Northem States Power Company 414 Nicollet Matt Minneapolis, Minnesota 55401-1927 Telephone (612) 330-5500 June 30, 1993 Required By:
10CFR Part 2 Appendix C U S Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GFNERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Revised Reply to a Notice of Deviation NRC Inspection Report Nos. 282/92008 and 306/92008 Final Safety Analysis Report Commitment for Inservice Examination of High Enerry Line Piping
References:
(1)
Letter from L R Eliason, NSP to U S Nuclear Regulatory Commission, dated July 10, 1992, titled " Reply to a Notice of Deviation NRC Inspection Report Nos. 282/92008 and 306/92008 Final Safety Analysis Report Commitment for Inservice Examination of High Energy Line Piping" (2) Letter from D D Antony, NSP to U S Nuclear Regulatory Commission, dated February 10, 1993, titled " Supplemental Reply to a Notice of Deviation NRC Inspection Report Nos.
282/92008 and 306/92008 Final Safety Analysis Report Commitment for Inservice Examination of High Energy Line Piping" This letter is written to clarify a commitment made in our responses to a deviation (References 1 and 2).
We had originally committed (Reference 1)-to make certain revisions to Appendix I of the Prairie Island Updated Safety Analysis Report during the next annual submittal.
Subsequently, in a supplemental response (Reference 2) we reiterated this commitment-and gave a date of June 30, 1993 for completion. This was the date when the next annual Updated Safety Analysis Report would be due.
However, because of the change of the Safety Analysis Report update regulation (10 CFR Part 50, Section 50.71(e)), the next required update is not June 30, 1993.
Our next Safety Analysis Report update will be submitted prior to September 30, 1993 and will include the referenced revision to Appendix I.
We discussed this with the Resident Inspector staff on June' 24, 1993.
060055
/h.
I O 9307060290 930630
,6%
/
PDR ADOCK 05000282 p
G PDR gj
)
=
l Northern States Power Company US NRC June 30,1993 Page 2 of 2 This letter contains one revised NRC commitment: Our next Safety Analysis Report update will be submitted prior to September 30, 1993 and will include the referenced revision to Appendix I.
i Please contact. Jack Leveille (612-388-1121, Ext. 4662) if you have any i
_ questions related to this letter.
{ f4' p ' o al5EEY 4u Douglas D Antony Vice President Nuclear Generation c: Regional Administrator - Region III, NRC Senior Resident Inspector, NRC NRR Project Manager, NRC J E Silberg l