MONTHYEARML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20128G1661996-10-0303 October 1996 Summarizes 960924 Meeting W/Gpu Nuclear Corp in Rockville,Md Re Preliminary Responses to Staff RAI Concerning Request to Change EALs for TMI-1.List of Participants & Copy of Preliminary Response to RAI Encl 1999-09-29
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217C5311999-10-0808 October 1999 Notification of 991027 Meeting with Representatives of Gpu in Rockville,Md to Discuss Recent Control Rod Surveillance Performance Issues at TMI-1.Proprietary Portions of Meeting Will Be Closed to Public ML20217F0841999-10-0808 October 1999 Informs That During 466th Meeting of ACRS on 990930-1002, CEOG Proposal to Eliminate PASS from Plant Design & Licensing Bases for CEOG Plants,Were Reviewed.Discussion & Recommendations,Listed ML20212K8901999-10-0505 October 1999 Notification of 991027 Meeting with Util in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TM1-1 ML20216J0151999-09-29029 September 1999 Notification of 991020 Meeting in Forked River,Nj to Discuss Licensee 990922,response to NRC & Other Info Addressing Sale of Portion of Land That Is Part of Plant Site ML20216G3671999-09-10010 September 1999 Forwards CNWRA Program Manager Periodic Rept (Pmpr) for Period 990731-0827 ML20210U7571999-08-20020 August 1999 Forwards Info Received from Gpu Nuclear,Inc on 990820 in Preparation for 990823.Requests Info Be Docketed ML20210C9991999-07-22022 July 1999 Revised Notification of 990813 Meeting with Gpu Nuclear,Inc Rockville,Maryland to Discuss TMI-1 Licensing Action Status. Meeting Date Changed ML20210E9511999-07-12012 July 1999 Notification of 990805 Meeting with Representative of Gpu Nuclear,Inc in Rockville,Md Re Plant,Unit 1 Licensing Action Status ML20212H9621999-06-23023 June 1999 Revised Notification of Meeting with Gpu Nuclear,Inc to Discuss Proposed Mods to RBS Sys Procedures & HPI Cross Connect Lineup.Meeting Rescheduled to 10 A.M. on 990713 ML20195H8521999-06-18018 June 1999 Requests That Encl Questions,Faxed to Gpu Nuclear,Inc on 990616,be Docketed,In Preparation for Forthcoming Conference Call Re TS Change Request 248, Remote Shutdown Sys, ML20195H9911999-06-15015 June 1999 Notification of 990707 Meeting with Util to Discuss Licensee Proposed Mods to Reactor Bldg Spray Procedures & High Pressure Injection Cross Connection Lineup ML20206F2921999-05-0505 May 1999 Forwards Draft Questions Which Were Faxed to Licensee for TMI Unit 1,GPUN on 990505 in Preparation for 990506 Conference Call on TS Change Request 279 ML20206D1291999-04-28028 April 1999 Notification of 990507 Meeting with Gpu Nuclear,Inc in Rockville,Maryland to Discuss Three Mile Island,Unit 1 Licensing Action Status ML20205N3161999-04-0909 April 1999 Notification of Significant Licensee Meeting 99-19 with Util on 990423 to Discuss Emergency Feedwater Flow Discrepancies ML20203E0321999-02-11011 February 1999 Staff Requirements Memo Re 990211 Affirmation Session in Rockville,Md (Open to Public Attendance) Re Secys 99-044 & 99-045 ML20197G6381998-12-0707 December 1998 Forwards Program Manager Period Rept (Pmpr) for Period 981024-1120 ML20196E2801998-11-30030 November 1998 Discusses Closeout of TAC MA1607 Re Cross Potential for common-cause High Pressure Injection Pump Failure IR 05000289/19983011998-11-0404 November 1998 Forwards NRC Operator Licensing Exam Rept 50-289/98-301 with as Given Written Exam for Tests Administered on 980824-27 at Facility ML20154G3451998-10-0101 October 1998 Rev 2 to Notification of Significant Licensee Meeting 97-73 on 981023 in King of Prussia,Pa to Discuss Actions Taken Re Engineering Corrective Action Performance Assessment Team Findings ML20153D9681998-09-24024 September 1998 Notification of 981006 Meeting W/Gpu Nuclear,Inc in Rockville,Md to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20237E8381998-08-28028 August 1998 Notification of 980917 Meeting W/Gpu Nuclear,Inc & Amergen in Rockville,Md to Discuss Sale & Transfer of TMI-1 from Gpu Nuclear,Inc to Amergen ML20237E4591998-08-20020 August 1998 Submits Rev 1 to Notification of Significant Licensee Meeting 98-73 W/Util in Middletown,Pa to Discuss Actions Taken Re Engineering Corrective Action PA Team Findings. Meeting Postponed ML20237C9401998-08-14014 August 1998 Notification of Significant Licensee Meeting 98-73 on 980828 W/Gpu Nuclear,Inc in Middletown,Pa to Discuss Actions Taken Re Engineering C/A Performance Assessment Team Findings ML20248H7001998-05-20020 May 1998 Staff Requirements Memo Re SECY-98-071,exemption to 10CFR72.102(f)(1) Seismic Design Requirement for TMI-2 ISFSI ML20247M2191998-05-19019 May 1998 Notification of 980604 Meeting W/Gpu Nuclear Inc in Royalton,Pa to Discuss Status of Licensing Actions Proposed & Currently Under Review by NRC for TMI-1 ML20216B6871998-05-0808 May 1998 Notification of 980527 Meeting W/Representative of Gpu Nuclear,Inc in Rockville,Md to Discuss Licensee 980324 Submittal Re Control Room Habitability at TMI-1 IR 05000289/19980991998-02-26026 February 1998 Notification of Significant Licensee Meeting 98-22 W/Util on 980318 to Discuss SALP for Period Covering 960805-980124,as Documented in SALP Rept 50-289/98-99 ML20154B7931998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 IA-98-345, Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 11998-02-0606 February 1998 Discusses Licensing Basis for Letdown Line Break Outside Containment for Plant,Unit 1 ML20199H6701997-11-20020 November 1997 Notifies of 971212 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability at Unit 1 ML20199E7071997-11-14014 November 1997 Revised Notification of 971119 Meeting W/Gpu Nuclear Corp,In Rockville,Md to Discuss Control Room Habitability at TMI-1 Nuclear Facility.Meeting Cancelled Until Further Notice ML20199B3111997-11-0606 November 1997 Notifies of 971119 Meeting W/Gpu in Rockville,Md to Discuss Control Room Habitability ML20212G9531997-11-0505 November 1997 Forwards Gpu SE Re Review of AP600 Shutdowm Ts.Section B.3.9.4 of STS Cites Gpu Nuclear SE 0002000-001 Rev 0,880520 as Ref E Temporary Containment Penetration Closure Devices Equivalent to Valve or Blind Flange ML20216E9871997-09-0808 September 1997 Notification of 970910 Meeting W/Util in Rockville,Md to Discuss Potential Dose Consequences from Postulated Steam Line Break & Postulated Accident Sys Leakage Limits ML20149D8881997-07-11011 July 1997 Notification of Significant Licensee Meeting 97-86 W/Util on 970725 in King of Prussia,Pa to Discuss Apparent Violations Re Failure to Recognize General Emergency Condition During 970305 Exercise ML20140G6231997-06-0505 June 1997 Notification of 970716 Meeting W/Gpun in King of Prussia, Pennsylvania for Presentation & Discussion Re Root Cause Determination for Recent QC Issues Performed by Gpun Per NRC CAL ML20151U4191997-05-23023 May 1997 Discusses Review of Two Addl Concerns Identified in 970407 Memo to Recipient from Special Insp Branch Re Addl Open Items Associated W/Dec 1996 Design Insp Rept 50-289/96-201 ML20148D9851997-05-21021 May 1997 Notification of Significant Licensee Meeting 97-57 W/Util on 970528 to Discuss Formal Exit Meeting for Licensee Remedial Emergency Preparedness Exercise on 970513 & Licensee Discussion Re NRC CAL ML20141E5381997-05-15015 May 1997 Notification of 970530 Meeting W/Representatives of Gpu Nuclear Corp in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 ML20138D3161997-04-21021 April 1997 Notification of Significant Licensee Meeting 97-47 W/Util on 970430 to Discuss Root Cause Analysis of 970305 Emergency Preparedness Drill Weaknesses ML20140D5251997-04-18018 April 1997 Notification of 970502 Meeting W/Util in Rockville,Md to Discuss Schedules & Resolution of Issues Relating to Thermo-Lag Fire Barriers ML20135F8801997-03-0404 March 1997 Notification of Significant Licensee Meeting 97-27 W/Util on 970317 to Discuss Emergency Preparedness Insp Exit Meeting ML20138M3111997-02-20020 February 1997 Notification of 970306 Meeting W/Gpu in Rockville,Md to Discuss Three Mile Island,Unit 1 Reactor Pressure Vessel pressure-temp Limit Curves ML20147D8391997-02-12012 February 1997 Notification of 970220 Meeting W/Util Representatives in Rockville,Md to Discuss Status of Licensing Activities Associated W/Plant,Unit 1 Facility ML20133Q3031997-01-16016 January 1997 Notification of Significant Licensee Meeting 97-08 W/Util on 970131 in Middletown,Pa Re Safety Sys Functional Insp Exit Meeting ML20149M0471996-12-10010 December 1996 Forwards Internet Mail Received from PM Blanch ML20129K3731996-11-21021 November 1996 Notification of 961126 Meeting W/Gpun in North Bethesda,Md to Discuss TMI-1 SG Issues ML20135B0871996-11-15015 November 1996 Notification of Significant Licensee Meeting 96-118 W/Util on 961122 to Discuss Plant Motor Operated Valve Testing Program self-assessment ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20136E3011996-10-31031 October 1996 Forwards Schedule for Activities at Plant for Next Few Months 1999-09-29
[Table view] |
Text
_ _
a
,e ,
GPU Nuclear Corporation Nuclear ;;;,o=*
Midoletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Numoer:
(717) 948-8005 January 21, 1994 C311-94-2010 Mr. T. T. Martin Regional Administrator, Region 1 US Nuclear Regulatory Comission '
475 Allendale Road King of Prussia, PA 19406-1415
Dear Sir:
Three Mile Island Station Unit 1 (TMI-1)
Operating License No. OPR-50 Docket No. 50-289 Request for a Regional Temporary Waiver of Compliance On January 20,1994, at 11:00 a.m., GPU Nuclear orally requested a regional ,
temporary waiver of compliance from the requirement to conduct the Control Rod Movement surveillance test. At 12:55 p.m. on January 20, 1994, Ms. Michele Evans, TMI Senior Resident Inspector, informed Mr. Jack Wetmore, Manager, TMI Licensing,'that the request had been granted. This letter is a. followup to GPU Nuclear's oral request for a regional temporary waiver of' compliance.
The Control Rod Movement surveillance test is a requirement of TMI-1 Technical SHicification 4.1.2 (Table 4.1-2). The current due date for the surveillance is T sursday, January 20,1994 and the late date for the surveillance (the allowable surveillance frequency of 14 days plus 25%) will be Sunday, January 23, 1994.
GPU Nuclear requested a waiver of compliance be effective iemediately until January 28, 1994. GPU Nuclear intends to perform the surveillance on or before January 28, 1994.
The temporary waiver of compliance was requested to minimize the possibility of a reactor power reduction or trip as a consequence of surveillance testing that is required to be performed during the extremely cold weather which the PJM grid is currently experiencing. TMI-1 has previously experienced a reactor power ,
reduction due to an inadvertent rod drop that occurred during the performance of the htweekly control rod movement surveillance that was the result of a faulty cable / stator electrical connection (December 12,1991). Note: The inadvertent rod drop did not affect the ability of .the Control Rod Drive Mechanisms to perform their safety function.
9409260130 940121-
{DR ADOCK 05000289 PDR 230C45 i y
'n ' lg GPU Nuclear Corporation is a subeldlary of the General Public Utilities Corporation'
c
.o C311-94-2010 Page 2 <
The requested duration for the waiver of compliance will allow GPU Nuclear to postpone the performance of the Control Rod Movement surveillance testing until the extremely cold weather has abated and the PJM grid is restored to normal conditions (no voltage reductions or blackouts). .
The Commonwealth of Pennsylvania has declared a state of emergency in response ;
to the current unprecedented extremely cold weather. The PJN grid is currently undergoing mandatory voltage reductions and rolling blackouts. It is in the public interest to minimize all activities that could jeopardize current electrical production.
The safety significance of postponing the performance of the surveillance until January 28, 1994 is minimal. The biweekly surveillance interval stated in current TMI-1 Technical Specifications is very conservative when compared to the 92 day surveillance interval specified in NUREG 1430, Revised Standard Technical ,
Specifications (RSTS) for BW Plants. The intent of the surveillance is to ,
ensure control rod movement, trippability and the reliability of the control rod mechanisms. The control rod mechanism movement surveillance has been -
i successfully performed in accordance with the surveillance interval since the i
plant returned to power after the 10 R outage. The reliability of the control rod mechanism can be assured during the period for which the temporary waiver of '
compliance has been requested by monitoring other available indicators of control I rod performance that are obtained from other Technical Specification recuired '
surveillance activities and from plant instrumentation such as the asyneetr' c rod '
position indicator alare.
We note that RSTS for BW Plants specifies a 92 day surveillance frequency for !
i the performance of verifying control rod freedom of movement (SR 3.1.4.2, page 3.1-9) ver. sus the 14 day surveillance interval in the TMI-1 Technical ,
specifications. The Bases for the RSTS 3.1.4.2 (page 3.1-26) states the bases ;
~
for the g2 day surveillance interval takes into consideration other information available to the operator in the control room and the RSTS requirement for ,
verification that individual control rod positions are within 6.5% of their group :
average be performed every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> with the reactor at power. Along this same !
line, TMI-1 Technical Specification 4.1-1.23,24 requires verification of control j rod absolute / relative position comparison be performed on a shiftly (once every ;
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) surveillance interval with the plant critical. This requirement is :
implemented by GPU Nuclear via TMI-1 Surveillance Procedure 1301-1.
The requested temporary waiver of compliance does not involve a significant ;
hazards consideration because: ;
- 1. There is no significant increase in the probability or consequences of an accident previously evaluated because control rod mechanism l i
operability is verifiable via other available information' and Technical Specification required surveillance and because the !
sacified duration of the temporary waiver of compliance is much less t tinn the 92 day surveillance i.nterval that would be allowed under ;
NUREG 1430. .
i r
C311-94-2010 Page 3
- 2. It will not create the possibility of a r:ew or different kind of i accident from any accident previously evaluated. A one-time change in the frequency in the performance of the control rod movement surveillance does not change plant operations or have any impact en .
l plant systems, structures or components, and I
- 3. It does not involve a significant reduction in a margin of safety.
The frequency of Technical Specification surveillance is not a specified margin of safety in TMI-1 Technical Specifications. ,
i The temporary waiver of compliance will not involve irreversible environmental consequences because the extension of the surveillance interval has no impact on plant operations or plant effluents. l The TMI-1 Plant Review Group reviewed and approved the action to request a temporary waiver of compliance from the specifded 14 day frequency requirement for the control rod movement survalliance on Wednesday, January 19, 1994, t
- GPU Nuclear appreciates the prompt NRC review and approval of the temporary l
waiver of compliance. If you have any questions regarding this matter, please contact Mr. John Schork, TMI Licensing Engineer at (717) M S-8432. l Sincerely, T. G. Broughton Vice President & Director, TMI
~
JSS/enf cc: M. G. Evans - TM1 Senior Resident Inspector R. W. Hernan . Senior Project Manager Document Control Desk i