Monthly Operating Repts for Aug 1994 for Browns Ferry Nuclear Plant
ML20073C693
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/31/1994
From: Salas P, Tanya Smith
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9409260103
Download: ML20073C693 (13)


Text

e

~,

i

'~

Tennessee Valley Au ority Post Offee Box 2000. Decarut. A abama 3560'r l

i September 15, 1994 U.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter Of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 BROWNB FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF AUGUST 1994 In accordance with the requirements of BFN Units 1, 2,

and 3 Technical Specifications Section 6.9.1.3, TVA is submitting the Monthly Operating Report for the month of August 1994 in the enclosure.

If you have any questions, please telephone me at j

(205) 729-2636.

i Sincerely, J

Pedro'Salas Manager of Site Licensing Enclosure l

cc:

See page 2 230C43 ggv2RB68R M88&9 l{}b ' ({

4 U.S' Nuclear Regulatory Commission Page 2 September 15, 1994 Enclosure cc (Enclosure):

Mr. Mark S. Lesser, Section Chief U.S.

Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Frederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II Office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.

20555 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Jim Lang Director of Engineering and Operations Electric Power Research Institute P.

O.

Box 10412 Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 Regional Administrator U.S.

Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Fred Yost, Director of Research Utility Data Institute 1200 G Street, NW Washington, D.C.

20005-3802

Je.

,m 4

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2,

AND 3 NONTHLY OPERATING REPORT AUGUST 1994 l

)

i

-i i

I J

i

=-

i l

OPERATIONAL

SUMMARY

AUGUST 1994 i

BROWNS FERRY 1 Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 1 has been on administrative hold since June 1, 1985.

As a result, TVA considers that accrual..of' reporting hours is suspended since the unit has a maximum dependable capacity of 0 MW:>

Accordingly, TVA does not consider cumulative reporting periot hours for the period beginning June 1, 1985, when calculating the operating status variables.

BROWNS FERRY 2 Unit 2 operated continuously this month at a capacity factor-of 89.7 percent and generated 729,810 megawatt hours gross electrical power.

Unit 2 is continuing its coastdown toward the Cycle 7 refueling outage, currently scheduled to begin October 1, 1994.

On August 6, 1994, power was reduced to approximately 70 percent due to low TVA-wide system loading conditions.

TVA maintained Unit 2 at reduced power following the end of the low load conditions in preparation for a planned maintenance outage that began on August 8.

Unit 2 returned to full power operation on August'11.

Unit 2 operated at reduced power for slightly over five days.

BROWNS FERRY 3 Unit 3 remains shutdown on administrative hold to resolve various TVA and NRC concerns.

Unit 3 has been on administrative hold since June 1, 1985.

As a result, TVA considers that-accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe, Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.

)

1

1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-259 UNIT:

BROWNS FERRY 1 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 MONTH Auoust 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

4 0

19 0

5 0

20 0

6 0

21 0

7 0

22 0

8 0

23 0

9 0

24 0

10 0

25 0

l 11 0

26 0

12 0

27 0

13 0

28 0

I 14 0

29 0

15 0

30 0

31 0

==

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-260 UNIT: BROWNS FERRY 2 PREPARED BY:

T.

R.

Smith TELEPHONE:

f205) 729-2955 MONTH Auouet 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1033 16 1027 2

1026 17 1014 3

1021 18 1008 4

1021 19 1009 5

1014 20 1008 6

823 21 1010 7

701 22 1011 8

684 23 989 9

692 24 999 10 697 25 986 11 895 26 983 12 1032 27 981 13 1036 28 974 14 1022 29 971 15 1022 30 967 31 963

m.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:

50-296 UNIT: BROWNS FERRY 3 PREPARED BY T.

R. Smith TELEPHONE:

(205) 729-2955 MONTH Aucust 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

16 0

2 0

17 0

3 0

18 0

-4 0

19 0

5 0

20 0

6 0

21 0

7 0

22 0

8 0

23 0

9 0

24 0

10 0

25 0

11 0

26 0

12 0

27 0

?

13 0

28 0

14 0

29 0

15 0

30 0

31 0

l t

i

~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-259 REPORT MONTH:

Au_qu st 1994 UNIT:

BROWNS FERRY 1 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 l

Method of License Duration Shutting Event System Copponent Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason' Down Reactor' Report No.

Code

  • Code
  • Recurrence 1

06/01/85 S

744 F

4 Adninistrative hold to resolve various TVA and NRC concerns.

'F-Forced

'A-Equipment Failure (Explain)

' Method:

  • Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Adninistrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-260 REPORT MONTH:

Aucust 1994 UNIT:

BROWNS FERRY 2 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2935 Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.

Date Type' (Nours)

Reason' Down Reactor' Report No.

Code' Code' Recurrence 2

8/6/94 S

41.5 H

5 N/A N/A N/A Power reduction dJe to TVA-wide low load conditions.

3 8/8/94 S

86.5 B

5 N/A N/A N/A Power reduction to perform various maintenance tasks on condenser waterboxes, feedwater purps, moisture separator drain pumps, etc.

'F-Forced

'A-Equipment Failure (Explain)

' Method:

' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Adninistrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

o.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

50-296 REPORT MONTH:

Aucust 1994 UNIT:

BROWNS FERRY 3 PREPARED BY:

T.

R.

Smith TELEPHONE:

(205) 729-2955 Method of License Duration Shutting Event System Component Cause and Corrective Action to Prevent No.

Date Type' (Hours)

Reason' Down Reactor' Report No.

Code' Code' Recurrence 1

06/01/85 S

744 F

4 Adninistrative hold to resolve various TVA and NRC concerns.

4

'F-Forced

'A-Equipment Failure (Explain)

' Method:

' Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)

C-Refueling 2-Manual Scram D-Regulatory Restriction 3-Automatic Scram E-Operator Training and License Examination 4-Continuation of Existing Outage F-Adninistrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

OPERATING DATA REPORT DOCKET:

50-259 UNIT:

BROWNS FERRY 1 PREPARED BY:

T.

R.

SMITH TELEPHONE:

(205) 729-2955 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 1
2. Reporting Period: AUGUST 1994
3. Licensed Thermal Power (MWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable capacity (Gross MWe):

0

7. Maximum Dependable Capacity (Net MWe): 0 8.

If Changes Occur in capacity R691ngs (Items Number 3 Through 7) Since Last Report, Give Reason:

N/A 9.

Power Level To Which Restricted, If Any (Net MWe):

0

10. Reason For Restrictions, If Any: Administrative Hold THIS MONTH YEAR TO DATE CUMULATIVE
  • 11 Hours in Reporting Period 0

0 95743

12. Hours Reactor Was Critical 0

0 59521

13. Reactor Reserve Shutdown Hours 0

0 6997

)

14. Hours Generator On Line 0

0 56267

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Generation (MWh) 0 0

168066787

17. Gross Electrical Generation (MWh) 0 0

55398130

18. Net Electrical Generation (MWh) 0 0

53796427

19. Unit Service Factor 0

0 60.9

20. Unit Availability Factor 0

0 60.9

21. Unit Capacity Factor (MDC Net) 0 0

52.8

~

22. Unit Capacity Factor (DER net) 0 0

52.8

23. Unit Forced Outage Rate 0

0 25.6

24. Shutdowns Scheduled Cver Next 6 Months (Type, Date, and Duration of Each):

N/A

25. If Shut Down At End Of Reporting Period, j

Estimated Date of Startup To be determined Excludes hours under administrative hold (June 1, 1985 to present) 1

OPERATING DATA REPORT DOCKET:

50-260 UNIT:

BROWNS FERRY 2 PREPARED BY:

T.

R.

SMITH TELEPHONE:

(205) 729-2955 OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 2
2. Reporting Period: AUGUST 1994
3. Licensed Thermal Power (HWt):

3293

4. Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable Capacity (Gross MWe):

1098.4

7. Maximum Dependable Capacity (Net MWe):

1065 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason: N/A

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reason For Restrictions, If Any: N/A THIS HONTH YEAR TO DATE CUMULATIVE *
11. Hours in Reporting Period 744 5831 119142
12. Hours Reactor Was critical 744 5696 80513
13. Reactor Reserve Shutdown Hours 0

0 14200

14. Hours Generator On Line 744 5685 78310
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Generation (MWh) 2263301 18312016 226859617
17. Gross Electrical Genaration (MWh) 729810 6121270 75329188
18. Net Electrical Generation (MWh) 710819 5974658 73219320
19. Unit Service Factor 100.0 97.5 65.7
20. Unit Availability Factor 100.0 97.5 65.7
21. Unit Capacity Factor (MDC Net) 89.7 96.2 57.7
22. Unit Capacity Factor (DER net) 89.7 96.2 57.7
23. Unit Forced Outage Rate 0.0 2.5 17.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): Cycle 7 refueling outage scheduled to begin October 1, 1994, and scheduled for approximately 45 days.
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup:

N/A Excludes hours under administrative hold (June 1, 1985 to May 24, 1991) l l

i l

s.

OPERATING DATA REPORT DOCKET:

50-296 UNIT:

BROWNS FERRY 3 PREPARED BY:

T,..R.

SMITH TELEPHONE:

(205) 729-2955

-OPERATING STATUS

1. Unit Names BROWNS FERRY UNIT 3
2. Reporting Period: AUGUST 1994
3. Licensed Thermal Power (MWt):

3293 4.

Nameplate Rating (Gross MWe):

1152

5. Design Electrical Rating (Net MWe):

1065

6. Maximum Dependable capacity (Gross MWe): 0
7. Maximum Dependable Capacity (Net MWe):

0 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason:

N/A

9. Power Level To Which Restricted, If Any (Net MWe):

0

10. Reason For Restrictions, If Any: Administrative Hold THIS MONTH YEAR TO DATE CUMULATIVE *
11. Hours in Reporting Period 0

0 73055

12. Hours Reactor Was Critical 0

0 45306

13. Reactor Reserve Shutdown Hours 0

0 5150

14. Hours Generator On Line 0

0 44195

15. Unit Reserve Shutdown Hours 0

0 0

16. Cross Thermal Generation (MWh) 0 0

131868267

17. Gross Electrical Generation (MWh) 0 0

43473760

18. Net Electrical Generation (MWh) 0 0

42114009

19. Unit Service Factor 0

0 60.5

20. Unit Availability Factor 0

0 60.5

21. Unit capacity Factor (MDC Net) 0 0

54.2

22. Unit Capacity Factor (DER net) 0 0

54.2

23. Unit Forced Outage Rate 0

0 21.6

24. Shutdowns Scheduled over Next 6 Months (Type, Date, and Duration of Each): N/A
25. If Shut Down At End Of Reporting Period, Estimated Date of Startup:

To be determined Excludes hours under administrative hold (June 1, 1985 to present)

.