.= _ _. ~ ~
._c
.~
l Georg1a Power Company 40 inverness Center Parkway Post Oftce Box 1295 Birmingharn Alabarna 35201 Telepnone 205 877 7122-L a Power l
ce Pfe fde5t. Nuclear the sotoveo erecinc system vog:le vroect 3993 LCV-0080' Ihcket Nos. 50-424 50-425 TAC Nos. M84159 M84160 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT REVISION TO PROPOSED TECHNICAL SPECIFICATION CHANGE FEEDWATER ISOLATION SYSTEMS' Gentlemen:
I By letter ELV-05103, Georgia Power Company (GPC) proposed to add requirements for the operability of feedwater isolation systems to the Technical Specifications for the Vogtle Electric Generating Plant (VEGP). ' Attached to this letter is a revision to the proposed specifications, as suggested by the NRC staff during a telephone conversation of -
July 1,1993. This revision maintains the requirement for placing the plant in mode 3 with inoperable feedwater isolation systems, but eliminates the requirement for mode 4.. This is.
appropriate since the proposed specification is only applicable for modes 1 and 2.
i This revision is consistent with the applicability and action requirements for feedwater systems of similar design as described in NUREG 1431. The change does not affect the basis or conclusions of the significant hazards evaluation contained in ELV-05103.
l Sincerely, C. K. McCoy i
CKM/H%%f/gmb Attachment l
cc:.(See next page) 9309040268 930727
~
j n
PDR>?ADOCK 05000424-j p
PDR I.
.,,#wr.
y v
,we->,--m+v-w.-#.m-e,a '
w-w e 4
- - e--e F v-+-
j i
GeoigiaPower1 U. S. Nuclear Regulatory Commission Page 2 cc: Geornia Power Company Mr. J. B. Beasley Mr. M. Sheibani-NORMS t
U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle t
I 4
l i
l t
s e
I
(
L
~
l-LCV-0080 L
1 f
t t
7C3775 a