Forwards Application for Amends to Licenses NPF-2 & NPF-8, Reflecting Southern Nuclear Generating Co,Inc (Southern Nuclear) as Operator of Facilities.License NPF-2 & Environ Protection Plans Encl
ML20073K774
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/06/1991
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20073K776 List:
References
NUDOCS 9105130005
Download: ML20073K774 (3)


Text

. _ _ - - - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

.c

(,

  • i e

I.

L n e eAown

\\kib.inktlbwer May 6, 1991 Docket Nos. 50 348 50 364 U. S. Nuclear Regulatory Commission AT1N
Document Control Desk Washington, DC 20555 Joseph M. f arley Nuclear Plant License Amendments Application for Southern Nuclear To Become T 1e Licensed Operator Gentlemen:

Alabama Power Company, as holder of the licenses for the Joseph M. f arley Nuclear Plant (FNP), Units 1 and 2, hereby submits the enclosed application for amendment of facility Operating License Nos. NPf-2 and NPF-8 for FNP Units 1 and 2, respectively.

This application requests Nuclear Regulatory Commission approval for Southern Nuclear Operating Company, Inc. (Southern Nuclear) to become operator for FNP and to have exclusive responsibility and control over the physical construction, operation, and maintenance of the facility.

Alabama Power Company will continue to be the owner of the facility.

Alabama Power Company and Southern Nuclear are wholly owned subsidiaries of The Southern Company.

Southern Nuclear was formed in December 1990 for the purpose of consolidating into a single organization personnel within the Southern electric system engaged in nuclear operations, in order to achieve a higher degree of performance in multiple-unit nuclear operations.

The proposed license amendments involve no change in plant ownership or entitlement to electric power, and no significant change in nuclear personnel or support organizations.

When these amendments become effective, the on-site nuclear generation organization will be transferred intact to Southern Nuclear.

Pursuant to 10 CFR 50.4, the signed original of the Application to Amend facility Operating License Nos. NPF-2 and NPF 8 is enclosed and the appropriate copies will be distributed. Attachments A, B, C and D of this submittal are attachments to the Application.

Attachment A contains a signed certificate of concurrence from Southern Nuclear Operating Company providing Southern Nuclear concurrence in and support of the filing of this amendment by Alabama Power Company.

Attachment B contains the required significant hazards analysis pursuant to 10 CFR 50.92.

Based on the analysis provided, Alabama Power Company has determined that the proposed changes to the operating licenses (including 910913000", 9 K606

{

ppR p,Doct 050003 %

4 8 e

ms 1

U. S. Nuclear Regulatory Cutnission Page 2 May 6, 1991 Appendices A and B to the operating licenses) will not significantly increase the probability or consequences of an accident previously evaluated, create the possibility of a new or different kind of accident from any accident previously evaluated, or involve a significant reduction in a margin of safety. Accordingly, it hks been concluded that the proposed changes do not constitute a significant hazards consideration.

Attachment C contains the proposed changes to the operating licenses (including Appendices A and B to the operating licenses) necessary for Southern Nuclear to become the operator of FNP.

Attachment D contains the wording changes of proposed operating license changes previously requested by Alabama Power Company and currently before the NRC. As part of the issuance of this proposed amendment, the NRC is requested to consider these changes.

A copy of these proposed changes is being sent to Dr. C. E. Fox, the Alabama State Designee, in accordance with 10 CFR 50.91 (b)(1).

The Plant Operations Review Committee has reviewed and approved the proposed amendments and the Nuclear Operations Review Board will review these proposed changes at a future meeting.

Regulatory reviews and/or approvals in addition to that of the NRC are required before Southern Nuclear e.an become the licensed operator of FNP.

Alabama Power Company therefore requests that the Safety Evaluation Report be issued separately from the license amendments. Alabama Power Company requests that the Safety Evaluation Report be issued by September 1, 1991.

"abama Power Company will separately notify the NRC for issuance of tne license amendments at such time as all other requirements have been satisfied and Southern Nuclear is ready to become the licensed operator for the plant, it is anticipated that such notice will be given within thirty (30) days after the Safety Evaluation Report is issued.

Respectfully submitted, ALABAMA WER COMP NY

/

z3 hu ~ -

R. P. Mcdonald RPH/JMG/LPD Sworn to and subscribed before me Enclosure this [

day of_

Jt '1

, 1991.

'/

Notary Public

-_r__

U. S. Nuclear Regulatory Comission Page 3 May 6. 1991 cc: Mr. S. D. Ebneter Mr. S. T. Hoffman Mr. G. f. Maxwell

)