lead Health Physicist E0F Secretary 1. H. G. Weese Secretary B i , 2. UNASSIGNED General Clerk-Steno 3. D. A. Campus Admin. Clerk-Steno PGandE' UDAC Sta f f 1. R. W. Lorenz ' Senior Nuclear Generation Engineer 2. T. A. Mack Senior Nuclear Generation Engineer 3. E. V. Waage Nuclear Generation Engineer 4. D. L. Duke Nuclear Generation Engineer a Page 16 of 25
~ . Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY, CORPORATE EMERGENCY RESPONSE PLAN ( IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-2 (Continued)_ ~ Effective Date:- 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone PGandE UDAC Staff 5. G. A. English I (continued) Nuclear Generation i Engineer 6. UNASSIGNED EOF Administrative 1. S. M. Fandel Staff Planning Analyst. Page 17 of 25 I
^ F.
- ~
Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN ( . IMPLEMENTING PROCEDURE PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone s Recovery Manager
- 1. _J. D. shiffer fEOF L
-) (
- 2.,R. C. Thornberry g
- 3. J. D. Townsend _
) ~ L Public Information
- 1.,p. J. Baxter EOF Recovery Manager
_] u g ~
- 2.,C. H. Peterson
] 3. S. N. Coffey J Emergency
- 1. _J. V. Boots
[TSC Radiological Advisor L L
- 2.,U. A. O'Hara 6
-3., H. W. C. Fon g ) 6 r California Office 1. Warning Center -Sacr- ~*~ of Emergency 24 hour) or Services s. (.. Page 18 of 25
,~. Rev. 2 08/0Q/81 PACIFIC GAS AffD ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAtt (' IMPLEMENTING PROCEDURE N PROCEDURE 4.3 RADIOLOGICAL ANALYSIS AND PROTECTION ~ APPENDIX E-3 (Continued) Effective Date: 01/01/83 ~ Name Eneroency Location Emeroency Plan Title Normal Business Phone-Emergency Pnone California Office 2. M. F. Reed htate EOC - Sacramento ~ ' of Emergency [ J Services (continued) 3. J. J. Watki_ns State EOC - Sacramento E J ' ~ , Department of 1. P. A. Szalinski DER - San Ramon Engineering ] Research k Laboratory
- 2. M._Cheng J
t 3. J. H. White J m ~ Mobile 1. R. W. Richardson Mobile Environmental Radiological J Monitorina Lab Laboratory 1r Service LCenter - 2. M. C. Kunde L ] - 3. P. A. Szalinski b 4. (Member of DCPP ~ Radiation Protection staff) California 1. E. I Vold Sacramento Department of (, ] (all hours) Health Services Emergency Only Radiologic
- 2. _J. O. Ward U
3ffice Hours Health Section ] ( 3. L. R. Carter t J Page 19 of 25
~ ~ o Rev. 2 08/08/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN' (% IMPLEMENTIfiG PROCE00RE' PROCEDUR 4.3 RADIOLOGICAL ANALYSIS Al10 PROTECTION APPENDIX E-3 (Continued) Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone PGandE/ Cal Poly State 1. J. H. White lalPoly-SanLuisObispo,CA"' Univ. Radiological [ j ~ . or Laboratory e 2. QmpusPolice 3. _T. Ushino _J ~ ~ NRC - Region V 1. H. E. Book Walnut Creek, CA (24 hours) 2. D. Kunihiro or 3. D. Sternberg 4. J. Crews FEMA - Region IX 1. J. Eldridge S,anFranciscb,CA 'tuty hours) 2. K. Nauman or I (24 hours) V. S. Department 1. C. Jackson Oakland. CA of Energy 2. F. Fong Environmental
- 1. - D. Duncan San Francisco, CA Protection
~ or Agency (24 hour) = i V l Page 19a of 25
e f .] ) f = i PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION peg CORPORATE EMERGENCY RESPONSE PLAN TOOAY1 DATE ' AGE EMERGENCY COMMUNICATIONS LdG SHEET tu fl8AE NAME la im ACTIVITY (2400 lws.) M NE 17) d g EIAERGENCY TITLE OR AFFILIATION. M e e t s s' t 8 g s i 4 = GEN)S4 (8/82) Rev. 00 SEE 185TRUCTl006 0 t REVERSE
s EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS t Entry s e< " ~ ' Eomber Instructions 1. Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate incident Response Cent'er, Materials Dept., Emergency Operations Facility, etc.) ~~ '2. Enter the date which this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. Enter tb time for each Ldg entry. Use the 2400 hour clock to avoid confusion. 4. Clearly record the name of tne i idO!duaicalling you or whom you are callipg. 5. ~ 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. - s i 7. Che k the entry activity as to whether the individual called you or you are calling them. c 8. Enter the entire context of the message being communicated. Read back the message to tlw individual to assure correct copy / transmission. g ? 9. Enter your initials upon completion of each Log Sheet entry. h ~
ry e PIETFICTAS AND ELECTRIC GGiviFANY CORPORATE EMERUENGY RE5PONSE PLAN Poes g EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET EM8RGENCY LOCATION ,.s, TODAY'E DATE IPAUa tu tai tai TIME ENTERED BY (8400 hm) (INITIALS) se is:
SUMMARY
OF ACTIVITY PERFORMED tai O e y 0 e n O O O 4 e 0 e 6 m 4 E M (8/82) Aew. 00 SEE INSTRUCTIONS ON REVERSE
-y. s ~ j ~ o m O I ~ EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET l INSTRUCTIONS 1 Entry Number instructions 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Canter, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day, w 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid ) confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. 1 e l f e
~. PACIFIC GAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN * .05/01/81 IMPLEMENTING PROCEDURE. 3 i / PROCEDURE 4.4 GENERAL CONSTRUCTION \\ i l APPEN6IX E-1 EMEN.*ENCY RESPONSE ORGANIZATION, GENERAL CONSTRUCTION DEPARTMENT RELATIONSHIPS matwest ma.s.a.se,s r M89 4. '"c Mi, li = or.or, a _.._..-..-.._.._..-..q l etummaan s.- l v - -,o, l l l l 1 l i 9 g saw sumacan ammaca umancas amaacu yggg,, tant Crvat.sveno cas 8 .l. e.spasgnant au apsu.ust, e.m.a.ssmaur p p agew, mew, g .a.m. mans a.m. . -in, . - >ce, e<=== -,ai .. -.. -.. -==.. -.. -.. -.. 18 Weed a Line Aetemraty Coordinataan " * * = *. *=. C.o.rporate Cuestrisetten geportmee.
==. r-a,.r ui., c=. ,.r i 1a.v. Page 9 of 19
-c m m Rev. 1 05/05/81 ~ PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s, IMPLEMENTING Pit 0CCOURE I PROCEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS tOTIFICATION. LIST Effectfi.e Date: Oi/01/83 Name Home Phone Emergerty Plan Title Nonemergency Title Business Phone Corporate Construction 1. R. S. Bain Coordirator Manager, Station Construction 2. J. R. Manning Superintendent, Station Construction 3. M. R Kunz Superintendent, I Station Construction 4. P. J. Nelson Asst. Superintendent, Station Construction 5. B. T. Saenz ~ Station Construct Admin. Supervisor ~ Site Construction 1. R. D. Etzler Coordinator DCPP Construction Superintendent 2. M. N. Norem Resident Startup Engineer 3. D. A. Rockwell Resident Electrical Engineer Manager, Line 1. W. M. Stubblefield i Department Manager, Line J Construction k Page 10 of 19
~ n \\ Rev. 1 05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN s IMPLEMENTING PROCEDURE ( PR'0CEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-2 (Con'tinued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Manager, Line 2. J. V. Butler Department Line Construction (continued) Superintendent 3. O. D. Smith Supervisor, Line Construction ~ Manager, Civil-Hydro 1. P. G. Damask Department Manager, Civil-Hydro Construction 2. L. G. Rasmussen Civil-Hydro Construc-tion Superintendent 3. R. R. Friedrichs Civil-Hydro Construc-tion Superintendent Manager, Gas-Mechanical 1. W. Funabiki Services Department Manager, Gas-Mechanical Services Construction 2. R. P. Baur Gas-Construction Superintendent 3. M. R. Biro Gas-Construction Mech. Sycs. Transpor-tation Superintendent '4. J. R. Darby Gas-Construction Superintendent ( 5. T. Long s-e Gas-Construction - Mech. Sycs. Assistant J Superintendent Page 11 of 19
m Rev. 1 05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN, IMPL,EMENTING PROCEDURE I( s 1 j PROCEDURE 4.4 1 GENERAL CONSTRUCTION Effective Date: 01/01/83 .Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Manager, Personnel 1. L. C. Beanland and Clerical Manager, G.C. Services Personnel and Clerical Department Services Department 2. A. B. Stetler Superintendent, Personnel and Clerical Services Department 3. H. Little Administrative Super-visor, Personnel and ,j Clerical Services Department ~ ~ l Page 12 of 19
.ww c ~ Rev. 1 PACIFIC GAS AND ELECTRIC COMPANY 05/05/,81 CORPORATE EMERGENCY' RESPONSE PLM I IMPLEMENTING PROCEDURE ( PROCEDURE 4.4 GENERAL CONSTRUCTION APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 NamE Emergency Plan Title Normal Business Phone Emergency Location Emergency Phone Recovery Manager 1. J. D. Shiffer g EOF WaI l. ~,, L 2. R. C. Thornberry - J L ] ~
- 3. _J. D. Townsend
- -- 3 Corporate Technical 1. J. B. Hoch and Logistical 1 -CIRC c' Coo rdinator L 3 L 2. M. R. Tresler ^ L' ] 3 1 A. Young ~ Corporate 1. T. R. Ferry Communications 3 -Gen.. 1 office _ Coordinat:r 2. A. J. Nevolo ( ) 6 3. C. D. Gilson L 3 C r
- 1. _D. L. Kennady
$los Padres District Off. ~ Coordin@r 6 3 0F 2. B. McCloskey t. j u
- 3.,_R. J_. McKell L
Page 13 of 19
e q 1 Rev. 1 ~ 05/05/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLA1 IMPLEMENTING PROCEDURE ( s PROCEDURE 4.4 i GENERAL CONSTRUCTION l APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Nam 6 EnErgency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1. J. D. Shiffer h0F ~ L ] L 2. R. C. Thornberry L J 3. J. D. Townser.c -~3 Corporate Technical 1. J. B. Hoch -CIRC and Logistical { ] ~ Coordinator L 2. M. R. Tresler L' 3 3. R. A. Young ] Corporate 1. T. R. Ferry Gena -1 office Communications ] Coordinat:r L. 2. A. J. Nevolo 3 n 3. C. D. Gilson L ) ~ Corporate
- 1. 'D. L. Kennady Los Padres District Off.
~ Division j or Coordince or 2. B. McCloskey g.
- 3.,R. J. McKell L
Page 13 of 19
PACIFIC OAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN EMERGENCY LOCATION pe,g iuuAYS DATE
- AGE EMERGENCY COMMUNICATIONS t.OG SHEET til TIME NAME (2400 lws.)
l# ACTivlTY la (a 17) I4 EMERGENCY TITLE OR AFFILIATION NE een N CALLED CALUNG MESSAGE ,tet 4 s 9 1 s p i t i 1 e e t i i 2 SEE BOSTRUCTl005 0 0 REVERSE. I. 69484 (8/82) Rev. 00
i EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS = 3 Entry Number Instructions 'f 1. Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) i l 2. Enter the date which this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. ' Use the 2400 hour clock to avoid confusion. t 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. 7. Che k the entry activity as to whether the individual called you or you are calling them. c s 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission t i 9. Enter your initials upon completion of each Log Sheet entry., ~ e S e i e S 1
q .3, ~. }
- y a
o FAEIFRf5AE AND ELECTRIC COMPANY C0hrwhATE EMERGENCY RESPONSE PLAN po.s s EMERGENCY RESPONSE AND RECOVERY A'CTIVITIES LOG SHEET EMERGENCY LOCATION i TOOAY'S DATE PAGE Ill (2) (2 TIME ENTERED BY (2400 lwsJ llNITIALS)
SUMMARY
OF ACTIVITY PERFORMED te ese is i). m 4 e e O f e 5 9 g O e / ( u.. I SEE INSTRUCTIONS ON REVERSI,
~ 3 0 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET - INSTRNCTIONS ~ Entry ~ ~ Number -
- Instructions 1.
Identify the emergency lxation where this Log Sheet is maintained s during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) ~ 2. Enter the date which this form is being used. Start a new Log Sheet i each day. ~ 3. Consecutively number each page used each day 4. Enter the time for each L-og entry. Use the 2400 hour clock te avoid confusion. ~ 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry.. O 4
05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE, ( ~ PROCEDURE 4.5 ENGINEERING AND TECHNICAL SUPPORT APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 .Hane Phone Name s Emergency Plan Title Nonemergency Title Business Phone Corporate Engineering 1. G. H. Moore Coordinator-DC Project Engineer 2. J. V. Rocca Chief Mechanical and Nuclear Engineer 3. R. V. Bettinger Chief Civil Engineer 4. J. R. Herrera ( Chief Electrical Engineer 5. G. H. Aster Chief, Design-Draf ting Chief, Design-Drafting 1. G. H. Aster Chief, Design-Drafting t 2. G. A. Kaschube Project Coordination l Section Supervisor 3. E. A. Punzalan l Project Coordinator Chief Mechanical & 1. J. V. Rocca Nuclear Engineer Chief Mechanical and Nuclear Engineer Page 9 of 17
~,, - u. g 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ,s '. ( PROCEDURE 4.5 ENGINEERING AND TECHNICAL SUPPORT APPENDIX E-2 (Continued) EffectiveDatek 01/01/83 Name' Home Phone' Emergency Plan Title Nonemerge.ncy Title Business Phone Chief Mechanical & 2. D. O. Brand Nuclear Engineer Supervising Mechanical (continued) Engineer 3. R. M. Laverty Mechanical Systems Group Leader Chief Electrical 1. J. R. Herrera Engineer . Chief ~ Electrical Engineer 2. J. W. Colwell Chief Electrical Engineer 3. F. J. Dan Supervising Electrical Engineer C'hief Civil ' Engineer 1. R. V. Bettinger Chief Civil Engineer 2. V. J. Ghio Senior Civil Engineer 3. J. A. McLoughlin Sr. Civil Engineer e' Page 10 of 17
.] . Rev. 1 - PACIFIC GAS'AND ELECTRIC COMPANY. 05/01/81 CORPORATE EMERGENCY RESPONSE Pi.AN . / INPLEMENTING PROCEDURE ~ PROCEDURE 4.5 ENGINEERING AND TECHN-ICAL SUPPORT APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plah Title Normal Business Phone Emergency Phone ~ Recovery Manager 1. J. D. Shiffer h0F L' [ J 2. R. C. Thornberry ] w
- 3. _J. D. Townsend...
Corporate Technical 1. J. B. Hoch/ rCIRC s and Logistical {. j g g - Coo rdinator 2. M. R. Tresler f U 3: R. A. Young , ~ 3 6 6 o e e Page 11 of 17 i
e I 'N ) L .'s l PACIFIC GAS AND ELECTRIC COMPANY I EMERGENCY LOCATION i CORPORATE EMERGENCY RESPONSE PLAN TOOAY1DATE ' AGE pg.,g EMERGENCY COMMUNICATIONS LOG SHEET ~ in sa ta TIME NAME ACTIVITY (2400 Bus.) l# NM (7) g EMERGENCY TITLE OR AFFILIATION SSTMaal E i t 0 e e t i 1 1 i I g e 1 6 I 4 81N)8418/82) Rev.00 W P '=" = N * ** *
- e I
I EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS l / Entry Number instructions 1. identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) l 2. Enter the date which this Form is being used. Start a new Log Sheet each day. t 3. Consecutively number each page used each day. i 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency. Organization Title or their non PGandE affiliation. 7. Chhk the entry activity as to whether the individual called you or you are I:alling them. ~ 8. Enter the entire context of the message being communicated. Read back the message to the individual.to assurp correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. )
~ ^^ ' ~ \\ I o PACIFIC GAS AN,3 ELECTRIC COMPANY ""r anA EP E& l 1 POwB EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET, EMERGENCY LOCATION TODAY'S DATE PAGE I (~% I (1) (2) (3) TIME ENTERED SY (INITIALS) (2400 hre.) (m - (sl '
SUMMARY
OF ACTIVITY PERFORMED te i e G e m 7 1 t e m N_,j e..e =. -- --w
- = -. y o S EMERGENCY RESPONSE AND RECOVERY ACTIVITIES t.OG SHEET INSTRUCTION _$ Entry Nurnber instructions l 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Staria new Log Sheet each day. 3. Consecutively number each page used each day. i i i i 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid j confusion. ~ 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry.. ~ m e m J
Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY, CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE x . PROCEDURE 4.6 COMPUTER SYSTEMS AND SERVICES i APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS IOTIFICATION LIST Effective Date: 01/,01/83 Name Mme Phone Emergency Plan Title. Nonemergency Title Business Phone Corporate Computer 1. A. W. Simila Applications Manager, Engineering Coordinator Computer Applications 2. R. M. Wetherell Supervising Mathema-tician-Programer 3. B. M. Speckman
- Supervising Computer Applications Engr.
Supervis'ing Engineering' 1. R. M. Wetherell Computer Applications Supervising Mathema-Specialist tician-Programer 2. B. M. Speckman Supervising Computer Applications Engr. 3. F. M. Perfetto Senior Computer Systems Analyst Supervising Computer 1. L. H. Carter Technology Senior Cmputer Specialist Systems Analyst 2. R. C. Knisely Software Specialist 3. D. W. Holmes Senior Computer Systems Analyst (. Page 11 of 20
7 .a.- o s Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC C0f1PANY ~ CORPORATE'EtiERGENCY RESPONSE PLAK- . IMPLEMENTING PROCEDURE PROCEDURE 4.6 ~ COMPUTER SYSTEllS AND SERVICES ~ APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name ' Home Phone Emergency Plan Title Nonemergency Title Business Phone Supervising Computer 1. W. R. Barnes Operations Supervising Computer Specialist Operations Analyst 2. J. J. Monahan Scheduling and Con- '. . trols Sect. Super. 3. W. R._ Richardson Sectio,n Supervisor Production Supervising Information 1. G. Swallow Systems Specialist Senior Information Systems Analyst 2. J. C. Simpson Supervising Analyst 3. H. S. Stout Information Systems Analyst ~ ~~ Page 12 of 20
n. Rev. 1 - 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY ' CORPORATE EMERGENCY RESPONSE PLAtt ( ' '. IMPLEMENTING PROCEDURE PROCEDU' E 4.6 COMPUTER SYSTEMS AND SERVICES APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST
- Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone
~ Recovery Manager
- 1..J. D. Shiffer
._ 'J EOF 5-L 2. O C. Thornberry J 3. J. D. Townsend j Corporate Technical 1. J. B. Hoch CIRC l and Logistical [. J Coo rdinator L 2. M. R. Tresler ~ t L 3. R. A. Youno Y ^'1J Manager, Computer 1. H. Liu General Office Systems Technology J ~ ~
- 2.,_L. H. Carter
_3 L ~ 3.
- o. W. Holmes
] L ~ Corporate 1. A. W. Simila Gena--' MHea Computer ,j Applications L Coordinator 2. R. M. Wetherell L J 3. R. M. Speckman L. Page 13 of 20
^ ~ Rev. 1 PACIFIC GAS AfiD ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN '5 ' IMPLEMENTING PROCEDURE a. ~ PROCEDURE 4.6 ~ COMPUTER SYSTEMS Al40 SERVICES APPENDIX Ec3 (Continued) ~ Effectivi Date: 01/01/83 Eiergency Location Name Emergency Plan Title Normal Business Phone Emergency Phone
- Manager,
- 1. _R. W. Barbey fGeneral Office Information 3
3 ( Systems
- 2. _G. Swallow 3
6. 3. J. C. Simpson J Manager, Computer 1. D. L. Hawkins fGeneral Office ~ Operations ) ' '1 g 2. W. R. Barnes ] t 3. R. J. Wells ] k._ Page 14 of 20
o t PACIFIC GAS AND ELECTRIC COMPANY EMERGENCY LOCATION pg g CORPORATE EMERGENCY RESPONSE PLAN TOOAY'S DATE ' AGE EMERGENCY COMMUNICATIONS LOG SHEET tti TIME NAME tal t3l (2400 tws.) (# ACTIVITY 17) NE EMERGENCY TITLE OR AFFILIATION N s 0 n ,a R t 4 o 604384 (8/82) Rev. 00 SEE IONTRUCTIONS O d REVERSE
j r EMERGENCY COMMUNICATIONS LOG SHEET \\ INSTRUCTIONS s s Entry Number Instructions 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate Incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this Form is being used. Start a new Log Sheet each day. / 3. Consecutively number each page used each day. 4. Enter the time for each Log entry.' Use the 2400 hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. Che k the entry activity as to whether the individual called you or you are calling them. 7. c 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. J
.7, g PActrm. GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RE5PONSE PLAN PN EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ,TODAY'S DATE PAGE / \\ EMERGENCY LOCATION (1) (2) (3) TIME ENTERED BY (E400 hrs.) (INITIALSI (e (si
SUMMARY
OF ACTIVITY PERIORMED (s) j 4 i \\ \\ 1 I W / S486 (8/02) Rev.00 SEE 80STRUCT1085 ON REVERSE
o ~ ( ~ l .~ 3 F s a EMERGENCY RESPONSE AND RECOfliRY ACTIVITIES LOG SHEET ~ INSTRUCTIONS Entry Number instructions 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) ~ 2. Enter the date which this form is being used. Start a new Log Sheet each day. 3. Consecutively ilumtieriach page used each day. 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid' ; confusion. i s-5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry.
- f f
v. I J 4t x
n. .g o o PACIFIC GAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 (" IMPLEMENTING PROCEDURE. PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS ~ APPENDIX E-1 t EMERGENCY IT5PON37.rORGANIZATION, NUCLEAR PLANT OPERATIONS DEPARTMENT RELATIONSHIPS c .e-s ~ t I
- n.. n.,
fTV.6 f,0..P. i e.-, r,. an - l l =m.,.. =,,::,'.:; r-- c,,,,.- ci -, ~. ~ .,c cr. v. e j l.._.i_.._.._.j_.._._.j_..J i e F.. - J g*gy. _ _ _ ____... _.. _ _ _ _ _...$...........m....... e i .,.4,,..,y;,, e e 1 0 j/. I-c ae, i n ",.] u A th.,aiy t, e,',q, : ..r ....................--.s c~*~u~ .,.m c.,,,..,, i...,s, ca... o,...u c.. ~ i /. 7 , j var - so.. cy ap...... r.e m e, -b ei.e. e.. ,.t. i.,eis.. . -.. c..., .t >V s,' , ne. v....i. n c.., t. s c.e. ..u
- .. n e.....
A \\ s <N,l ' v .s Page 9 of 18 s E
- he i-w, ep.
,e.g .iep- ,,m,*,m.,e-w y.p--- 4-- -g T w
!'S%d81 PACIFIC GAS AND ELECTRIC COMPANY ~ CORPORATE EMERGENCY RESPONSE PLAN - IMPLEMENTING PROCEDURE g s, PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS APPENDIX E-2 EMERGENCY ORGANIZATION CONTACT LIST Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager
- 1. _J. D. Shiffer EOF L
- 2..R. C. Thornberry 3
6
- 3. _J. D. Townwnd 6
J v Corporate Liaison Coordinator 1. R. J. McDevitt CIRC g_ ~] 2. S R. Foster } --,o b
- 3. J. A. Moulia
.r ) 6 4. G. A. Pierce ~~ 3 Corporate Technical 1. J. B. Hoch (CIRC ~ and Logistical bs... J Coo rdinator L 2. M. R. Tresler or
- 3.,R. A. Young
-j ~ Operations and 1. J. D. Townsend EOF Analytical 7 ~ ] or Recovery Manager w i w.. 2. u T. Rapp J Page 10 of 18
m. Rev. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN /- IMPLEMENTING' PROCEDURE PROCEDURE 4.7 NUCLEAR PLANT OPERATIONS APPENDIXE-2.(Continuedl Effective Date: 01/01/83 Name Emergency Location Emergency Plan Title Normal Business Phone Emergency Phone Operations and 3. L. W. Giffin Analytical Recovery { " ] Manager (continued) Radiological biergency 1. W. H. Foiimoto E0F Recovery Manager [ 7 ~ L 2. UNASSIGNED ~ ~ 3. D. P. Serpa '- _J ' ~' 7 7 4. S. M. Skidmore Engineering and 1. B. W. Giffin EOF Logistics Recovery G. 3 L 2. A. l. Simmons ) 6 3 3 C. Ru'ssell _J 6 Site Emergency 1. R. C. Thornberry FTsr Coordinator ] 2. R. Patterson L- ]
- 3. _J._M. Giscion J
Emergency Evaluations 1. J. M. Gisclon TSC and Recovery j Coo rdinator L-2. D. A. Miklush 6 Page 11 of 18 h
~ m -m v a-i Rev. 1 ,05/01/81 PACIFIC GAa AND ELECTRIC COMPANY CORPORATE EMERGENCY REf PONSE PLAN - IMPLEMENTING PROCEDURE PROC 200RE 4.4 NUCLEAR PLANT OPERATIONS.. APPENDIX E-2 (Continued)_ Effective Date: 01/01/83 - Name Energency location Emergency Plan Title Normal Business Phone
- Emergency Phone Emergency Evaluations 3.
L. F. Womack and' Recovery (continued) -] Coordinator e ] Emergency Radiological 1. J. V. Boots TSC Advisor J j g.. 2. W. A. O'Hara ~ .J
- 3. _H. W. C. Fong Corporate Security 1.
L. N. Shaffer heneral Office Coordinator ) 2. J. R. Van Schaick J 3. R. Dunleavy ] Site Security (On-duty Security Shift OSC Supervisor Supervisor ~ L _R. G. Todaro i L. J.G.Lunsford 3 a l P. D. Olsen J J . L. Harnes tL- ._ M.
- 1. Goo da l e
] Page 12 of 18
b i t PACIFIC GAS AND ELECTRIC COAWANY EMERGEleCY LOCATMNI p CORFORATE ERGERGENCY RESPONSE PLAN TODAY1 OATE -
- AGE EMERGENCY COMMUNICATIONS LOG SHEET
~ m em ta Tih4E MARSE ACTIVITY _W (2400 InsJ M 17) g EAAERGEldCY TITLE OR AFFILI ATION ggyptag 0 4 4 W e c e S O m 9 O 6 e 9 er O 9 6 e 9 m h e 8 en t I i e M O 4 9 9 I 9 09 404 18/82) %v.00 EEEIDETRUCT.OON OeREVER5E
, ). EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS Entry Number Instructions 1. Identify the emergency location witere this LogSheet is maintained during an emergehcy (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this Fonh is being used. Start a new Log Sheet each day, g 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 24,00 hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. / Che k the entry activity as to whether the individual called you or you are calling them. 7. c s e 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy /tranwnission. 9. Enter your initisls upo completion of each Log Sheet entry. ~ ( i. '. ~. J e
~ :.~ ^ 1 j PACIPIG GAS AND ELECTRIC COMPANY cG,.rv6 ATE EMERUENCY R-d5 PLAN s pods EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ] ( , SMERGEMCY LOCATION TOOAY'8 DATE fAus. j a 1 (1) (2) (3) TIME ENTERED BY (INITIALS) l (2400 h l (m
SUMMARY
OF ACTIVITY PERFORMED (m I k 3 \\ 1 I 1 I l l I l I 89406 (S/82) Rev. 00 SEE vismissui.e wome cW HEveruse,
r ~3 4 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES' LOG SHEET INSTRUCYlONS Entry Num'y Instructions 1. Identify the emergency location where this Log Sheetis maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a new Log Sheet ,each day. 3. Consecutively number each page used each day. I l 6 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. l l l S. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. l
-o. ~ ~^ ~' PACIFIC OAS AND ELECTRIC COMPANY Rev. 1 CORPORATE EMERGENCY RESPONSE PLAN 05/01/81 IMPLEMENTING TROCEDURE t ', a ^ PROCEDUR3'4.8 DIVISION SUPPORT APPENDIX E-1 EMERGENCY RESPONSE ORGANIZATION, DIVISION SUPPORT RELATIONSHIPS ancovnar MANAGER =q (sor) 1 l l l-CORPORATE PUBI.IC TEOOi! CAL AND INFCDATIoM IDGISTICAL ABCoVERY = coonoINAToa 1 MANAGER tezact I <cori 1 I .. _ l-.. I componATz coarenars conPonArt -J mATraIAt.s consTauctrou cIvzSrox. coomoruATom coonoINaton C" coonoINAton l (causmAL orrrer) (czac) (SAN t.UIS oBISPo) s I I t ,,g,,,n,,373, SITE, Coas? VAI.tzys a cxassTaucTIou DIVIstow m ImA m w ,, Q % "o,3 g (sAu Luzs ourseo) ("""=u orrrm orvrszons e i I L _ _ _ _ _ _ _ _ _ _ _ _ _.s._ _ _ _ _.J Eagend Line Authority
Coordination
-..- - Corporate Division Support Personnel EF - amargency Operations Facility CIRC - Corporate Incident Response Center ( Page 7 of 16 m,. w- ,m
m 7 o m ~ ~- ~ Rev. 1 05/01/81 ~ PACIFIC GAS AND ELECTRIC GOMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE (~. = PROCTOURE 4.8 s. DIVISION SUPPORT APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS NOTIFICATION LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Corporate 1. D. L. Kennady Division Los Padres District Coordinator Manager 2. B. McCloskev Los Padres District - Marketing Manager 3.- R. J. McKell Los Padres District Electric Superintendent 4. Alternate number - Morro Bay Switching Center ~ L l (, Page 8 of 16 i
~- Rev. 1 05/01/81. PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN (S , IMPLEMENTING PROCEDURE - ~ PROCEDURE 4.8 DIVTSTO~N SUPPORT' APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST '01/01[83 Effective Date: Name Errergency Location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager 1. J. D. Shiffer fE05 . _}, d, f t 2. R. C. Thornberry ~ J L. ' 3. _J. D. Townsend J Corporate Technical
- 1. _J. B. Hoch QIRC
"] and Logistical ] l-Coo rdinator L J 2 4 R. Tresler ) 3. R. A. Youna b ~ Public Information 1. D. J. Ravter EOF I Recovery Manager F j L 2. C. n Daterson [ j 3. S. N. Coffey l J Site Construction 1. R. D. Etzler (Si n e-~4~ renter ~ Coordinator 7 J l L
- 2. _N. M. Norem
_J e
- 3.,0. A. Rockwell J
L Page 9 of 16
.. ~, -m a' Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE s PROCEDURE 4.8 DIVISION SUPPORT APPENDIXE-3(Continujed EMERGENCY ORGANIZATION CONTRACT LIST _ Effect'ive Date: 01/01/'.,) Name Energency Location Emergency Plan Title Normal Business Phone Emergency Phone (General Office Transportation
- 1. " H. W. Klocke Coordinator
] 2. __G. Balanesi h ] s. 3. J. A. Marino ,j ~
- 4. _J. H. Ferrell
'A L s 5. R. L. Comyns s 6. A. R. Dashiell _J (; -i Page 10 of 16
,9 C o. ~ e E M S D N E l l. A NM V . ET E fE R f BD E e G O A a s t ec i E TC TA U D RT S Y W l A I D EE O a S T t N O ITAC O L Y i C N IGR EM n E ( s TE E H YT S IV N G IT A O C Y L NP L A A E S WS N R N )7 OO O 1 CP I S C T E IRR A T Y C N O C I C I E N N T LE 2 U A G I OR M L O NE M F AM F O A SEA E C R OT Y O CA E R C S L F ON T ICP E T I AR POG Y C R C E N E E M M G E A R N EM 0 E 0 i M ve R W ) 28 / sT 8 EM0 ( 0 4 I 4 8 2 4 g ( 98 } ' (!I i l!i' (1t ll ( 1
t i EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS Entry Number instructions 1. Identify the emergency location where this LogSheet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergermy Operations Facility, etc.) 2. Enter the date which this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each -fay. ~ 4. Enter the time for each Log entry.,Use the 2400 hour clock to avoid confusion. 5. Clearly record the name of the individual calling you or whom you are calling. e 6. Record the individuals PGandE Emergency Organization Title or their non PGandE affiliation. t Che k the entry activity as to whether the individual cdiled you or you are calling them. 7. c Enter the entire context of the message being communicated. Read back the message to the 8. individual to as.ure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. / / ,,/
- - ~
..f- ..~. -) g PACIPlc GAS ANO ELECTRIC COMPANY CORPORATE EMERGENCY RE5PONSE PLAN POe5 EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET ('s sMsRoaNCY LOCATION. TODAY'S DATE PAGE tu' tai tm TIME ENTERED BY (2iO0 lus.) (INITIALS) te im
SUMMARY
OF ACTIVITY PERFORMED to s eh C 9 a e G S I e e e ' s) ~ 3DM 18/82) Rev. 00 SEE me n hui.: rw== UN Hivues
~ ] m. ,EMERGENCT RESPONSE AND RECOVERY ACTIVITIE5 t.OG SHEET INSTRUCTIONS Entry Number instructions 1. Identify the emergency location where this Log Sheet is maintained during an emergency (i.e.: Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this forr.iis being used. Start a new Log Sheet each day. 3. Consecutively number eacE page used each day. 3 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Log Sheet entry. l I I ) l .-.,,e r- -s
. ~.. w Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY. CORPORATE EMERGENCY RESPONSE PLAN p , IMPLEMENTING PROCEDURE PROCCDURE 4.9 QUALITY ASSURAt(CE, APPENDIX E-2 EMERGENCY PLAN TITLES AND PERSONNEL ASSIGNMENTS t0TIFICAT10N LIST Effective Date: 01/01/83 Name Home Phone Emergency Plan title Nonemergency Title Business Phone '. A. Raymond Corporate Quality 1. W Assurhnce
- Manager, Coordinator Quality Assurance 2.
P. C. Burgess Records Management System Supervisor 3. T. G. de Uriarte Senior Quality Engineer Records Management 1. P.CTBurgess Coordinator Records Management ~ System Supervisor 2. E. S. Grenfell Records Analyst 3. H. M. Cox Records Supervisor 4. S. E. Earley-Iwert Records Analyst Senior Quality ~ 1. F. J. Dodd Enginder(Pro Senior Quality Development) gram Engineer Page 11 of 20
Rei. 1 ~ 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMEtiTIN
G. PROCEDURE
~ hUAL U CE APPENDIX E-2 (Continued) ~ Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone 5 Senior Quality 2. H. J. Hansen, Jr. Engineer (Program Quality Engineer Development) (continued) 3. G. W. Heggli Quality Engineer ~ Senior Quality 1. T. G. de Uriarte Engineer Senior Quality (Auditing) Eng tneer 2. K. T. Bergmann Quality Engineer 3. D. S. Aaron Quality Assurance Analyst Quality Assurance 1. R. T. Twiddy Supervisor Quality Assurance Supervisor 2. C. M. Seward, Jr. Quality Engineer 3. R. W. 'aylor Qualits Engineer ~ 4. M. S. Dobrzensky Quality Engineer g i l l l l l Page 12 of 20 l
'v-Rev. 1 05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE ( -s PROCEDURE 4.9 QUALITY ASSURANCE APPENDIX E-2 (Continued) Effective Date: 01/01/83 Name Home Phone Emergency Plan Title Nonemergency Title Business Phone Design-Dra f ting 1. H. E. Deady Records Engineering Records ' Coordinator Supervisor 2. D. W. Houghton Supervisor, Engineer. ing Rec,ords-& Admin-istrative Services 3. D. C. Bullard Administra tive Services Superviso'r s v Page 13 of 20
s' Rev. 1-05/01/81 PACIFIC GAS AND ELECTRIC COMPANY CORPORATE EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURE s PROCEDURE 4.9 QUALITY ASSURANCE APPENDIX E-3 EMERGENCY ORGANIZATION CONTACT LIST Effective Da,te: 01/01/83 Name Energency location Emergency Plan Title Normal Business Phone Emergency Phone Recovery Manager
- 1. J. D. Shiffer (E_OF
.] G -i L: 2. _R. C. T'hornberry b. f-- 3 ~
- 3. g D. To_wnsend
_3 w Corporate Technical
- 1.,J. R. Hoch gRC and Logistical
(, ) Coordinator 6 2. M. R. Tresler ar 6 ~ 3. R. A. Younc f) ~ 6 b
- u..
Page 14 of 20
T p (j e PACIFIC GAS ANO ELECTalC COe#ANY EMERGENCY LOCATION ym CORPORATE EMERGENCY RESPONSE PLAN TODAY'S DATE ' ACE EMERGENCY COMMUNICATIONS LOG SHEET to TimeE NAME ts is ACTWITY 12400BusJ l# BRENDM 179 g4 ERGERGENCY TITLE OR AFFILIATION s DSTM&SI i, O e S O w 4 8 G t s k 1 i ( l u : I - k li1 l l n. e e O sEE NsTRuCTNEss O e REvE'HER inoce4istaal Rev.oo n
j I O j EMERGENCY COMMUNICATIONS LOG SHEET INSTRUCTIONS ~ e Entry Number Instructions o 1. Identify the emergency location where this Log 5heet is maintained during an emergency (i.e.; Corporate incident Response Center, Materials Dept., Emergency Operations Facility, etc.) _ I 2. Enter the date wNch this Form is being used. Start a new Log Sheet each day. 3. Consecutively number each page used each day. 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid confusion. ~ l S. Clearly record the name of the individual calling you or whom you are calling. 6. Record the individuals PGandE Emergency Organization Title or their pon PGandE affiliation. 4 Che k the entry activity as to whether the individual balled you or you are calling them. 7. c 8. Enter the entire context of the message being communicated. Read back the message to the individual to assure correct copy / transmission. 9. Enter your initials upon completion of each Log Sheet entry. o e g j' W M-
4 ~,- o PAciricoAs Ano ELacTRic company CORPORATE EMERGENCY RESPONSE PLAN POwB EMERGENCY RESPONSB AND RECOVERY ACTIVITIES LOG SHEET (N-autRogmcv Location TooAv s oATE raos ~~ Its (2) tm ENTEREoBy TIME (2W hesJ (INITIALS: lai (si
SUMMARY
OF ACTIVITY PERFORMED con o 9 e e 49 S e o ,. CD405 (8/82: Rev.00 .y. -,ogIREVER50
EMERGENCY RESPONSE AND RECOVERY ACTIVITIES LOG SHEET INSTRUCTIONS ~~ Entry Number instructions 1. Identig the emergency location where this Log Sheet is maintained (furirigp'n emergency (i.e.: Corporate incident Response Center, ~ Materials Dept., Emergency Operations Facility, etc.) 2. Enter the date which this form is being used. Start a,'ew L:; Sheet each day. 3. Consecutively number eacfi page used each day. l 4. Enter the time for each Log entry. Use the 2400 hour clock to avoid ).. ~ . confus,on. i 5. Enter a summary of each activity being recorded. 6. Enter your initials upon completion of each Leg Sheet entry. r O r - -.}}