ML20064B794

From kanterella
Jump to navigation Jump to search
Responds to 780913 NRC Request for Schedule for Submittal of Rev ECCS Analysis.Rept Will Be Ready by 790228
ML20064B794
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/02/1978
From: Clayton F
ALABAMA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 7810110102
Download: ML20064B794 (1)


Text

-

A!abama Power Company 600 Noen 18:n Street Pos:O* ice Bon 2641 Birrvgmam A acata 35291 Te epnone 205 323-5341 F L CLAYTON, JR.

AlabamaPower Semor Vice President the southem electnc system October 2, 1978 Docket No. 50-348 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn:

Mr. A. Schwencer JOSEPH M. FARLEY NUCLEAR PLANT-UNIT NO. 1 LOCA ECCS EVALUATION MODEL Gentlemen:

In a letter dated September 13, 1978, the NRC requested a schedule for submittal of a revised ECCS analysis which incorporates the corrsc-tion of errors in the Westinghouse ECCS evaluation model identified in our letter of April 7, 1978. This revised analysis should be ready for submittal to the NRC by February 28, 1979.

Yours truly, y].n,gic-y

~

v.c y

F. L. Cld'yton, Jr. F FLCJr/TNE:bhj cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge I,kOb 9 tik115 2 pa.

Pot Aboex-9st -svV P 1r w ya y

RoollgS

//o