ML20064B711

From kanterella
Jump to navigation Jump to search
Transmits Rev 6 to Training & Qualification Plan for Security.Enclosed Info Withheld (Ref 10CFR73.21)
ML20064B711
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/04/1994
From: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-94-29, NUDOCS 9403080391
Download: ML20064B711 (1)


Text

..

1 VERMONT YANKEE

' ' NUCLEAR POWER CORPORATION

/

March 4, 1994 j

BVY #94-29

\\

.\\

Ferry Road. Brattleboro. VT 05301-7002 l

V>

l (802) 257-527i j

U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555

Reference:

License No. DPR-28 (Docket No. 50-271)

Subject:

Revision 6 to the Vermont Yankee Training and Qualification Plan

Dear Sir:

1 This letter transmits Revision No. 6 to the Vermont Yankee Training and Qualification Plan for Security (VY T&Q Plan),' This revision reflects enhancements recently made to our security program. This change was previously incorporated into our implementing procedures and the enclosure reflects the resultant plan changes. This revision also reflects a streamlining of the document; no commitments have been changed.

j

.i We have reviewed this revision and have determined that the changes do not decrease the safeguards effectiveness of the plan. Therefore, in accordance with 10 CFR 50.54(p), prior NRC approval of tlus revision is not required.

'the revision to the VY T&Q Plan is Attachment A to this letter. It is considered SAFEGUARDS 1NFORMATION which is to be withheld from public disclosure in accordance with 10 CFR 73.21.

We have enclosed our standard Document Custody Form and Change Transmittal Form for each copy of the i

plan revision required by the NRC. Please sign and return these forms.

We trust that the enclosed information is deemed acceptable; however, should you have any questions, please J

contact Mr. Gregory L. Morgan, Security Manager, at our plant site,

)

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION i

h Donald A. Rei Vice President, Operations cc:

(Cover letter only)

USNRC Region I Administrator USNRC Resident Inspector (VYNPC) r

- USNRC Project Manager g30gg g g

[/2 F

PDR

Enclosure:

Attachment A, Revision 6 to the VY T&Q Plan 1/

DOCUMENT TRANSMITTED llEREWITil CONTAINS SAFEGUARDS INFORMATION WilEN SEPARATED FROM ENCLOSURES IIANDLE Tills DOCUMENT AS DECONTROLLED i

'l

. - ~

-.