NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
[,
ADJUDICATORY July 18, 1980 SECY-A-80-105 i
COMMISSIONER ACTION For The Commissioners From:
James A. Fitzgerald Assistant General Counsel
Subject:
REVIEW OF ALAB-598 (111 THE MATTER OF PACIFIC GAS AND ELECTRIC COMPA!TY)
Facility:
Diablo Canyon 11uclear Power Plant, Units 1 & 2.
To inform the Commission of an Appeal Board deci-
Purpose:
sion for which no petitions for review have been filed,Cand which, in our opinion, C/. h Review Time Expire s :
August 1,1980, as extended Summary:
This proceeding concerns the seismic design of the Diablo Canyon tiuclear Power Plant ("Diablo Canyon").
In ALAB-5 9 8, the Appeal Board granted in part the Joint Intervenors' motion to reopen the record to the extent they requested the con-sideration of new evidence resulting from a major earthquake in California's Imperial Valley, and denied the remainder of their motion regarding new information about the nature of the linkage between certain geologic faults near the facil-ity, and staff's alleged changed position on the environmental qualification of the facility's safety related equipment.
The Appeal Board found that: (1) the data from the Imperial Valley earth-quake may shed light on the correctness of key seismic findings by the Licensing Board and, thus, should be taken into account in reviewing the decision to approve Diablo Canyon's seismic design; (2) the new evidence on the possible connections between geologic faults near the plant, would not af fect the magnitude' of the safe Shutdown Earthquake as determined by the Licensing Board; and (3) recent staff actions
Contact:
heldon L. Trubatch, GC Information in this record y,2; L.fzd 77 3224 in accertnce with the Ficedom of !nictmation Act, excm;Uons 9307060278 930317 E0!A-f2-W4
~-
GILINSK92-436 PDR M97f c
l 2'
on the effect of aging on safety-related equip-ment were not a significant departure from staf f's previous position on this matter and did not indicate that the decision on the record belogwould permit the use of unsafe equipment. (We believe that Discussion:
On September 27, 1979, the Licensing Board issued a partial initial decision in which it concluded that Diablo Canyon will be able to withstand safely any earthquake that can reasonably be anticipated in the plant's vicinity. 1/
Subse-quently, three matters which could af fect that decision developed:
1.
California's Imperial valley experienced a major earthquake; 2.
New information was developed regarding the linkage of geologic faults in the vicinity of Diablo Canyon; and 3.
The NRC staff initiated further regulatory actions regarding the environmental qualifica-tion of safety-related equipment.
These developments are discussed sequentially below.
Imperial Valley Earthouake on October 15, 1979, California's Imperial Fault experienced a major earthquake having a magnitude between 6.4 and 6.9 on the Richter scale.
Num-erous strong motion seismographs in the vicinity of the fault recorded the best data yet avail-able on strong ground motion in the immediate vicinity of such a large earthquake (near-field data).
Diablo Canyon is located in the near-field of the Hosgri fault, which controls'the seismic design of the plant.
The design. basis earthquake has been determined to have a magni-tude of 7.5.
Joint Intervenors argued that these circumstances make the Imperial Valley earthquake data singu-larly relevant to the seismic design of Diablo 1/
4 s
3 Canyon.
Ihey also presented Dr. Brune's prelim-inary analysis of the Imperial Valley earthquake data showing that in his view, the seismic design for Diablo Canyon does not satisfy Appendix A in several respects.
First, they contended that the Safe Shutdown Earthquake chosen for the plant must correspond to a free field response spectrum which encompasses the maximum possible earthquake induced vibratory accelerations at the site.
10 CFR Part 100, App.
A.
V(a)(1)(iv).
Some horizontal ground accelerations produced by, the Imperial Valley earthquake exceeded the accelerations associated with the Safe Shutdown Earthquake chosen for Diablo Canyon.
In addition some response spectra for the Imperial Valley Earthquake exceeded the design spectrum for the plant.
Intervenors believe that the new data shows that Diablo Canyon is designed to withstand an earthquake of magnitude 6.5 and not the Safe Shutdown Earthquake of magnitude 7.5.
- Second, vertical accelerations measured in the near-field of the Imperial Valley earthquake were much greater than two-thirds the measured horizontal accelcrations contrary to the design assumption for Diablo Canyon.
Finally, the Imperial County Service Building was heavily damaged by the Imperial Valley earthquake.
The so-called tau reduction, which some experts claim moderates the ef fects of earthquakes on large buildings, was not observed for this structure.
Pacific Gas and Electric (PG&E) offered several arguments in response:
1.
Appendix A does not require the choice of a design response spectrum which encompasses all maximum earthquake induced accelerations, but permits the use of a design response spectrum derived from an average of data for several earthquakes; 2.
Dr. Brune confused peak instrumental ground motion with design response spectrum values; 3.
Dr. Brune is a seismologist and, thus, has no expertise regarding seismic 1
design of buildings; j
I 1
0 4
4.
Affidavits by PG&E's experts demon-strate that the Imperial Valley earth-quake data does not affect the design response spectrum for Diablo Canyon-because peak velocities and displace-ments at the freguencies for which they were observed do not affect structural design; 5.
Ihe occurrence of vertical accelera-tions greater than two-thirds the horizontal accelerations is immaterial because Diablo Canyon is conservatively designed to withstand expected vertical accelerations at the site; 6.
Analysis of the Imperial Valley eards-quake data by the United States Geolog-ical Survey (USGS ) shows that the linear extrapolations used by Dr. Brune overestimate predicted ground motion; and 7.
Failure to observe the tau effect at the Imperial County Service Building is irrelevant to the design of Diablo Canyon because the county building is built on piles in soil and Diablo Canyon is built on rock.
The NRC staf f presented similar arguments.
The Appeal Board found a number of apparent inconsistencies between the Imperial Valley i
earthquake data and. the information pre-sented during the Diablo Canyon seismic hearing.
Among these are the high accelera-
.l tions leading to horizontal response spectra i
exceeding the design spectrum for Diablo Canyon, the unexpectedly high values of vertical motion, and the failure to observe the tau effect.
Regarding die last point, the Appeal Board noted that PG&E's experts had demonstrated the existence of this effect by analyzing ground motion data for the Hollywood Storage Building, which is also built on piles in soil.
These incon-sistencies, and the uniqueness of the near-field data from the Imperial Valley earth-quake led the Appeal Board to conclude that '
j i
l l
4 5
i it would be appropriate and prudent to reopen the record on this issue.
Accord-ingly, the Appeal Board gave the parties 45 days to answer nine questions regarding seismic issues and to submit any other relevant testimony.
Ei,
fInouropinion, Accord-ingly, we believe Linkage Between Geologic Faults Joint Intervenors' second ground for reopening concerns the maximum credible earthquake asso-ciated with the Hosgri fault.
The Licensing Board determined it to be of magnitude 7.5.
Intervenors rely on a graduate student's recent-analysis of high-resolution seismic reflection data which led him to conclude that a strand of the San Simeon fault zone is connected to a strand of the Hosgri fault zone.
Because the maximum possible earthquake on a fault is proportional to its length, Intervenors contend that - the maximum credible earthquake for Diablo.
Canyon is greater than magnitude 7.5 because 4
that number was based on only the length of the Hosgri fault which the Board assumed to be unconnected to any other fault.
i l
2/
El 5; 1
1 3/
j
6 t
PG&E contended that the Intervenors have not offered new facts because their expert has pre-More-sented only an " interpretation" of data.
over, PG&E contended that this interpretation does not contradict the. Licensing Board 's finding that there is no major connection between the Hosgri fault and other faults in the area.
Finally PG&E contended that Inter-venors of fered nothing new because the USGS assumed a connection between the Hosgri fault zone and other fault zones in the vicinity of Diablo Canyon in arriving at an earthquake of Staff's magnitude 7.5 for the Hosgri Fault.
arguments supported PG&E's position.
The Appeal Board found that Joint Intervenors' new evidence would not have resulted in a dif-ferent decision had it been considered by the Licensing Board.
In the Board's view, the Intervenors' evidence did not contradict the expert testimony by the USGS 'that even if the fault zones are connected the entire system is unlikely to experience an earthquake of magni-tude greater than 7.5.
Accordingly, the Appeal Board did not reopen the record on this issue.1
'In our opinion ~,
Accordi6 ply ~,- 'We believe that L--
Environmental Qualification of Safety-Related Equipment Joint Intervenor's final ground for reopening is based on recent staff communications to licensees regarding the environmental qualifi-cation of safety-related equipment.
Intervenors contended that these communications showed that PG&E has not identified all safety-related equipment in the Final Safety Analysis Report for Diablo Canyon and that the effects of aging on this equipment have not been evaluated in
7 accordance with staff's new upgraded criteria.
Thus, Intervenors argued that the record must be reopened to identify all safety-related
- - equipment at Diablo Canyon and to determine whether the Licensing Board's decision would be affected by the alleged new standards regarding aging.
Staf f contended that Joint Intervenors misint'er-preted its communications.
Staff's request to PG&E for detailed information about safety-related equipment was directed to operational requirements and qualification parameters.
Contrary to Intervenors' contention, the request i
was not intended to imply that PG&E had not identified all safety-related equipment.
A i
complete listing of such equipment is included in the FSAR.
Staf f's notice on environmental qualification and aging presented HRC's proposed resolution of this generic issue.
Staff contended that the f act that its interim. position may require back-fitting at Diablo Canyon does not of itself demonstrate that the Licensing Board would have reached a dif ferent result on the issue because that Board did receive testimony on this issue.
PG&E argued that staff's interim position does require back-fitting, but only if later tests reveal that aging has adversely affected safety-related equipment.
The Appeal Board accepted staff's interpreta-tion that its letter requesting more information about safety-related equipment did not imply that PGLE had not identified all such equipment.
The Appeal Board also noted that the Intervenors had not identified any unlisted safety-related i
equipment.
Regarding staff's interim position on environmental qualifications, the Appeal Board found that the staff had informed the Licensing Board of the pending proposals, and that the Board had considered their future adoption in reaching its decision.
[linourview, g j.
4 8
y i 0h g-r-
Mus, we believe that Recommendation:
/
c
.[ W 3
[JamesA. Fitzgerald b)(ssistant General Counsel-f
Attachment:
ALAB-598 Comissioners' coments should be provided directly to the Office of the Secretary by c.o.b. Friday, Auoust 1,1980.
Comission Staff Office coments, if any, should be submitted to the 4
Comissioners NLT August 25, 1980, with an information copy to the Office of the Secretary.
If the paper is of-such a nature that it requires additional time for analytical review and comment, the Comissioners and the Secretariat should be apprised of when comments may be expected.
Distribution Comissioners Comission Staff Offices Secretariat 4
..m
..m
~
b y
c' UNITED STATES OF AMERICA
'/
l g
NUCLEAR REGULATORY COMMISSION USNRC 2'
ATOMIC SAFETY AND LICENSING APPEAL BOARD 2
24lg,
O!!!ctoflf'4'87 6~
th O
4 M9t Richard S.
Salzman, Chairman Dr. John H. Buck o,
- ct Dr. W. Reed Johnson v
1 G
)
g In the Matter of
)
Jijjj,.,
)
4 :s v.-
PACIFIC GP.S AND ELECTRIC COMPANY
)
Docket Nos. 50-275 OL
)
50-323 OL (Diabh Canyon Nuclear Power
)
Plant,. Units 1 & 2)
).
)
Mr. David S. Fleischaker, Washington, D.C. (Mr. John l
R.
Phillips, Los Angeles, California,-with him on the brief) for Joint Intervenors, San Luis Obispo Mothers for Peace et al., appellants.-
i i
Mr. Herbert H. Brown, Washington, D.C. (Mr. J. Anthony Kline, Sacramento, California, with him on the brief) for the Governor of California, amicus curiae.
Mr. Bruce Norton, Phoenix, Arizona (Messrs. Malcom H.
Furbush and Philip A.
Crane, Jr., San Francisco, California, and Arthur C.
Gehr, Phoenix, Arizona, with him on the brief) for the applicant,. Pacific i
Gas and Electric Company, appellee.
Mr. James'R. Tourtellotte (Messrs.
L.
Dow Davis, IV, and Edward G.
Ketchen with.him on the briefs).for the Nuclear Regulatory Commission staff.
DECISION i
June 24, 1980 I
( ALAB-59 8)
I-1.
The Licensing Board concluded in its September 27, 1979-partial initial decision that the Diablo Canyon plant will be able to withstand safely any earthquake that can reasonably be anticipated
'hkt-
,wereva$~<-
. 1/
2/
in its vicinity.
Joint Intervenors7~
3/
supported by amicus curiae, appealed that determination.
~~
After the appeal was briefed but before it was argued, they 4/
moved to reopen the record on three grounds:
First, that new data obtained from a major earthquake in California's Imperial Valley which occurred on October 15, 1979 -- about three weeks after the decision below was rendered -- cast a shadow on the adequacy of the Licensing Board's seismic analysis, making it problematical whether the Diablo Canyon design criteria meet Commission requirements; second, that "new seismic reflection data," gathered by a University of Cali-fornia graduate student, invalidate both the Licensing Board's 1/
The decision also approved the physical security plan for the f acility.
We dealt with the separate appeal from that
~~
determination in ALAB-580,11 NRC 227 (1980).
2/
Comprised of San Luis Obispo Mothers for Peace; Scenic Shoreline Preservation Conference, Inc. ; Ecology Action Club; Sandra A.
Silver; Gordon Silver; John J. Forster; i
and Elizabeth Apfelberg.
3/
Although not a party in the proceeding below, we allowed the Governor of California to participate on appeal as i
~~
amicus in support of Joint Intervenors' exception number 45, challenging the Board's treatment of " seismic focus-ing."
ALAB-583, 11 NRC __ (March 12, 1980).
4/
The motion was filed on March 28, 1980.
At the oral argument on the main appeal in San Luis obispo, California, on April 3, 1980, we set a date for responses to the motion and indicated that we would decide it on the papers.
The applicant's response was accordingly filed on April 24, 1980, and the staff's on May 5th.
I
~ ' - - ' - - - - - - - - - - - -
t.
findings about the nature of the linkage between the Bosgri and San Simeon f aults and its conclusion that a 7.5 magnitude is a "very censervative" value for the Safe Shutdown EarthquakeT~
and, third, that the staff has changed position about the effect of aging on the ability of the facility's safety-related equipment to function properly and now believes that approval of the applicant's current " environmental qualification progam" (pertaining to this subject) is not warranted.
5/
The term is defined in 10 C.F.R. Part 100, App. A, S III(c) as "that earthquake which is based upon an evaluation of the maximum earthquake potential con-sidering the regional and local geology and seismology and specific characteristics of local subsurface material.
It is that earthquake which produces the maximum vibratory ground motion for which certain structures, systems, and components are designed to remain functional.
These structures, systems, and components are those necessary to assure (1)
The integrity of the reactor coolant pressure boundary.
(2)
The capability to shut down the reactor and maintain it in a safe shutdown condition, or (3)
The capability to prevent or mitigate the conse-quences of accidents which could result in potential offsite exposures comparable to the guideline expo-sures of this part. "
2.
We have discretion to reopen a record in order to s
consider new evidence.
Whether to do so turns on the appraisal of several factors:
(1)
Is the motion timely?
(2) Does it ad-dress significant safety (or environmental) issues?
(3) Might a I
different result have been reached had the newly proffered mate-rial been considered initially?ib/
6/
Kansas Gas and Electric Co. (Wolf Creek Station, Unit 1),
7 NRC 320, 338 Il978).
Relying on decisions
~~
ALAB-462, under Rule 60 of the Federal Rules of Civil Procedure and ICC v. Jersey City, 322 U.S. 503 (1944), applicant argues tnat an additional requirement for reopening a record is that "the newly discovered evidence which the proponent of the motion seeks to have considered must have been in existence at the time of trial."
Applicant's Brief in Response to Motion to Reopen, dated April 24, 1980, at p.
2, fn. 2.
The Federal Rules, however, apply only in district court litigation'and do not govern agency prac-tice.
Rule 1, F.R. Civ. P.
Unlike district courts, ad-ministrative agencies frequently have continuing respon-sibilities over matters under their supervision.
The settled law on reopening administrative records is con-trary to the applicant's position.
Thus, in ICC v.
Jersey City, the Suprene Court upheld an ICC refusal to reopen a record not because the consideration of post-l trial evidence was proscribed, but because whether to reopen for that purpose was a matter entrusted to the agency's discretion.
322 U.S. at 514, 519, 524; accord, United States v. ICC, 396 U.S. 491, 521 (1970) ; Bowman i
Transportation v. Arkansas-Best Freicht System, 419 U.S.
U.S. 281, 294-96 (1974).
Given the NRC's oversight responsibilities (see Power Reactor Corp. v. Electricians, 367 U.S. 396 (1961)),
it would be strange indeed if this Com=ission could not consider the most recent information bearing on safety in deciding whether to license operation of a nuclear power Not surprisingly, agency decisions recognize that plant.
a motion to reopen a record may rest on evidence that "came into e:cistence af ter the hearing closed.' Vermont i
Yankee Nuclear Power Corp. (Vermont Yankee Station),
ALA3-124, 6 AEC 358, 364-65, on remand, LBP-73-18, 6 AEC 448, affirmed in part and reversed in part, ALAB-138, i
6 AEC 520, 523 (1973).
- ' ~ - - - - - - - - _ _, _ _ _ _ _ _ _ _
6 1,
We have considered the motion to reopen in the light of those standards as well as in the context of the decision below and the record upon which it rests.
In our judgment, the Imperial Valley earthquake data may well shed significant additional light upon the correctness of key seismic findings made by the Licensing Board.
If so, we should take that new information into account in reviewing the decision approving the plant's seismic design.
The matter has obvious safety implications and intervenors' motion was made with reasonable dispatch af ter the information became available.
We accord-ingly grant the motion to reopen on this issue to the extent specified in part II of this opinion.
However, as explained in parts III and IV, we find no cause to reopen the record on either the Hosgri-San Simeon linkage or the environnental qualification program questions.
I 3.
The new seismic data may affect our evaluation of the entire seismic reanalysis.
We are, therefore, holding our decision on the remainder of the appeal in abeyance until we have examined those data more closely and have fully eval-uated their significance.
II.
1.
A brief recapitulation of the circumstances surrounding the design of the Diablo Canyon nuclear power plant will place our decision to reopen in perspective.
We observed when this case came before us for another purpose last year (ALAB-519, 9 NRC 42, 45) that:
[a]ll nuclear power plants must be designed and built to protect the public from_the hazards of radioactive releases should the plant be subjected to movements in the earth's crust.
And such con-siderations were taken into account when the Diablo Canyon facility was initially proposed for its Pacific coast site.
At that time the Nacimiento fault was taken to be the nearest major active fault, some 18 to 20 miles northeast of the plant.
The facility was designed, engineered, and constructed to withstand earthquake damage on this basis.
But, years after construction was approved and well underway, that assumption was discovered to be ill-founded.
Subsequent offshore explorations for petroleum have revealed that, at its. closest point, the "Hosgri fault" lies only a few miles off the site of the Diablo Canyon facility.
That proximity raised the likelihood that an earthquake in the vicinity of San Luis Obispo might be " considerably more severe" than initially antici-pated.
In light of this intervening development, the plant's design was extensively reanalyzed by the appli-cant, the staff, and the [ Advisory Committee on Reactor Safeguards).
Their consensus was [that] the Diablo Canyon facility as constructed, with some design modi-fications, would withstand safely the more severe earthquake shocks now reasonably anticipatable.
[ Foot-notes omitted.]
Although it joined in that conclusion, the ACRS expressed reservations about the seismic reevaluation of the facility.
The Committee noted, for example, "that, for want of better
data, certain calculations were necessarily accepted 'largely on (expert) judgnent and experience rather than on extensive observations or analyses,' judgments not previously applied in approving power plant design," and "'that the design bases and criteria utilized in the seismic reevaluation of the Diablo Canyon station for the postulated Hosgri event are in certain cases less conservative than those that would be used for an original design. '"
Ibid.
These matters were explored in the hearings below. The Licensing Board concluded that the plant was adequately designed to protect the public from harm in the event of an earthquake.
Its conclusion rests, among other things, on (1) the " design response spectrum" utilized in the design 7/
reanalysis by staff witness Dr. Nathan M. Newmark; (2) the assumption that the magnitude of vertical acceleration experienced in a major earthquake would be two-thirds of 8/
9/
the horizontal acceleration; and (3) use of the " tau effee ?
to justify a reduction in magnitude of higher frequency motion
_7]
10 NRC at 492-506.
-8/
See 10 NRC at 506-507; see also fn. 17, supra and accompany-ing text.
9/
" Tau" was explained by the Licensing Board "as a simpli-fication of,a very complex wave motion-structure action
~
problem.
The tau effect is ascribed to the fact that all points on the foundation of a building do not respond in phase.
As a result, the motion of the foundation is re-duced which, in turn, leads to a reduction in the motion of the building. * *
- The larger the foundation and the shorter the traveling wave length, the more effective is.the so-called tau reduction."
10 NRC at 494 (citation omitted).
Fv
i
-g.
^
.lM in large structures.
/
On October 15, 1979 -- after the decision below was rendered -- California's Imperial Valley experienced an earthquake ("IV-79") with a magnitude of 6.4 to 6.9 on the Richter Scale.
This approached in size the 7.5 magnitude
" Design Basis" (or safe Shutdown) earthquake on the Hosgri Fault that, in accordance with Commission requirements, all parties agree the Diablo Canyon facility's safety systems 12/
=ust be designed to survive in functioning condition.~
Because of the Imperial Valley's known high seismicity (a' result of the Imperial Fault, which bisects the region),
numerous strong motion instruments (seismographs) had been put in place there before the earthquake occurred.
The response of that instrumentation to IV-79 provided seismolo-gists with what has been described as "the best near-field data set available to date."
Intervenors argue that data obtained from this major seismic event have rendered the Licensing Board findings questionable and that the record should be reopened to' take the new seismic haformation into consideration.
M/
10 NRC at 4 94-96.
11/
The magnitude of this earthquake is variously described in the record:
6.9 (Staff Brief); 6.4 (USGS Circular
-~
795);: 6.7 (Rojan and Ragsdale paper); and 6.6 or, greater (Intervenors' Motion).
12/
See fn. 5, supra.
The terms " Design Basis Earthquake" and " Safe Shutdown Earthquake" are interchangeable.
10 C.F.R. Part 100, Appendix A, 8 III(c) fn. 1 (on p. 546 of the 1980 ed.).
13/
Board Notification BN-79-43, December 17, 1979 (from R.E.
Jackson memorandum of December 12, 1979, p. 1).
2.
We have studied the intervenors' motion and the ap-plicant's and staff's responses to it.
Doing so has left us of the opinion that the IV-79 data do raise factual issues bearing on the saf ety of the plant and their resolution might lead us to a different result than the one the Licensing Board reached.
For example, the design response spectrum for Diablo Canyon was determined primarily from the record of the Febru-ary 9, 1971 earthquake at Pacoima Dam.
That record includes a peak horizontal acceleration of 1.2g which, upon reduction to a response spectrum, yields an " effective" or high fre-quency anchor point acceleration of 0.75g.18 Comparable figures for the smaller IV-79 event are a peak of 0.81g and 15/
a 0.36 mean acceleration. - Yet some of the horizontal response spectra generated from the Imperial Valley motion records ex-ceed the Diablo Canyon spectrum values.
In the case of vertical motion, the near-field IV-79 vertical peak accelerations and the vertical response spectra 14/
See Diablo Canyon Safety Evaluation Report (SER), Sup-plement 5, Appendix C, pp. C-4 and C-6.
~
1F Measured at a distance'of 5.8 km from the Imperial Fault,' which is equal to the Diablo Canyon facility's distance from the Hosgri Fault. Blume Affidavit, 16, Table-1, and Figure 1 (Attached to Applicant's Response to Motion to Reopen).
1 1
i for frequencies greater than 5 cycles per second 8(cps) are
]
generally equivalent to compara.ble values for horizontal motion.16/
In the Diablo Canyon seismic reanalysis, however, vertical motion values are apparently taken to be two-thirds of comparable horizontal values.11/
We further note that some of the vertical response spectra also exceed the Diablo Canyon design spectrum values.
Finally, we are told by the applicant and the staff not to be concerned that apparently no tan ef fect was exhibited at the Imperial County Services Building (which was heavily damaged as a result of the earthquake).
They say this fact f
may be discounted because that building is built on piles, in soil, whereas the Diablo Canyon site is rock.1E/
In the proceeding below, Dr. Newmark (the staff's seismic expert witness) used the motion records of the Eollywood Storage Building -- approximately the same size as the Imperial County Services Building -- to demonstrate the existence and nature of the tau effect.
But the Hollywood building is also built on piles, in soil.
16/
See Blume Affidavit, Table 1(Attached to Applicant's Response to Motion to Reopen); Rothman-Kuo Affidavit, Figures (Attached to Staff Pesponse to Motion to Reopen).
17/
Blume Testimony, fol. Tr. 5099 at 41, Figures 10 and
~
11; SER Supplement No.
7, at 3-18.
M / Applicant's Brief at 17-18; Staff Brief at 13ff.
' 4 Thus a number of apparently significant inconsistencies i
exist between the Imperial Valley data and the information presented during the Diablo Canyon seismic hearing.
- This, together with the fact that the Imperial Valley records pro-vide the best existing set of near-field strong motion data, make it appropriate -- indeed prudent -- to reopen the record to receive the new data in order to test the conclusions that flow from them against those made by the Board below as jus-tifying approval of the Diable facility's seismic design.
- 3. As we mentioned, the Imperial Valley Earthquake occurred on October 15, 1979.
Intervenors' expert witness, Dr. Brune, thereafter completed his review "in late February when he received the necessary data."
(Motion, p. 9.)
The motion to reopen was not filed, however, until March 28, 1980, before the appeal was argued but after it was briefed.
The staff and applicant contend that the motion to reopen was untimely.
We do not think so.
But even were we to aeree, "a matter may be of such gravity that the motion to reopen should be granted notwithstanding that it might have been 19/
20/
presented earlier."
In our judgment, that is the case here.--
~~
19/
Public Service Co. of Oklahoma (Black Fox Station, Units l and 2), ALAB-573, 10 NRC 775, 804 (1979), quoting Vermont
~~
Yankee, supra, ALAB-138, 6 AEC 520, 523 (1973).
20/
For the reasons explained in fn. 6, above, applicant's contention that a motion to reopen must rest on evidence in existence at the time of trial -- which would rule out any use of the IV-79 data -- is not well taken.
The Licensing Board had no opportunity to peruse the 4.
Imperial Valley seismic data, which we have now given close (if preliminary) examination.
This leaves us the more familiar with those aspects of the record challenged by the motion to In these circumstances, and in the interest of ex-reopen.
pedition -- for the plant is rapidly approaching completion and fairness entitles the applicant to learn as promptly as possible whether any reanalysis or redesign may be required --
we will conduct the reopened evidentiary hearing ourselves.
In an effort to frame the issues for that hearing, we have prepared and set out in an Appendix to this decision specific questions generally related to the 1979 Imperial Valley earth-We believe these encompass the intervenors' c'on-quake data.
cerns and include the matters this Board wishes to consider.
The parties should address them with written direct testimony by appropriately qualified witnesses.
(Unless it is already in the record, a statement of each witness qualifications should accompany his or her testimony.)
All testimony is to be filed with this Board and served no later than 45 days from the date of this decision.N Submission of testimony on matters other than answers f
21/
to our questions is permissible, provided that it is
~~
confined to topics directly relevant to the reopened issues.
~
l III.
l Joint Intervenors' second ground for reopening concerns the maximum credible earthquake that the Hosgri Fault is capa-ble of causing.
The Licensing Board determined it to be one of 7.5 magnitude, which the Board characterized as a "very l
conservative value for the safe shutdown earthquake."
10 NRC J
at 468 and 485.
Intervenors' motion rests on investigations conducted in 1979 by Mr. R. B. Leslic, a graduate student and a candidate for a master's degree in Earth Sciences (geology) at the University of California at Santa Cruz.
Mr. Leslie collected high-resolution seismic reflection data in shallow, near-shore areas proximate to the San Simeon and Hosgri fault These led him to conclude that the offshore extension zones.
of the San Simeon f ault zone "is 2 to 8 km wide and composed of numerous anastomosing (i.e., intercommunicating) fault strands," and that it "can be followed approximately 10 km southeastward from San Simeon Bay where it joins a strand of the Hos gri f ault zone. "
Leslie Affidavit, p. 5 (attached to Motion to Reopen).
Joint Intervenors argue in essence that the Board's con-clusion on earthquake magnitude rests on its assumption that the Hosgri Fault is not connected to any other, and that Mr.
]
Leslie's af fidavit invalidates that assumption.
They add that
the U.S. Geological Survey's evaluation of the Hesgri Fault agrees with the idea that earthquakes greater than magnitude 7.5 could occur there.
To support this proposition, inter-venors cite passages from a 1976 USGS report.
Intervenors misstate the Geological Survey's position.
The report on which they rely is in the record.d I
- When the (reproduced in the margin belows 2/)
are relevant excerpts read in context, there is no question that the Survey's testi-mony mirrors the Licensing Board 's finding -- viz., that the Hosgri Fault has not been shown capable of causing earthquakes greater than 7.5M.
And, contrary to intervenors ' assertions, the Geological Survey's expert testimony before the Board was that, even were the Hosgri Fault interconnected in the manner 22/
Supplement No. 4 to the staff's Safety Evaluation Re-port (SER) on the Diablo Canyon Facility, page C-1;
~~
intervenors rely on pages C-10 through C-14.
23/
"The suggestion that the Hosgri-San Simeon-San Gregorio f aults comprise a system capable of a magnitude 8 earth-
~~
quake is a legitimate and serious question, which has been considered since discovery of the Hosgri fault zone by Hoskins and Griffiths (1971).
It is our current judg-ment, however, based upon the data in the FSAR, data in the literature, some work in progress within the USGS, present concepts of earthquake source areas along the west coast of the U.S., and the arguments given above that such f aults have not been demonstrated to be capa-ble of generating magnitude 8+ earthquakes.
(FOOTNOTE CONTINUED ON NEXT PAGE)
f the Leslie affidavit now avers to be the case, tde entire system is of a kind unlikely to experience earthquakes above a 7.5 magnitude.3d/
Mr. Leslie's affidavit does not suggest (much less state) that the USGS erred in reaching that con-i
'clusion.
For that matter, Joint Intervenors themselves en-dorsed this USGS position in the proposed findings they sub-mitted to the Licensing Board.25!
Intervenors offer no sup-for their new view aside from the Leslie affidavit.
In port our judgment, the prof fered evidence is not of such a char-acter that, had it been introduced below initially, a differ-ent result might have obtained.
There is no occasion to re-open the record to consider it now.
IV.
Joint Intervenors' third argument for reopening makes the assertion that approval of the applicant's " environ-(FOOTNOTE CONTINUED FROM PREVIOUS PAGE) 23/
In essence the Hosgri, San Simeon, and San Gregorio f aults, even if parts of a common zone of deformation,
~~
have the dominant characteristics of subsidiary faults within the San Andreas system.
Such subsidiary faults have no record of or estimate of earthquakes larger than magnitude 7.5 on them."
24/
See fn. 23, supra.
25/
Joint Intervenors' Proposed Findings of Fact and Con-clusions of Law, 2245, 46 and 63 (filed March 25, 1979).
~~
4.
mental qualification program" E was unwarranted.
They allege that new information reveals that the program did not identify all the safety-related equipment involved at I
the Diablo Canyon facility and failed to take into account the effect of " aging" on that equipment's ability to func-tion properly.'
l The "new information" consists of two staff communi-l cations to the applicant.
The first, a letter dated November 2, 1979, sought additional material for an on-going staff review of standards applicable to certain in-strumentation and electrical equipment.
The passage relied upon appeared in an enc.osure with that letter and is repro-duced in the margin below. Y Intervenors construe the 26/
This " program" is a short-hand reference to the ability of safety-related equipment to withstand steam, heat, irradiation, humidity, and other adverse environmental conditions both in normal operation and in the event of an accident or other malfunction.
General guide-lines in this area appear in Appendices A and B to 10 C.F.R. Part 50; specific requirements are set forth in various Regulatory Guides and industrial standards described in section 3.11 of the staff's Standard Review plan, NUREG-75/087.
27/
"The FSAR Tables that identify the operational requirements of equipment which must function during and subsequent to
-~
the design basis accidents are general and are not suffi-ciently complete for purposes of docunenting equipment qualification parameters.
Therefore, provide a table list-ing of all Class IE safety-related equipment and appropriate qualification related. data for each as noted in the attach-ment.. This table should include all equipuent located both inside and outside of containment, including balance-of-plant and nuclear steam system supplied equipment."
l passage as specific staff rec'ognition "that the listing of equipment in the [ applicant's) Diablo Canyon [ Final Safety
- * *S$/
They' argue Analysis Report] was insufficient
- that because of this, the record must be reopened to con-sider the equipment not listed.
The staff responds that intervenors have drawn a uds-taken inference from the paragraph they cite.
The letter accompanying the enclosure was apparently intended to con-vey that all the staf f wanted from this applicant was oper-ating data for safety-related equipment which it had pre-viously. reported would be used at Diablo Canyon.
While the covering letter may have been ambiguous, the staff re-presents unequivocally that the applicant did identify every-thing it should have and indicates where that information can be located in the record.2[/
Intervenors mention no additional items of equipment that the applicant should have but did not identify; they rely simply upon the passage from the enclosure that accompanied the staf f 's letter.
Accordingly, their point is not well taken.
The other post-hearing staff communication that inter-
-l venors call our attention to is a February 25, 1980 notice to i
28/
Affidavit of R.B. Hubbard, p. 7 (attached to Joint Inter-
]
venors ' Motion to Reopen).
29/ Affidavit of Thomas G. Dunning, p. 2 (attached to the Staff Response to Intervenors' Motion to Reopen); Diablo Canyon FSAR Tables 3.11-1, 3.ll-1A and 2.11-2 and Tr. 8766-69.
I u
j
- I "All Construction Permit and Operating License Applicants."1S!
The notice apprised the addressees of a staff proposal for new generic standards (including ones pertaining to aging) on environmental qualifications of certain safety-related elec-trical equipment; transmitted the proposal to the addressees for review and cc=sent; and informed them of the staff's
" interim position" pending final adoption of the proposal.
If the staf f proposal-is adopted in its present form, it may require items of electrical equipment at Diablo Canyon 4=l to be "backfitted" to meet the new standards.
Joint Intervenors assert that these new standards repre-sent a significant departure from the position the staff espoused before the Licensing Board, and that the record must therefore be reopened to consider the change.
We do not agree.
The staf f itself inf ormed the Board of the pending proposals, which are based on work going back many years, and the Board took the prospect of their future adoption into consideration in its decision.l !
30/
NUREG-0 58 8 ; 45 Fed. Reg. 3124 (January 16, 1980).
_3_1/ The Board stated that (10 NRC at 506-07):
Testimony as to the seismic qualification of the Class I electric equipment was presented by NRC i
staff witness Faust Rosa.
(Testimony following Tr. 8748).
He also testified concerning aging, noting there previously had been no such require-ment but that did not make nuclear plants unsafe l
(FOOTNOTE CONTINUED ON NEXT PAGE) i
. A continuing staff effort to improve reactor safety standards is neither novel nor unexpected.
The fact that a new proposal is in the wind does not perforce warrant reopening a record.
For that result, there must be indi-cation in the "new evidence" that the decision on the existing record would permit the use of unsafe equipment 11/
(FOOT 50IE CONTINUED FROM PREVIOUS PAGE) because there are other things going on con-tinuously that would reveal the effects of age, such as seismic testing and normal. main _,_
- -~ ~
tenance.
(Tr. 8785, 8786).
The Staff;~never ~
theless, is conducting research programs and a systematic evaluation of older operating reactors to better determine the significance of aging in qualification testing.
This sub-ject will be reassessed by the Staff before natural aging could have any significant ef fect on the seismic qualification of equip-ment installed at Diabic Canyon.
(Rosa Testi-mony at 6-7).
It was also pointed out that there is nothing unique about rest of the equipment in a nuclear power plant and that a wealth of experience exists with this equip-ment in facilities around the wcrld which have been in existence the past ten, twenty or more years (Tr. 8790).
The Staff review of the seismic design of the Diablo Canyon plant was the most extensive ever undertaken by the Staff of the NRC.
(Knight Testimony at 54).
The Applicant's review was also extraordinarily thorough.
The Board finds that the Applicant has demonstrated through appropriate analysis and tests that-Category I structure [sJ, systems, and co=ponents will perform as required during the seismic load of the safe shutdown earthquake.
The Board finds that the Category I structures, systems, I
~and components will be adequate to assure (a) the in-tegrity of the reactor coolant pressure boundary, and (b) the capability to shut down the reactor and maintain it in a safe condition.
m m
m fm
1
. or create some other situation similarly fraught with danger to the public that merits immediate attention.
Intervenors do not suggest this to be the case here and the B6ard speci-fically stated that it was not.
10 NRC at 506.
- Moreover, in the event the new standards are adopted, they provide for 32 their application to existing reactors.
/
In the circum-stances, we find no cause in Joint Intervenors' submissions that warrants reopening the record on this subject.
._=.
The motion to reopen the record is granted to the extent provided in Part II, above; the parties are directed to file written testimony with this Board within 45 days on the ques-tions appended to this decision.
It is so ORDERED.
FOR TEE APPEAL BOARD b
4 AM C. Jea(
Bishop i
Secretary to the Appeal Board 32/
See 45 Fed. Reg. at 3121.
+
+-
~
. APPENDIX 1.
The October 15, 1979, Inperial Valley Earthquake (IV-7 9, M = 6. 4-6. 9 ) provided an extensive set of htrong motion L
j records in the near field of a rather severe earthquake.
The parties should compare the horizontal peak acceleration values recorded for various instrument positions with earlier predictions and compilations of such motion, e.g.,
those con-tained in the Final Safety Analysis Report (FSAR) on the Diablo Canyon Nuclear Power Plant, Amendment 50, Appendix D LL 11B, Figures 2, 3 and 4; and United States Geological Survey (USGS) Circular 795, Figures 4, 24, 47, and 48.
Those comparisons should (if possible) address whether there is magnitude inde-pendence or a saturation effect for ground motion intensity 34 /
in the near field of earthquakes.
2.
Response spectra have been developed from the near-field (1 to 11 km) ground motion records produced by IV-79.
The records contain horizontal peak acceleration values in the range of 0.81g to about 0.2g.
The applicant calculated a mean peak acceleration of 0.36g for IV-79 at the 5.8 km site-to-fault 33/
Preliminary Summary of the U.S. Geological Survey Strong-Motion Records from the October 15, 1979 Imperial Valley Earthquake by R.L. Porcella and R.B. Mathiesen (October 1979),:
included in Board Notification, December 17, 1979.
34/
See, for instance, Tr. 8597; 10,105; 5889-90.
4
- I distance that characterizes the Diablo Canyon site (Applicant's Brief).
Despite the fact that the IV-79 peak acceleration values are generally lower than the 1.15g peak aqceleration or 0.75g zero-period acceleration used as the design basis for the Diablo Canyon plant (resulting from a postulated 7.5M event on the Hosgri fault), there are instances (although only those from the El Centro Arrays are significant) for which the IV-79 horizontal responses exceed the Newmark Design Response Spectrum for Diablo Canyon.
(See staff brief at
"~pftf3sii~5ffidaviti"At%chrisdifs A%d B?)*ItFtfeWa" this,~~~S the parties should discuss whether the Newmark Spectrum is an appropriate and suf ficiently conservative representation of 35/
the 7.5M ev'ent at Hosgri.--
3.
We are told that IV-79 data are not relevant to the Diablo Canyon seismic analysis because that plant is a " rock" site, whereas the Imperial Valley data were obtained on soil sites.
(Rothman - Kuo Affidavit at p. 3; Blume Affidavit, Para. 8.)
What is the significance of this difference in view of the conclusion of the authors of USGS Circular 795 35/
In other words, if the various IV-79 near-field response spectra were used to generate a smoothed, average response spectrum for a zero-period acceleration appropriate to that event (in accordance with techniques explained in Blume's testimony fol. Tr. 6099 at page 6 and pages 39 and 40), and if this spectrum were scaled to a 0.75g zero-period accel-eration, would the resulting response spectrum be bounded by the Newmark Spectrum for Diablo Canyon?
(based on an analysis of data provided in that document) that, for comparable earthquake magnitude and. distance, there are no significant differences between peak horizontal accelera-tions measured on soil or rock?
(USGS Circular 795 at pages 1, 17, and 26.)
This question should be considered in light of statements by applicant's witness Blume to the effect that acceleration, rather than velocity or displacement, is the critical parameter in the design of Diablo Canyon (Blume Affidavit, Para. 9; Testimony fol. Tr. 6099, p. 33).
g 9.g =
.,c c ;.
tion values measured at IV-79 are generally comparable.
(Mean values calculated at a distance of 5.8 km from the fault are 36/
~
virtually identical. ) ~~
The response spectra developed for vertical motion within 11 km of the Imperial Fault during IV-79 appear to show generally equivalent values of vertical and horizontal response for periods less than about 0.2 seconds (i.e., frequencies in excess of 5 cps))2/
Finally, in some instances the higher frequency portions of the IV-79 response spectra for vertical motion exceed comparable portions of the 38/
-~
Diablo Canyon Design Response Spectrum.
Observations made of the IV-79 data and response spectra appear to be consistent with the criteria set forth in NRC l
36/
Blume Affidavit, Table 1, Figures 1 and 2.
f/
Rothman - Kuo Affidavit, Figures.
l 3 B/
Ibid.
i 1
I r-
These require that vertical accelera-tions in the higher frequency range be equal to horizontal accelerations.
As the guide states:
It should be noted that the vertical Design Response Spectra are 2/3 those of the horizontal Design Response Spectra for Frequencies less than 0.25; for frequencies higher than.3.5 they are the same, while the ratio varies between 2/3 and 1 for frequencies between 0.25 and 3.5.39/
The references to vertical motion made in the Diablo Canyon record, however, indicate that a 2/3 ratio between vertical-
- and horizontal mtiom uas:-apparently:n++? h*dre.a+ =M;fre-40/
qu encie s.~'-
The parties should address this apparent in-consistency and explain it, if possible.
Should there be substantive and relevant analyses suggesting that vertical motion records do not reflect the true vertical motion, these 41/
should be provided. ~
5.
Peak florizontal acceleration values measured at the base of the Imperial Valley Services Building during IV-79 exceed those measured in the free field 103 meters 39/
We note that elsewhere in the Regulatory Guide frequencies are presented with accompanying units of cycles per second (eps), and assume that these units are -inadvertently omitted in the portion we have quoted.
40/
SER Supplement 7, p. 3-18; Knight Testimony, p.13, fol.
Tr. 8 697, Ghio Test., p. 1, fol. Tr. 6993..Blume Testimony,
- p. 41, fol. Tr. 6099.
41/
See, for example, Newmark Testimony, fol. Tr. 8552, Reference B at pp. 4, 5; Tr. 9349.
4
'7' t
s away from the building.
The motion records are described as showing similar amplitudes but greater low frequency 42/
motion in the building than in the free field.
No response spectra for the two recording locations have been provided.
The acceleration data, however, may be taken to indicate that no reduction in building motion due to the tau effect was realized in this instance.
Based on these observations, intervenors question the validity of the tau concept as well as its use to reduce the m-r.m higher frequency portions of the Diablo Canyon Design spectrum.
The staff and the applicant answer that, because the Imperial County Services Building was supported on piles in a deep soil structure, these observations are irrelevant to the use of a tau ef fect in the seismic reanalysis of Diablo Canyon, 43/
which is built on a rock site.
Staff witness Newmark, however, used recorded earthquake motions at the Hollywood
)
Storace Building to demonstrate the use of a tau effect analy-44/
sis.
The Rollywood Storage Building itself is built on
-~
42/
See "A Preliminary Report on Strong-Motion Records from the Imperial County Services Building by Christopher
~~
Rojahn,U.S. Geological Survey and J.D. Ragsdale, Cali-fornia Division of Mines and Geology (undated but issued early January 1980), pp. 7 and 8.
g/
Blume Affidavit, Para.10; Rothman - Kuo Affidavit, p. 7.
44/
SER Supplement 5, Appendix C.
s.
piles in soil".
Thus, the " built-on-piles" rationale appears f
i insufficient to explain why no tau effect was evident at the Imperial Valley Services Building.
One feature distinguishing the two buildings that no party commented upon is that the Hollywood Storage Building has a basement and the ' Services Building does not.
Intervenors' witness, Dr. Luco, used this fact to explain in part why he Q/
believes the Hollywood building should have a large tau value.
Rojahn and Ragsdale's discussion implies that to some extent gYuli1Tbe1%Ttihinental responses within the' Imperial Valley Services Building may have been influenced by the response (and failure) of the building itself.
1 In any event, given the apparent similarities between the structural foundations of the two buildings, the expla-nations provided thus far for a seeming lack of a tau effect at the Imperial Valley Services Building are inadequate.
The parties should provide additional information on this point and relate their analyses to both geologic and structural conditions prevailing at the Diablo canyon site.
M/
Tr. 8949.
46/
Rojahn and Ragsdale, pp. 7 and 8.
That report also i
reflects information regarding the Services Building
~"-
assymetric structure (at pp. 2 and 3) which may ex-plain _ why it was susceptible to damage (see Newmark Testimony fol. Tr. 8552, Attachment B, pp. 14 and 15).
L 5
9
9
=
6.
Throughout the Licensing Board hearings, parties stressed the role of soil-structure -interactions as a mecha-nism that would reduce the magnitude of structure motion relative to ground motion (e.g., Tr. 8878; 8947-46).
Staff and applicant's arguments (in response to intervenors' suggest-ion of the apparent lack of tau effect during IV-79) point to soil structure interactions as the reason for building motion exceeding that of the ground (Blume Affidavit, Para.10; Rothman - Kuo Affidavit, p. 7).
(a) Describe and explain the N E~" Ecircumstances in which soil-structure interactions produce enhanced or reduced structural response.
(b) Discuss the rele-vance and applicability for such interactions to the seismic response assumed for Diablo Canyon.
7.
Intervenors (Brune Af fidavit, p. 5) and the applicant (Frazier Affidavit, Para. 3) have suggested that the strong motion data obtained from stations along the direction of the Imperial Fault evidence the " focusing" of earthquake motion.
Yet, when the acceleration data of two such stations, El Centro Array Numbers 6 and 7, are plotted as a function of distance from the f ault (e.g., Blume Affidavit, Figures 1 and 2), the horizontal acceleration values f all well below the regression line mean for the 1 km distance.
The vertical acceleration values are also lower than the mean on such a plot.
w
~.-.-w-e
+s
A l
To the extent possible, the parties should analyze the seismic records for the IV-79 earthquake as they pertain to j
the focusing phenomenon and relate the results of such analyses to the likelihood that, in the event of an earthquake anywhere along the Hosgri Fault, focusing might result in amplified seismic motion at Diablo Canyon.
8.
We have received preliminary reports of the effect of IV-79 on the El Centro Steam Power Station.
(Board Noti-fication December 17, 1979, Levin and Martore Observations; Rothman - Kuo Affidavit, p. 12).
In many respects, the structures and systems of that facility resemble those of the Diablo Canyon plant.
Their response to a severe, well instrumented seismic event can be analysed to help confirm or refute analytical techniques and assumptions used in the Diablo Canyon seismic analysis.
The parties should prepare and submit such an analysis.
9.
In addition to answering our questions about infor-mation from the Imperial Valley earthquake, we would like the parties to address Paragraph E on page 6 of the McMullen affidavit (included with the Staff. Response to Joint Intervenors' Motion to Reopen).
That paragraph states that, "in its geologic and seismologic review of the Point Conception LNG site, the USGS reported that ' Existing evidenee f avors association of 6
f 4
4
' ~
the 4 Nov.,1923 (M 7. 3) Lompoc earthquake with an east dipping reverse fault such as the Offshore Lompoc or similar reverse fault 10 km to the south that offsets the seafloor. '"
Does this USGS statement reflect either evidence not presented in the Diablo Canyon hearing or a change in the USGS position based on evidence already in the record?
In any event, discuss that statement's implications for this case.