Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064B663 + (ML20064B663)
- ML20064B665 + (ML20064B665)
- ML20064B691 + (ML20064B691)
- 05000247/LER-1978-024, Forwards LER 78-024/04L-0 + (ML20064B692)
- ML20064B694 + (ML20064B694)
- ML20064B695 + (ML20064B695)
- 05000311/LER-1982-140, Forwards LER 82-140/03L-0.Detailed Event Analysis Encl + (ML20064B696)
- 05000334/LER-1978-048, Forwards LER 78-048/03L-0 + (ML20064B698)
- 05000334/LER-1978-048-03, /03L-0 on 780221:during Rev Test Data on 780825, Noted That Final Setpoint Valve Entered on 780221 for RCS Loop 1B Cold Leg Loop Stop Valve Relief Line Flow Interlock Was 124 Gpm Caused by Improper Setpoint + (ML20064B703)
- 05000311/LER-1982-140-03, /03L-0:on 821121,while Performing Surveillance Procedure SP(0)4.6.1.3 on 130 Ft Elevation Containment Airlock,Leakage Rate Exceeded Tech Specs.Caused by Excessive Air Flow Past Inner Door Seal.Seal Repositioned + (ML20064B705)
- 05000259/LER-1978-028, Forwards LER 78-028/01T + (ML20064B707)
- ML20064B711 + (ML20064B711)
- 05000259/LER-1978-028-01, /01T-0 on 780919:Foxboro Model 610 Pwr Supplies Provided Under TVA Contact 75K11-8680 Were Not Seismically Qualified,Qualified Pwr Supplies Have Been Provided & Will Be Installed + (ML20064B712)
- JAFP-94-0124, Forwards Rev 3 to Security Contingency Plan.Encl Withheld (Ref 10CFR73.21) + (ML20064B713)
- JAFP-94-0125, Forwards Modified Amended Security Force Training & Qualification Plan,Rev 4.Encl Withheld + (ML20064B715)
- ML20064B717 + (ML20064B717)
- 05000325/LER-1978-071, Forwards LER 78-071/03L-0 + (ML20064B718)
- ML20064B719 + (ML20064B719)
- ML20064B721 + (ML20064B721)
- ML20064B722 + (ML20064B722)
- 05000325/LER-1978-071-03, /03L-0 on 780905:during Periodic Test,Radiat Monitor D12-RM-NO10B HI-HI Trip Point Drifted to Higher than Permitted Level.Monitor Recalibrated.Drift Appears to Be Isolated Incident;No Further Action Taken + (ML20064B723)
- ML20064B725 + (ML20064B725)
- LIC-94-0052, Forwards Rev 7 to Site Security Plan & Detailed Summary Listing of Changes Made in Rev,Including Revised Plan Format.Rev Withheld (Ref 10CFR73.21) + (ML20064B726)
- 05000281/LER-1978-011, Forwards LER 78-011/03X-1 + (ML20064B727)
- ML20064B729 + (ML20064B729)
- 05000219/LER-1978-018, Forwards LER 78-018/01T-0 + (ML20064B734)
- ML20064B735 + (ML20064B735)
- 05000259/LER-1981-037, Forwards Updated LER 81-037/01X-2 + (ML20064B736)
- 05000219/LER-1978-018-01, /01T-0 on 780916:3 MSIVs(NS03A,NS04A,NS04B) Had Leakage Rates in Excess of Maximum Allowable Due to Stem Packing,Cracked Stellite Weld & Failure of Main Poppet to Seat Properly.Msiv Failures Being Investigated + (ML20064B739)
- 05000280/LER-1978-004-03, /03X-1 on 780305:loss of Svc Water Flow Through Charging Pump Intermediate Seal Cooler Was Caused by Corrosion of Stem of Discharge Gate Valve;Corrosion Was Galvanic(Brass Touching Bronze);Problem Will Be Studied + (ML20064B745)
- 05000277/LER-1978-037-03, /03L-0 on 780901:while Testing ADS Subsys,Timers on Both Loops Were Found Outside the 115-125 Second Limit of Tech Specs Due to Setpoint Drift of Time Delay Relays. Timers Were Calibrated,Retested & Returned to Svc + (ML20064B750)
- 05000278/LER-1978-016-03, /03L-0 on 780904:during Surveillance Test Unit 3 Dmain Steam Radiat Monitor Failed to Cause a Half Scram Due to Defective Transistor.Transitor Was Replaced & Monitor Returned to Svc in 6 Hours + (ML20064B752)
- 05000277/LER-1978-036-03, /03L-0 on 780901:failure of Auxiliary Oil Pump to Start Due to a Ground in Motor.Motor,Baldor Type 1040D, 7 1/2 H.P.,25OV.D.C. Was Replaced & HPCI Sys Tested Satisfactorily W/In 36 Hours.Ads Timers Not W/In Tech Specs + (ML20064B754)
- ML20064B765 + (ML20064B765)
- ML20064B774 + (ML20064B774)
- AECM-82-569, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/82-66.Corrective Actions:All Radiographs Removed from Plant Staff Vault & Transferred to Bechtel & Administrative Procedure 01-S-05-1 Re Storage Revised + (ML20064B778)
- ML20064B790 + (ML20064B790)
- ML20064B794 + (ML20064B794)
- ML20064B805 + (ML20064B805)
- 05000336/LER-1978-022, Forwards LER 78-022/03l-0 + (ML20064B809)
- ML20064B811 + (ML20064B811)
- 05000280/LER-1978-028, Forwards LER 78-028/03L-0 + (ML20064B815)
- 05000336/LER-1978-022-03, /03L-0 on 780906:Loss of Methyl Iodide Removal Efficiency for a Ebfs Train. Cause Unknown + (ML20064B817)
- 05000280/LER-1978-028-03, /03L-0 on 780916:snubber Not Meeting Inspec Criteria Caused by Low Oil Level Due to Leakage at Mating Surface Between Body & End Plate.Holding Bolts Were Tightened & Snubber Was Refilled + (ML20064B825)
- ML20064B832 + (ML20064B832)
- ML20064B840 + (ML20064B840)
- ML20064B847 + (ML20064B847)
- ML20064B849 + (ML20064B849)
- ML20064B851 + (ML20064B851)
- ML20064B855 + (ML20064B855)
- ML20064B856 + (ML20064B856)