Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-90-0982, Forwards Response to Generic Ltr 90-06, PORV & Block Valve Reliability;Addl Low Temp Overpressure Protection for Lwrs. Both PORV & Block Valves Tested in Inservice Test Program + (ML20065S933)
- ML20065S935 + (ML20065S935)
- LIC-90-0983, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-38.Corrective Actions:Hydrostatic Pressure Test Will Be Performed on Applicable Sections of Piping During 1991 Refueling Outage to Establish Pressure of 395 Psig + (ML20065S937)
- 05000440/LER-1990-034, :on 901125,discovered That Reactor Pressure Vessel Water Level Instrumentation Equalizing Valve Mispositioned.Caused by Personnel Error.Equalizing Valve Closed & Walkdown Performed + (ML20065S939)
- 05000311/LER-1982-116, Forwards LER 82-116/03L-0.Detailed Event Analysis Encl + (ML20065S946)
- RBG-13-164, Responds to NRC Re Violations Noted in IE Insp Rept 50-458/82-03.Corrective Actions:Review of All Warehouse Records Performed to Determine If Other Equipment Requiring Maint Had Gone Undetected + (ML20065S959)
- 05000311/LER-1982-116-03, /03L-0:on 820927 & 28,RCS Subcooling Margin Monitor Failed.Caused by Malfunction of Computer Logic Board in Process Computer & Previous Repair of Computer, Respectively.Logic Board Replaced & Point Reset + (ML20065S963)
- 0CAN098202, Summarizes 820908 Telcon Re IE Bulletin 82-01,Revision 1, Suppl 1.Bulletin Requires Radiograph Sets of Welds Associated W/Pipe Walls Less than 1/2 Inch & Applies Only to Unit 2 + (ML20065S970)
- ML20065S971 + (ML20065S971)
- ML20065S973 + (ML20065S973)
- ML20065S974 + (ML20065S974)
- ML20065S977 + (ML20065S977)
- 05000416/LER-1990-025, :on 901122,actuation of Reactor Protection Sys Occurred During Surveillance of Reactor Mode Switch.Caused by Diminishing Power Supply of Test Equipment.Evaluation Will Be Conducted + (ML20065S980)
- 05000311/LER-1982-107, Forwards LER 82-107/03L-0.Detailed Event Analysis Encl + (ML20065S981)
- 05000311/LER-1982-110, Forwards LER 82-110/03L-0.Detailed Event Analysis Encl + (ML20065S985)
- 05000311/LER-1982-107-03, /03L-0:on 820923,axial Flux Distribution Went Out of Target Band Due to Turbine Load Reduction When Turbine Generator Stator Water Temp Increased.Temp Increase Caused by Clogged Ports on Valve Positioner 2ST1 + (ML20065S987)
- 05000318/LER-1981-017, Forwards LER 81-017/03L-0 + (ML20065S990)
- 05000282/LER-1990-017-01, :on 901121,discovered That Bus Duct Cooling Fan 11 Not Running & Supply Breaker Tripped,Resulting in Main Generator,Turbine & Reactor Trip.Caused by Inadequate Design.Supply Breaker Replaced + (ML20065S992)
- 0CAN038201, Forwards Decription of Design Changes Which Required Safety Evaluation & Were Completed in 1981 + (ML20065S996)
- 05000318/LER-1981-017-03, /03L-0:on 810414,drain Line Accidentally Broken from Emergency Discharge of ECCS Pump Room Cooler 22.Caused by Dropped Tool Breaking Plastic Nipple.Scaffolding Checked to Ensure Required Toe Boards + (ML20065T001)
- 2CAN098207, Provides Summary Evaluation of Design & Performance of Core During Cycle 3 Operation at 100% Rated Core Power. No Unreviewed Safety Questions Exist + (ML20065T004)
- ML20065T008 + (ML20065T008)
- ML20065T009 + (ML20065T009)
- 05000311/LER-1982-110-03, /03L-0:on 820926,no Indication of Seal Interspace Air Pressure Found on Containment Air Lock.Air Lock Also Failed Seal Leakage Test.Caused by Loose Pivot on Air Interlock Linkage.Leakage Caused by Failure of Seal Joint + (ML20065T011)
- ML20065T012 + (ML20065T012)
- PM-80-109, Forwards Monthly Operating Rept for Oct 1980 + (ML20065T013)
- 0CAN098214, Summarizes Interim Actions Taken by Util in Response to IE Bulletin 80-06.Development of Procedures & Guidelines Supporting Regulatory Response Program Being Expedited + (ML20065T017)
- ML20065T018 + (ML20065T018)
- ML20065T020 + (ML20065T020)
- ML20065T032 + (ML20065T032)
- 0CAN098210, Suppl 820802 Response to IE Bulletin 82-02, Degradation of Threaded Fasteners in RCPB of PWR Plants. Bolted Closure Leaks Not Complete.Results of Review Will Be Provided by 821108 + (ML20065T037)
- ML20065T039 + (ML20065T039)
- LIC-90-0980, Forwards Public Version of Epips,Including Rev 1 to FC-EPF-9, OSC 24-H Staffing Schedure, Rev 1 to FC-EPF-10, TSC & Control Room 24-H Staffing Schedule & Rev 1 to FC-EPF-14, Emergency Response.... W/901217 Release Memo + (ML20065T041)
- 0CAN088205, Advises That Revision 1 to Contingency Plan Procedure 9 Not Completed.Delay Due to Incorporation of NRC Recommendations Re Inclusion of Agreements of Addl Offsite Support Agencies.Revision Expected by 820917 + (ML20065T042)
- ML20065T047 + (ML20065T047)
- PLA-1290, Forwards Monthly Operating Rept for Aug 1982 + (ML20065T049)
- ML20065T058 + (ML20065T058)
- HL-1397, Forwards Response to IE Bulletin 79-14, Seismic Analysis for As-Built,Safety-Related Piping Sys. Summary Rept Encl + (ML20065T059)
- B13693, Clarifies 900226 Proposed Rev to Tech Spec 3/4.6 to Permit Containment Pressure to Increase to 14.0 Psia During Modes 1 Through 4 to Reduce Potential for Personal Injury When Entering Containment + (ML20065T060)
- 05000483/LER-1990-016, :on 901124,reactor Trip Occurred on Low Steam Generator Level Which Resulted from Turbine Trip on Spurious Moisture Separator Reheater High Level Signal.Caused by Vibration.Level Switch Inverted + (ML20065T062)
- 05000281/LER-1990-005-03, :on 901120,rod Control Cluster Assembly M-12 Declared Inoperable Due to Mismatch Between Group & Rod Position Indication.Caused by Control Rod Positioned Two Steps from Bottom of Core + (ML20065T064)
- ML20065T066 + (ML20065T066)
- BECO-90-158, Responds to Suppl 3 to Generic Ltr 89-10, Consideration of Results of NRC-Sponsored Tests on Motor-Operated Valves. Subj Valves in Hpci,Rcic & RWCU Sys Capable of Providing Containment Isolation in Event of Line Break + (ML20065T067)
- 05000254/LER-1990-031, :on 901120,while Performing HPCI Turbine Area Temp Isolation Calibr,Setpoints of All Four Temp Switches Higher than Tech Spec Limits.Cause Not Determined.Switches Will Be Replaced & Calibr + (ML20065T069)
- NRC-90-0168, Forwards Response to Violations Noted in Insp Rept 50-341/90-13.Corrective Actions:Esf Status Checklist Now Performed Jointly by Off Going & Oncoming Control Room Nuclear Supervising Operator + (ML20065T073)
- ML20065T074 + (ML20065T074)
- ELV-02344, Forwards Results of Analysis of Liquid Samples Spiked W/ Radionuclides Sent to Lab,Per NRC Confirmatory Measurements Program.Samples Received + (ML20065T075)
- HL-1402, Responds to NRC Re Violations Noted in Insp Rept 50-366/90-23.Corrective Actions:Filter Paper Reexamined After Mispostioned Switch Placed in Correct (on) Position & Paper Determined to Be Advancing Properly + (ML20065T078)
- ML20065T079 + (ML20065T079)
- ML20065T080 + (ML20065T080)
- 05000317/LER-1982-061, Forwards LER 82-061/03X-0 + (ML20065T081)