Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20043A898 + (ML20043A898)
- RBG-32835, Application for Amend to License NPF-47,revising Min Temp Vs Reactor Pressure, Curves Contained in Section 3/4.4.6 & Associated Bases + (ML20043A900)
- ML20043A902 + (ML20043A902)
- ML20043A903 + (ML20043A903)
- ML20043A904 + (ML20043A904)
- ML20043A905 + (ML20043A905)
- ML20043A906 + (ML20043A906)
- ML20043A907 + (ML20043A907)
- ML20043A908 + (ML20043A908)
- 05000354/LER-1990-005-02, :on 900419,determined That Inoperability of Liquid Radwaste Discharge Monitor Not Reported in Recent Radioactive Effluent Release Rept.Caused by Procedural Deficiency.Effluent Rept Revised + (ML20043A909)
- ML20043A911 + (ML20043A911)
- IR 05000454/1990002 + (ML20043A914)
- ML20043A916 + (ML20043A916)
- ML20043A918 + (ML20043A918)
- ML20043A919 + (ML20043A919)
- ML20043A921 + (ML20043A921)
- ML20043A922 + (ML20043A922)
- 05000413/LER-1989-030-01, :on 890726,Tech Spec Violation Occurred Due to Shipment of Two Liners of Secondary Bead & Powdex Resin Mixture.On 891215,same Tech Spec Violation Occurred.Caused by Mgt Deficiency.Shipments Suspended + (ML20043A927)
- ML20043A933 + (ML20043A933)
- ML20043A935 + (ML20043A935)
- ML20043A936 + (ML20043A936)
- ML20043A942 + (ML20043A942)
- IR 05000413/1990009 + (ML20043A943)
- ML20043A947 + (ML20043A947)
- ML20043A949 + (ML20043A949)
- ML20043A950 + (ML20043A950)
- IR 05000348/1990009 + (ML20043A952)
- ML20043A953 + (ML20043A953)
- ML20043A954 + (ML20043A954)
- IR 05000302/1990012 + (ML20043A956)
- ML20043A959 + (ML20043A959)
- 05000333/LER-1990-015, :on 900420,discovered That Prerequisite Surveillance Test of source-range Monitors Not Performed Prior to Beginning Replacement of LPRMs on 900419.Caused by Procedure Deficiency.Lprm Procedure Revised + (ML20043A960)
- ML20043A961 + (ML20043A961)
- NRC-90-0074, Discusses Insp of Flash Tanks & Reactor Feed Pump Strainers. No Further Evidence of Moisture Separator Reheater Debris Discovered in Strainers,Stub Tubes,Wire Mesh or Structural Members + (ML20043A963)
- ML20043A964 + (ML20043A964)
- AECM-90-0089, Forwards Draft Tech Specs for Power Distribution Limits,Rcs, ECCS & Plant Sys as Part of Util Involvement W/Bwr Owners Group as BWR-6 Lead Plant + (ML20043A965)
- ML20043A966 + (ML20043A966)
- ML20043A969 + (ML20043A969)
- ML20043A971 + (ML20043A971)
- SNRC-1723, Advises That,Effective 900501,LJ Calone & Ja Notaro Will No Longer Need to Maintain Senior Operator Licenses + (ML20043A972)
- ML20043A973 + (ML20043A973)
- ML20043A974 + (ML20043A974)
- ML20043A976 + (ML20043A976)
- ML20043A977 + (ML20043A977)
- ML20043A978 + (ML20043A978)
- ML20043A980 + (ML20043A980)
- U-601670, Notifies That Wc Metzner Resigned from Position of Licensed Operator W/Util,Effective 900430 + (ML20043A981)
- U-601671, Ro:On 900508,discovered That Replacement Bellows Had Tie Rods Installed to Limit Bellows Expansion.Div I & II Diesel Generators Declared Inoperable & Controlled Plant Shutdown Initiated.Unusual Event Terminated on 900509 + (ML20043A982)
- ML20043A983 + (ML20043A983)
- IR 05000321/1990012 + (ML20043A985)
- HL-1111, Special Rept 90-002:on 900328,portions of Recirculation Pump Motor Generator Set Room Wall Declared Inoperable.On 900327,electrical Raceways Declared Inoperable Due to Damaged Fire Wrapping.Hourly Fire Watch Initiated + (ML20043A986)