Text
.
l TECHNICAL SPEClflCATIONS CHANGES APPENDIX A TO THE OPERATING LICENSE NPF-2 Insertion Instructions Pace Revision 6-11 Replace 910s130007 910506 PDR ADOCK 05000348 p
FDR
ADMINISTRATIVE CONTROLS g.
Reports and meeting minutes of the PORC.
h.
Proposed changes to Technical Specifications or this Operating License.
1.
The safety evaluations for proposed 1) procedures 2) changes to procedures, equipment or systems and 3) test or experimente completed under the provision of Section 50.59 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
AUDITS 6.5.2.8 The following audits shall be conducted under the direction of the Manager - Safety Audit and Engineering Review:
l a.
The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months, b.
The performance, training and qualifications of the entire facility staff at least once per 12 months.
c.
The results of actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety at least once per 6 months, d.
The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B",10 CFR 50, at least once per 24 months.
e.
The Facility Emergency Program at least once per 12 months, f.
The Facility Security Plan at least once per l? months.
9 Any other area of facility operation considerec appropriate by the NORD or -the Vice President 4hiclear.
h.
The Facility Fire Protection Program and implementing procedures at least once per 24 months.
i.
An independent fire protection and loss prevention program inspection and audit of the unit at least once per 12 months utilizing either qualified offsite licensee personnel or an outsioe fire protection firm, j.
An inspection and audit of the unit fire protection and loss prevention program by a qualified outside fire consultant at least once per 36 months.
k.
The radiological effluent and environmental monitoring programs and the results thereof at least once per 12 months.
FARLEY-UNIT 1 6-11 AMENDMENT NO.
.=
4..
i TECHNICAL SPEClflCATIONS CHANGES APPENDlX A TO THE OPERATING LICENSE NPF-8 Insertion Instructions Eagg Revision 6-11 Replace
ADMINISTRATIVE CONTROLS g.
Reports and meeting minutes of the PORC.
h.'
Proposed changes to Technical Specifications or this Operating License.
i.
The safety evaluations for proposed 1) procedures 2) changes to procedures, equipment or systems and 3) test or experiments completed under the provision of Section 50.59 10 CFR, to verify that such actions did not constitute an unreviewed safety question.
AUDITS 1
6.5.2.8_ The following audits shall be conducted under the direction of the Manager - Safety Audit and Engineering Review:
l a.
The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months, b.
The performance, training and qualifications of the entire facility staff at least once per 12 months.
c.
The results of actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety at least once per 6 months, d.
The performance of activities required by the Operational Quality Assurance Program to meet the criteria of Appendix "B", 10 CFR 50, at least once per 24 months, e.
The Facility Emergency Program at least once per 12 months, f.
The Facility Security Plan at least once per 12 months.
g.
Any other area of facility operation considered appropriate by the NORB or the Vice President-Nuclear, h.
The Facility Fire Protection Program and. i:nplementing procedures at least once per 24 months.
i.
An independent fire protection and loss prevention program inspection and audit of the unit-at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.
j.
An inspection and audit of the unit fire protection and loss prevention program by a qualified outside fire consultant at least once per 36 months.
k.
The radiological effluent and envitonmental monitoring programs and the results thereof at least once per 12 months.
FARLEY-UNIT 2 6-11 AMENDMENT NO.
ENVIRONMENTAL PROTECTION PLAN CHANGES APPENDIX B TO THE OPERATING LICENSE NPF-2 l
Insertion Instructions Paaes Revision Cover Replace 1-1 Replace 4-3 Replace 4-3 Replace 5-1 Replace l
l i
APPENDIX B TO FACILITY LICENSE NO. NPF 2 JOSEPH M FARLEY NUCLEAR PLANT UNIT 1 SOUTHERN NUCLEAR OPERATING COMPANY DOCKET NO. 50 348 ENVIRONMENTAL PROTECTION PLAN
1.0 Objectives of the Environmental Protection Plan The Environmental Protection Plan (EFP) is to provide for protection of environ-mental values during construction and operation of the nuclear facility.
The principal objectives of the EPP are as follows:
(1)
Verify that the plant is operated in an environmentally acceptable manner, as established by the FES and other NRC environmental impact assessments.
(2)
Coordinate NRC requirements and maintain consistency with other Federal, State and local requirements for environmental protection.
(3)
Keep NRC informed of the environmental effects of facility construction and operation and of actions taken to control those effects.
Environmental concerns identified in the FES which relate to water quality matters are regulated by way of the NPDES permit.
1-1 1
j Changes and additions to the NPDES Permit or the State certification shall be reported to the NRC within 30 days following the date the change is approved.
If a permit or certification, in part or in its entirety, is appealed and i
stayed, the NRC shall be notified within 30 days following the date the stay is granted.
The NRC shall be notified of changes to the effective NPDES Fermit proposed by the permit holder by providing NRC with a copy of the proposed change at the same time it is submitted to the permitting agency. The notification of an g
initiated change shall include a copy of the requested revision submitted to the permitting agency.
The licensee shall provide the NRC a copy of the application for renewal of the NPDES permit at the same time the application is submitted to the permitting agency.
3.3 Changes Required for Compliance with Other Environmental Regulations L
Changes in plant design or operation and performance of tests or experiments which are required to achieve compliance with other Federal, State, or local environmental regulations are not subject to the requirements of Section 3.1.
3-3 l
Protection Agency and approved by State authorities and applied as directed by said authorities:
- 1) farley to Pickard South 230KV
- 11) Farley to Webb to Pickard 230XV iii) Farley to Snowdown 500KV Records shall be maintained concerning herbicide use..
.h js shall include the following information:
commercial an/ chemical names of
.+.erials used; concentration of active material in formulations diluted for field use; diluting substances other l-than water; rates of application; method and frequency of application; location; and the date of application.
Such records shall be maintained for a period of 5 years and be made readily available to the NRC upon request. There shall be no routine reporting requirement associated with this condition.
4.2.3 Land Management There-shall be a land management program instituted at the FNP to provide for revegetation of site areas impacted during construction as described in Section 5.2 of the FES OL. This program requires landscaping of certain areas around the plant buildings and the revegetation and management of the remainder of the site as a wildlife refuge. There shall be no reporting requirement associated with this condition.
4-3
5.0 Administrative Procedures 5.1 Review nd Audit Review and audit of compliance with the Environmental Protection Plan shall be provided. The audits shall be conducted independently of the individual or groups responsible for performing the specific activity.
A description of the organization structure utilized to achieve the independent review and audit function and results of the audit activities shall be maintained and made available for inspection.
5.2 Records Retention Records and logs relative to the environmental aspects of plant operation shall be made and retained in a manner convenient for review and inspection.
These records and logs shall be made available to NRC on request.
Records of modifications to plant structures, systems and componente determined to potentially affect the continued protection of the environment shall be retained for the life of the plant. All other records, data and logs relating to this EPP shall be retained for five years or, where applicable, in accordance with the requirements of other agencies.
5-1
9 ENVIRONMENTAL PROTECTION PLAN CHANGES APPENDIX B TO THE OPERATit'; LICENSE NPF-8 Insertion Instructions EiLqn Revision Cover Replace 1-1 Replace 3-3 Replace 4-3 Replace 5-1 Replace
l APPENDIX B TO FACILITY LICENSE NO.- NPF 8 JOSEPH M. FARLEY NUCLEAR PLANT l-UNIT 2 l
SOUTHERN NUCLEAR OPERATING COMPANY l
DOCKET NO. 50-364 l
ENVIRONMENTAL PROTECTION PLAN l
1.0 Objectives of the Environmental Protection Plan The Environmental Protection Plan (EPP) is to provide for protection of environ-mental values during construction and operation of the nuclear facility. The principal objectives of the EPP are as follows:
(1)
Verify that the plant is operated in an environmentally acceptable manner, 1
as established by the FES and other NRC environmental impact assessments.
(2)
Coordinate NRC requirements and maintain consistency with other federal, State and local requirements for environmental protection.
l (3)
Keep NRC informed of the environmental effects of facility construction and operation and of actions taken to control those effects.
Environmental concerns identified in the FES which relate to water quality matters are regulated by way of the NPDES permit.
l l-1
4 -
Changes and additions to the NPDES Permit or the State certification shall be
- reported to the NRC within 30 days following the date the change is pproved.
j If a permit or certification, in part or in its entirety, is appealed and stayed, the NRC shall be notified within 30 days following the date the stay is granted.
The NRC shall be notified of changes to the effective NPDES Permit proposed by
-the permit ho der by providing NRC with a copy of the proposed change at the same l
time it is submitted to the permitting agency.
The notification of an initiated change shall include a copy of the requested revision submitted to the permitting agency. The licensee shall_ provide the NRC a copy of the application for renewal of the NPDES permit at the same time the application is submitted to the permitting agency.
- 3.3 Changes Required for Compliance with Other Environmental Regulations Changes in plant design or operation and performance of tests or experiments which_ are required to achieve compliance with other Federal, State, or local environmental regulations are not subject to the requirements of Section 3.1.
33
5.0-Administrative Procedures 5.1 Review and Audit Review and audit of. compliance with the Environmental Protection Plan shall be provided. The audits shall be conducted independently-of the individual or groups responsible for performing the specific activity. A description of the organization structure utilized to achieve the independent review and audit function and results of the audit activities shall be maintained and made available for inspection.
5.2 Records Retention Records and logs relative to the environmental aspects of-plant operation shall be made and retained in a manner convenient for review and inspection.-
_l These records and logs shall be made -available to NRC on request.
t Records of modifications to plant structures, systems and components determined 1
to potentially affect the continued protection of the environment shall be retained for the' life af the plant. All other records, data and logs relating to this EPP shall br retained for five years or, where applicable, in accordance with-the requirements of other agencies.
p l.
5-1
i ATTACHMENT D l
REVISIONS TO OUTSTANDING LICENSE CHANGES l
Attachment D Revisions to Outstanding License Changes On the effective date of this proposed license amendment when Southern Nuclear becomes the licensed plant operator, the NRC should direct all correspondence related to Joseph M. farley Nuclear Plant, Units 1 and 2 to Southern Nuclear. This includes any NRC response to Alabama Power Company-correspondence, including operating license amendment requests, which were submitted earlier than and remain outstanding on the effective date.
In addition, current outstanding license change submittals associated with Joseph M. Farley Nuclear Plant, Units 1 and 2 have been reviewed.
It has been determined that one outstanding submittal has proposed wording revisions to the operating licenses which would change once Southern Nuclear-becomes the licensed p1 ant operator.
On February 26,1991-Alabama Power Company submitted proposed changes to the Joseph M. Farley Nuclear Plant, Units 1 and 2 operating licenses to incorporate the fire protection program approved by the NRC.
The current proposed wording of the change to Section 2.C.(4) of the operating licenses is as follows:
Fire Protection Proaram Alabama Power Company shall implement and maintain in effect all provisions of the approved fire protection program as described in the Final Safety Analysis Report for the facility and as approved in the Fire Protection SERs dated February 12, 1979, August 24, 1983, December.30, 1983, November 19, 1985, September 10, 1986 and December 29,-1986. Alabama Power Company may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown.
With Southern Nuclear the licensed plant operator, the wording of the above change should be revised as follows:
Fire Protection Proaram Southern Nuclear shall implement and maintain in effect all provisions of the approved fire protection program as described in
-the Final Safety. Analysis Report for the facility-and as approved in the Fire Protection SERs dated ~ February 12, 1979, August 24, 1983, December 30, 1983, November 19, 1985, September _ 10, 1986 and December 29,-1986.
Southern Nuclear may_make changes:to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown.
1
. -