Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20046B431 + (ML20046B431)
- ML20046B432 + (ML20046B432)
- ML20046B433 + (ML20046B433)
- HL-3410, Responds to NRC Requesting Addl Info Re GL 92-01 Rev 1,Reactor Vessel Structural Integrity + (ML20046B435)
- ML20046B438 + (ML20046B438)
- ML20046B440 + (ML20046B440)
- HL-3403, Responds to Suppl Response to Request for Info Re Weld Overlay Activities + (ML20046B443)
- HBL-93-047, Forwards Info for Nine Categories of Nuclear Plant Personnel Defined in Training Rule (10CFR50.120),requiring Development of Training Programs Based on Sys Approach to Training,In Response to NRC + (ML20046B444)
- ML20046B445 + (ML20046B445)
- ML20046B447 + (ML20046B447)
- ML20046B448 + (ML20046B448)
- ML20046B449 + (ML20046B449)
- ML20046B450 + (ML20046B450)
- ML20046B452 + (ML20046B452)
- ML20046B453 + (ML20046B453)
- ML20046B456 + (ML20046B456)
- ML20046B459 + (ML20046B459)
- ML20046B460 + (ML20046B460)
- LIC-93-0148, Informs NRC of Rev to Commitment Re Appointment of Individual Responsible for Maintaining Traceability of M&TE Usage in Response to Violation Noted in Insp Rept 50-285/88-37 + (ML20046B462)
- ML20046B463 + (ML20046B463)
- ML20046B464 + (ML20046B464)
- ML20046B465 + (ML20046B465)
- ML20046B467 + (ML20046B467)
- ML20046B468 + (ML20046B468)
- ML20046B469 + (ML20046B469)
- ML20046B471 + (ML20046B471)
- RC-93-0209, Requests That Submittal Date for Response to Violations Noted in Insp Rept 50-395/93-03 & 50-395/93-17 + (ML20046B472)
- 05000317/LER-1993-005, :on 930630,TS 3.0.3 Entered Due to Both Containment Spray Sys Inoperable.Replaced CCW Outlet Valve Actuator Connecting Link Assembly from Number 11 SDC Heat Exchanger + (ML20046B473)
- ML20046B475 + (ML20046B475)
- ML20046B478 + (ML20046B478)
- PY-CEI-NRR-1681, Forwards Response to NRC Bulletin 93-003, Resolution of Issues Related to Rv Water Level Instrumentation in Bwrs. Info Also Responds to NRC 930520 RAI Re Proposed C/As & Implementation Schedule Required by GL 92-04 + (ML20046B480)
- ML20046B481 + (ML20046B481)
- ML20046B482 + (ML20046B482)
- 05000446/LER-1993-006-01, :on 930703,auxiliary Feedwater Signal Inadvertently Actuated Due to Personnel Error.Equipment Reset to Normal Lineup & Fuses Removed for Reinstallation Prior to Reactor Startup + (ML20046B484)
- ML20046B485 + (ML20046B485)
- ML20046B487 + (ML20046B487)
- 05000298/LER-1993-028, :on 930630,two Potentially Valves Were Inoperable Due to Inadequate Design of Valve Operators by Manufacturer.Modified Valve Operators + (ML20046B488)
- 05000271/LER-1993-008, :on 930701,discovered That During Previous Surveillance Testing on 910515,pump Differential Pressure Entered IST Required Action Range Due to Personnel Error. Plant Procedure AP 0164 Will Be Revised + (ML20046B490)
- ML20046B491 + (ML20046B491)
- ML20046B494 + (ML20046B494)
- ML20046B495 + (ML20046B495)
- 05000352/LER-1993-008-01, :on 930627,MCR Annunciator Alarmed Indicating That Outside Atmosphere Reactor Encl (Re) Negative Differential Pressure Decayed Due to Failure of Normal Re Ventilation Fan Motor.Subj Fan Replaced + (ML20046B496)
- ML20046B497 + (ML20046B497)
- ML20046B498 + (ML20046B498)
- ML20046B499 + (ML20046B499)
- 05000353/LER-1993-008-02, :on 930630,determined That TS SR on Fire Rated Assemblies Not Satisfied Due to Personnel Error During Procedure Preparation.Surveillance Test Procedure ST-7-022-922-0 Will Be Revised + (ML20046B500)
- ML20046B501 + (ML20046B501)
- ML20046B502 + (ML20046B502)
- ML20046B503 + (ML20046B503)
- ML20046B504 + (ML20046B504)
- 05000353/LER-1991-015, :on 910912,HPCI Sys Discovered to Be in Degraded Condition When HPCI Turbine Steam Supply Valve Failed to Fully Open.Recommendations of EPRI Improved MOV Lubricant Program Implemented + (ML20046B505)