Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045E887 + (ML20045E887)
- ML20045E889 + (ML20045E889)
- ML20045E891 + (ML20045E891)
- ML20045E894 + (ML20045E894)
- ML20045E895 + (ML20045E895)
- ML20045E896 + (ML20045E896)
- SNRC-2083, Forwards Rev 2 to Security Plan for Long Term Defueled Condition,Fuel Storage in Spent Fuel Pool,Amended Security Training & Rev 6 to Qualification Plan.Encls Withheld (Ref 10CFR73.21) + (ML20045E901)
- B14515, Informs That Util Scheduled Annual Emergency Preparedness Exercise at Plant for 930922.Objectives Encl.Requests That Encl Be Withheld from PDR Until Completion of Exercise.W/O Encl + (ML20045E902)
- BECO-93-085, Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for 1992 + (ML20045E904)
- ML20045E909 + (ML20045E909)
- ML20045E913 + (ML20045E913)
- ML20045E927 + (ML20045E927)
- ML20045E930 + (ML20045E930)
- LD-93-100, Forwards Matl to Close follow-on Questions to Dser Responses.Attachment 1 Provides Responses to Questions on Fire & Flood Portions of PRA + (ML20045E933)
- ML20045E935 + (ML20045E935)
- ML20045E936 + (ML20045E936)
- 05000266/LER-1992-003, Comments on Preliminary Draft of NUREG/CR-4674, Precursors to Potential Severe Core Damage Accidents:1992,Status Rept. Section B.14 of Draft NUREG Based on Unit 2 of LER 92-003 + (ML20045E937)
- ML20045E942 + (ML20045E942)
- BSEP-93-0095, Provides Schedule for Efforts to Be Taken to Minimize Corrosion in Units Drywell & Torus Re NRC Insp Repts 50-324/93-02 & 50-325/93-02 + (ML20045E943)
- ML20045E945 + (ML20045E945)
- ML20045E952 + (ML20045E952)
- ML20045E954 + (ML20045E954)
- ML20045E966 + (ML20045E966)
- ML20045E967 + (ML20045E967)
- ST-HL-AE-4499, Forwards Rev 4 to Pump & Valve IST Plan, for Stp,Unit 2 + (ML20045E971)
- ML20045E975 + (ML20045E975)
- ML20045E978 + (ML20045E978)
- ML20045E981 + (ML20045E981)
- ML20045E982 + (ML20045E982)
- ST-HL-AE-4498, Forwards Rev 6 to Pump & Valve IST Plan, Stp,Unit 1 + (ML20045E984)
- 05000298/LER-1993-023, :on 930528,fuel Assemblies Loaded Into Reactor Core Without Control Rods Fully Inserted,In Violation of TS 3.10.A.2.Caused by Need to Reposition Fuel Support Piece. Training Will Be Revised + (ML20045E986)
- ML20045E987 + (ML20045E987)
- ML20045E989 + (ML20045E989)
- ML20045E990 + (ML20045E990)
- BVY-93-067, Provides Written Notification of Intent to Implement 10CFR20.1001-20.2401 & Associated Apps Prior to 940101 + (ML20045E992)
- ML20045E993 + (ML20045E993)
- ML20045E994 + (ML20045E994)
- 05000277/LER-1993-012, :on 930607,discovered That Surveillance Test on Fire Protection Sys Missed on 930601.Caused by Insufficient Degree of Attention Applied by Nonlicensed Individual.Test Satisfactorily Completed + (ML20045E996)
- ST-HL-AE-4502, Advises That Util Currently Simplifying Procedures That Govern Work Control Process & Will Not Add Examples & Specific Instructions,Delineated in 930402 & 0519 Ltrs + (ML20045E997)
- ML20045E998 + (ML20045E998)
- 05000361/LER-1991-007-02, :on 910410,reactor Manually Tripped on Indication of Complete Loss of Controlled Bleedoff Flow from RCP P004.Caused by Wear on Seal & Rotating Baffle.Baffle Repaired & Baffle Bolts Replaced W/New Bolts + (ML20045F002)
- ML20045F004 + (ML20045F004)
- ML20045F006 + (ML20045F006)
- ML20045F007 + (ML20045F007)
- ML20045F008 + (ML20045F008)
- ML20045F009 + (ML20045F009)
- ML20045F015 + (ML20045F015)
- ML20045F016 + (ML20045F016)
- ML20045F018 + (ML20045F018)
- ML20045F020 + (ML20045F020)