Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000395/LER-1983-022, Forwards LER 83-022/03L-0.Detailed Event Analysis Encl + (ML20073C517)
- 05000395/LER-1983-024-03, /03L-0:on 830311,main Steam Line C Radiation Monitor Experienced Spurious Alarms.Caused by Slack Detector Cable Allowing Signal Oscillations.Detector Cable Will Be More Adequately Secured by 830501 + (ML20073C524)
- ML20073C527 + (ML20073C527)
- 05000328/LER-1983-033, Forwards LER 83-033/03L-0 + (ML20073C532)
- 05000395/LER-1983-022-03, /03L-0:on 830308,conduit Containing Smoke Detector Circuits Cut During Core Drilling for Plant Mod.Fire Watch Posted.Caused by Failure to See Conduit Embedded in Fireproofing Matl.Conduit & Cable Replaced + (ML20073C538)
- ML20073C548 + (ML20073C548)
- ML20073C550 + (ML20073C550)
- 05000395/LER-1983-023, Forwards LER 83-023/03L-0.Detailed Event Analysis Encl + (ML20073C558)
- 05000328/LER-1983-033-03, /03L-0:on 830307,containment Internal Pressure Limit of +.3 Psid Relative to Annulus Exceeded.Caused by Reopening of Annulus Vacuum Fan Exhaust Dampers.Containment Vent Performed + (ML20073C573)
- ML20073C581 + (ML20073C581)
- ML20073C590 + (ML20073C590)
- ML20073C591 + (ML20073C591)
- ML20073C594 + (ML20073C594)
- 05000395/LER-1983-023-03, /03L-0:on 830309,main Control Board Pressure Indicator for Reactor Bldg Pressure Channel 950 Failed Low. Caused by Intermittent Electronic Failure of Transmitter. Transmitter Replaced + (ML20073C597)
- ML20073C611 + (ML20073C611)
- ML20073C616 + (ML20073C616)
- ML20073C618 + (ML20073C618)
- ML20073C622 + (ML20073C622)
- ML20073C625 + (ML20073C625)
- ML20073C632 + (ML20073C632)
- U-602340, Forwards Rev 17 of Physical Security Plan.Rev Withheld (Ref 10CFR73.21(c)(2)) + (ML20073C634)
- PY-CEI-NRR-1811, Application for Amend to License NPF-58,revising Snubber Visual Insp Program Surveillance Intervals to Incorporate Generic Ltr 90-09 + (ML20073C638)
- ML20073C648 + (ML20073C648)
- 05000395/LER-1983-021, Forwards LER 83-021/03L-0.Detailed Event Analysis Encl + (ML20073C651)
- ML20073C656 + (ML20073C656)
- ML20073C658 + (ML20073C658)
- 05000395/LER-1983-021-03, /03L-0:on 830307,steam Generator Blowdown Monitor RM-L3 Failed Low,Reducing Number of Operable Channels. Caused by Moisture in Monitor Detector Due to Overhead Sample Valve O-ring Rupture.Detector Replaced + (ML20073C659)
- 1CAN048307, Responds to NRC Re 821216 Discovery of Two Inoperable Reactor Bldg Pressure Transmitters.Corrective Actions:Plugs Removed from Input Ports & Transmitters Recalibr.Civil Penalty Payment Encl + (ML20073C662)
- 05000259/LER-1983-016, Forwards LER 83-016/03L-0 + (ML20073C664)
- ML20073C667 + (ML20073C667)
- ML20073C670 + (ML20073C670)
- ML20073C672 + (ML20073C672)
- ML20073C673 + (ML20073C673)
- ML20073C674 + (ML20073C674)
- ML20073C684 + (ML20073C684)
- ML20073C686 + (ML20073C686)
- ML20073C690 + (ML20073C690)
- ML20073C692 + (ML20073C692)
- ML20073C693 + (ML20073C693)
- AECM-83-0223, RO 83-015/0:on 830311,during Special Insp of fire-rated Assemblies,Three Open Penetrations Identified.Caused by Const Error.Matl Nonconformance Repts 83-213,214 & 215 Issued to Initiate Corrective Action + (ML20073C706)
- BSEP-83-1116, Ro:On 830228,post-maint Testing of Fire Door 103 Revealed High Differential Air Pressure Across Door.Fire Watch Will Be in Effect Until Door Operable + (ML20073C707)
- ML20073C708 + (ML20073C708)
- ML20073C725 + (ML20073C725)
- ML20073C734 + (ML20073C734)
- ML20073C737 + (ML20073C737)
- 05000280/LER-1983-015, Forwards LER 83-015/03L-0 + (ML20073C742)
- ML20073C745 + (ML20073C745)
- ML20073C747 + (ML20073C747)
- ML20073C753 + (ML20073C753)
- ML20073C758 + (ML20073C758)
- ML20073C767 + (ML20073C767)