Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065R149 + (ML20065R149)
- LIC-94-0090, Forwards FCS Performance Indicators Rept for Mar 1994 + (ML20065R150)
- 05000416/LER-1982-082-03, /03L-0:on 820925,Channels C&D of Control Room Vent Radiation Monitors Were Outside Required Tech Spec Tolerences.Caused by Monitors Being Out of Calibr.Channels Recalibr + (ML20065R151)
- ML20065R153 + (ML20065R153)
- 05000270/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Encl + (ML20065R155)
- 05000443/LER-1990-026, :on 901116,ESF Actuation Occurred,Causing Control Room Normal Makeup Air Control Subsystem to Transfer to Control Room Emergency Air Cleanup Sys.Caused by Personnel Error.Technician Counseled + (ML20065R161)
- ML20065R163 + (ML20065R163)
- PY-CEI-NRR-1281, Part 21 Rept Re Failure of Several Asco Scram Solenoid Pilot Valves.Initially Reported on 901211.Faulty Valves Limited to Single Production Run.Installed Valves from Subj Production Run Replaced + (ML20065R165)
- ML20065R166 + (ML20065R166)
- 05000270/LER-1982-012-03, /03L-0:on 820916,turbine Driven Emergency Feedwater Pump Declared Inoperable When Trip/Throttle Valve 2MS-94 Discovered Tripped in Closed Position.Cause Not Known.Valve Reset.Video Alarm Will Be Repaired + (ML20065R169)
- LIC-94-0096, Forwards Revised Radiological Emergency Response Plan & EPIPs + (ML20065R179)
- HL-1398, Monthly Operating Repts for Nov 1990 for Hatch Units 1 & 2 + (ML20065R180)
- ML20065R185 + (ML20065R185)
- 05000328/LER-1982-115, Forwards LER 82-115/01T-0 + (ML20065R191)
- ML20065R192 + (ML20065R192)
- ML20065R197 + (ML20065R197)
- U-601764, Monthly Operating Rept for Clinton Power Station Unit 1 for Nov 1990 + (ML20065R201)
- DCL-94-096, Forwards Substitution Page for Change 2 to Rev 18 of Physical Security Plan for Clarification Purposes Only.Page Withheld (Ref 10CFR73.21) + (ML20065R202)
- 05000354/LER-1990-026-02, :on 901114,warmup of HPCI Sys Steam Supply Lines Conducted in Peparation for Restart During Forced Outage.Caused by Broken Pipe Support on Steam Supply Line. Design Change Request Initiated + (ML20065R203)
- 05000321/LER-1982-083, Forwards LER 82-083/03L-0 + (ML20065R204)
- 05000324/LER-1982-113-03, /03L-0:on 821003,during Reactor Startup Coolant Analysis,Reactor Coolant Conductivity Exceeded Tech Specs. Caused by Breakdown of Reactor Water Cleanup Sys Resins. Resins Allowed to Decompose & Reactor Conductivity Reduced + (ML20065R209)
- ML20065R211 + (ML20065R211)
- AECM-82-510, Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed + (ML20065R216)
- 05000321/LER-1982-083-03, /03L-0:on 820915,QC Review Disclosed Installation of non-Q Part in Level Switch on a Loop Core Spray Discharge Line.Caused by Ineffective Administrative Procedures.Part Ordered.Required Q Functions Not Affected + (ML20065R233)
- ML20065R235 + (ML20065R235)
- ML20065R245 + (ML20065R245)
- ML20065R246 + (ML20065R246)
- ML20065R250 + (ML20065R250)
- ML20065R254 + (ML20065R254)
- 05000416/LER-1982-076, Forwards LER 82-076/03L-0 + (ML20065R256)
- NRC-94-4116, Nonproprietary Passive Containment Cooling Sys Bench Scale Wind Tunnel Test + (ML20065R258)
- ML20065R270 + (ML20065R270)
- ML20065R272 + (ML20065R272)
- ML20065R275 + (ML20065R275)
- ML20065R278 + (ML20065R278)
- ML20065R280 + (ML20065R280)
- 05000416/LER-1982-076-03, /03L-0:on 820923,smoke Detectors in Zones 2-06, 2-07,2-17 & 2-20 of Auxiliary Bldg Alarmed & Would Not Clear.No Smoke or Fire Present.Alarms Deactivated.Caused by Dust Accumulation.Detectors Cleaned + (ML20065R281)
- NRC-94-4117, Forwards Current Status of AP600 Testing Program Issues Identified in NRC ,Including Westinghouse Understanding of Mutual Conclusions Reached at 940407 Meeting + (ML20065R284)
- ML20065R289 + (ML20065R289)
- RBG-40540, Forwards Endorsements 57-60 to Nelia Policy NF-0286, Endorsements 49-52 to Maelu Policy MF-0119,Endorsements 16 & 17 to Nelia Policy N-0100 & Maelu Policy M-0100 & Endorsement 11 to Nelia Policy NW-0178 + (ML20065R290)
- ML20065R296 + (ML20065R296)
- ML20065R297 + (ML20065R297)
- ML20065R305 + (ML20065R305)
- ML20065R313 + (ML20065R313)
- ML20065R315 + (ML20065R315)
- JAFP-94-0252, Special Rept 94-001 Re Fire Barrier Penetration Seals Not Restored within TS Time Frame.Caused by Scope of Work in Steam Tunnel.Roving Fire Watch Posted in Recirculation Motor Generator Set Room & Floor Plugs Removed + (ML20065R318)
- ML20065R329 + (ML20065R329)
- ML20065R331 + (ML20065R331)
- ML20065R333 + (ML20065R333)
- ML20065R343 + (ML20065R343)
- ML20065R348 + (ML20065R348)