Informs That NRC Has Rescheduled Meeting to Discuss Regulatory Treatment of non-safety Sys in Passive Designs from 930517 to 930520
ML20046B487
Person / Time
Issue date: 05/13/1993
From: Calvo J
Office of Nuclear Reactor Regulation
To: Devine J
ELECTRIC POWER RESEARCH INSTITUTE
References
PROJECT-669A NUDOCS 9308040277
Download: ML20046B487 (3)


Text

<

k

.[spn Rf C(,s%

@ydM UNITED STATES i

(

E NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D.C. 20555-0001

%, - /

May 13, 1993 j

Project No. 669 l

Mr. John C. DeVir.s, Jr.

Senior Program Manager ALWR Program Electric Power Research Institute Post Office Box 10412 Palo Alto, California 94303 t

Dear Mr. DeVine:

SUBJECT:

RESCHEDULING OF THE MEETING TO DISCUSS THE REGULATORY TREATMENT OF i

NON-SAFETY SYSTEMS IN PASSIVE DESIGNS t

]

As you are aware, the Nuclear Regulatory Commission (NRC) staff is preparing a final safety evaluation report (FSER) of EPRI's Utility Requirements Document l

(URD) for passive plant designs. The process for the regulatory treatment of non-safety systems (RTNSS) is a significant policy issue for passive designs, and must be resolved before the FSER can be completed. The NRC staff has met with EPRI representatives twice, on January 22, 1993, in Palo Alto, Califor-nia, and on April 15, 1993, in Rockville, Maryland, to discuss this issue.

Despite excellent progress and apparent agreement on basic principles, EPRI and the NRC were not able to reach final resolution for the RTNSS process at the April meeting. Due to the significance of this issue for the passive-design reviews as well as the EPRI URD FSER, both parties agreed to pursue resolution of this issue on the most aggressive schedule possible. A meeting date of May 17, 1993, was agreed to based on the revised EPRI RTNSS submittal being received by the NRC staff by hay 10, 1993.

Since the EPRI submittal has-been delayed, we have rescheduled the May 17.-

1993, meeting.

It is our understanding that EPRI will submit a revised RTNSS process by May 13, 1993. Allowing one week for review by the NRC technical.

staff, a meeting to discuss RTNSS has been arranged, as you know, for May 20, 1993, from 2-p.m. to 4 p.m. in room 12B11 at the NRC's One White Flint North building. However, the rescheduled meeting is contingent on the receipt of a i

revised submittal _ from EPRI by May. 14, 1993. We would like to have a copy of-that submittal to be faxed as soon as is available to both Ashok-Thadani, fax number (301) 504-3577, and Nancy Markisohn, fax number (301) 504-2259.

The~

]hp,'6 kb'-/

J i

9308040277 930513 i

y (J 4 N r 6 L M j')' j PDR PROJ 669A PLR3

~

0}{g g

(heju.y I ?9) j

f) l l

Mr. John C. Devine May 13, 1993 NRC is concerned that any further delay in resolation of this important issue will adversely impact the passive design review schedules and preparation of the EPRI URD FSER. We are available to further discuss this subfcct at your convenience.

Sincerely, (Original signed by)

Jose Calvo, Acting Associate Director for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:

Central File PDST R/F TMurley, 12G18 WRussell PDR RBorchardt TEssig JHWilson NMarkisohr PShea JMoore, 15B18 GGrant, 17G21 ACRS (11)

OFC:

LA:PDST:ADAR (A)D:phST:ADAR (A)ADARIT 4..

d bfD RBorddrdt:sg JCalvo //

i NAME:

PShea mpATE:

05//s/93' 05/lh93 05/ / ?/93

/

0FFICIAL RECORD COPY:

DOCUMENT NAME:

EPRI.RB

~

O O

Mr. J. Devine, Senior Program Manager Project No. 669 ALWR Utility Steering Committee EPRI cc:

Mr. E. E. Kintner Chairman Utility Steering Committee Bradley Hill Road Post Office Box 682 Norwich,_ Vermont 05055 Mr. John Trotter Nuclear Power Division Electric Power Research Institute Post Office Box 10412 Palo Alto, California 94303 Mr. Brian A. McIntyre, Manager Advanced Plant Safety & Licensing i

Westinghouse Electric Corporation Energy Systems Business Unit v

Post Office Box 355 Pittsburgh, Pennsylvania 15230 i

Mr. Jo.aph Quirk GE Nuclear Energy Mail Code 782 General Electric Company 175 Curtner Avenue San Jose, California 95125 Mr. Stan Ritterbusch Combustion Engineering 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095 Mr. Sterling Franks U. S. Department of Energy NE-42 Washington, D.C.

20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Room 8002 Washington, D.C.

20503