ML20064B774

From kanterella
Jump to navigation Jump to search
Forwards Amend 29 to FSAR
ML20064B774
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/29/1982
From: Goldberg J
HOUSTON LIGHTING & POWER CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20064B776 List:
References
ST-HL-AE-917, NUDOCS 8301040184
Download: ML20064B774 (4)


Text

The Light Company riousion tigniing & rower eo. sox ivoo riouston.rexas 7700i <7:33 228 92ii December 29, 1982 ST-HL-AE-917 File Number: G9.2 SFN: V-0100 Mr. Harold Denton Office of Nuclear Reactor Regulation Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

South Texas Project Units 1 & 2 Docket Nos. STN-50-498, STN 50-499 Final Safety Analysis Report Amendment 29_

Please find, under separate cover, sixty copies of Amendment 29 to the South Texas Project (STP) Units 1 & 2 Final Safety Analysis Report (FSAR). A copy of this transmittal is attached to each amendment copy.

Amendment 29 revises the FSAR to incorporate the following:

1.

Responses to Reactor Systems Branch, Geosciences Branch, Accident Evaluation Branch, Generic Issues Branch, Power Systems Branch, Chemical Engireering Branch, Siting Analyses Branch, Core Performance Branch, Procedures and Test Review Branch, Quality Assurance Branch, and Structural Engineering Branch Questions and associated FSAR text revisions; and i

2.

Miscellaneous FSAR text revisions and editorial changes.

Very truly yours, N b.

$//

l

[.H.Goldberg Vice President Nuclear Engineering and Construction MAM/mg Attachment

@/

.s

, 63 l

8301040184 821229 PDR ADOCK 05000498 PDR K

llouston I.ighting & Power Cornpany December 29, 1982 cc:

G. W. Oprea, Jr.

ST-HL-AE-917 J. H. Goldberg File Number: G9.2 J. G. Dewease Page 2 J. D. Parsons D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins (NRC)

D. E. Sells (NRC)

W. M. Hill, Jr.

(NRC)

M. D. Schwarz (Baker & Botts)

R. Gordon Gooch (Baker & Botts)

J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)

STP RMS Director, Office of lospection & Enforcement Nuclear Regulatory Commission Washington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C.

20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harnon & Weiss for the State of Texas 1725 I Street, N. W.

P. O. Box 12548 Suite 506 Capitol Station Washington, D. C.

20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.

Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn i

5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Revision Date 10-18-82 l

4 Before the United States Nuclear Regulatory Commission Docket Nos. STN 50-498, STN 50-499 Houston Lighting & Power Company, et al.

South Texas Project Units 1 & 2 Amendment 29 Houston Lighting & Power Company, an applicant in the above captioned proceeding, for itself and for the City of San Antonio, Central Power ano Light Company and the City of Austin, hereby files. Amendment 29 to the Final,

Safety Analysis Report.

i i

}

Arendment 29 revises the Final Safety Analysis Report to include,the 1

1

~

~U l

following:

N 1.

Responses to Reactor Systems Branch, Geosciences Branchi o Accident Evaluation Branch, Gerieric Issues Branch, Power

/

Systems Branch, Chemical Engineering Branch, Siting Analyses Branch, Core Performance Branch, Procedures and Test Revisw Branch, Quality Assurance Branch, and Structural Engineering

y. p,

-(

a Branch Questions and associated FSAR text revisions; a6d i

Miscellanecus FSAR Qxt revibions and editorial changes.

2.

Reipec'tfully submitted, HOUSTON LIGHTING & POWER COMPANY

\\

.J, g

' ~ ~

r J. H. Goldberg d

i O

sVice President

\\

Nuclear Engineering and Corstrudion Q!

,l it s

(

k

.{

s s.

  • 's

.\\

.h, i

....g

\\.

s 3

n N

i j

3 T

3

,t y

w

. L.

[.

.i '

t

i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION i

In the Matter 5

5 Houston Lighting & Power 5

Docket Nos. 50-498 Company, et al.,

5 50-499 9

South Texas Project 9

Units 1 and 2 s

AFFIDAVIT

~J. H. Goldberg being duly sworn, hereby deposes and says that he is Vice President Nuclear Engineering and Construction of Houston Lighting &

Power Company; that he is duly authorized to sign and file with the Nuclear

s.

Regulatory Commission the attached Amendment 29 to the STP FSAR; that he is i

familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge and belief.

/

U. H. Goldberg V Vice President Nuclear Engineering and Construction STATE OF TEXAS COUNTY OF HARRIS s Subscribed and sworn to before me, a Notary Public in and for Harris VT"*"h@*%

day of O h

, 1982.

County, Texas

!o.jl.l f,f,ff,(o,k 1

ir M

0dk v*

Notary Publid' ih'and ~for the g%,1

,[

/-

State of Texas My_ commission 82$tres?

BEVERtY J. TITE Pw, n s'ir 9e of Tevas

-_ fay Commiston Exp~ s __Lo[l

/ #'/

I I

. - _ - _