ML20043A898

From kanterella
Jump to navigation Jump to search
Forwards Agenda for NRC Region I Radiation Protection Managers Conference on 900523-24 in King of Prussia,Pa. Agenda Items Include,Exposure Controls,Radiological Consequences of Unexpected Crud Bursts & Prenatal Exposure
ML20043A898
Person / Time
Site: Limerick  
Issue date: 05/02/1990
From: Knapp M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9005230255
Download: ML20043A898 (6)


Text

'l @

  • m

.a 9

!;c ML MAY 0 21990 Docket Nos. 50-352 50-353

.y Philadelphia' Electric Company ATTN: Mr. D. M. Smith V

Executive Vice President Nuclear

?ll Correspondence Control Desk P. O. Box 195 Wayne, PA.19087-0195 l Conference Attendees:

[.

Subject:

Radiation Protection Manager's Conference Enclosed is.the agenda for'the NRC Region I Radiation Protection Manager's-

' Conference..The conference was anneutced in my letter to you dated March 19, 1990.'.-The conference will be held at the Valley Forge Hilton, King of Prussia, Pennsylvania-on May 23-24,.1990, i

._I:look forward to your participation in this. conference, lL Sincerely,-

L 1

p t

9 p

Malcolm R. Kna p, Director-Division of Radiation Safety and Safeguards

Enclosure:

1' Agenda for.the Radiation Protection Manager's

' Conference i

i

-l a

1 3 j8252888#agggggs,

,f

-PDC

^

i

g.

.i 7

t Pk11adelph'iaElectricCoepany 2

AU4Y 0 2 1993-cc w/ enc 1:

R. J. Lees, Chairman, Nuclear Review Board

' G. M. Leitch, Vice President Limerick Generating. Station D. R. Helwig, Vice President of Nuclear Engineering and Services J. W Durham, Sr., Vice President and General Counc-111 Mi.J. McCormick, Jr., Manager - Limerick Generating Station G. A. -Hunger, Jr., Director - Licensing Section s

J. Doering, Project Manager - Limerick Generating Station J. F. O'Rourke, Manager - Limerick Quality Division T. B. Conner, Jr., Esquire.

G.-J. Maasen, Regulatory Engineer - Limerick Generating Station Public Document Room (PDR).

j local Public Document Room (LPDR)

Nuclear Safety Information Center (NaIC)

J NRC Resident Inspector Commonwealthlof Pennsylvania

?

+

r

.)-~

t 0FFICIAL RECORD COPY RAD PRO CONF - 0026.0.0 04/24/90

j V;;

ni

~ Philadelphia' Electric Company:

3 x.,

t/AY 0 21990

~bec w/ enc 1:

'Re5 on I Docket _ Room (with concurrences) 1

. Management' Assistant,-DRMA(w/oenc1) r; R.' Bellamy, DRSS Section Chief, DRP M. Conner (SALP Reports Only)

PAO-(2) SALP Reports Only.

J. Dyer, EDO

}

(!

.c 4

d 0FFICIAL RECORD COPY RAD PRO CONF - 0027.0.0 04/24/90 4

4 4

N:o

. :.4 c

r AGENDA REGION I RPM /NRC WORKSHOP Wednesday,-May 23, 1990 1

8:00 - 8:15 Workshop Welcome Dr. Malcolm Knapp, Director Division Of Radiation Safety andSafeguards(DRSS)

NRC Region I 8:15 - 8:30 Miating Format and Dr. Walter Pasciak, Chief Introduction of Moderators Facilities Radiation Protection Section, DRSS 8:30 - 8:45 NRR Comments Thomas Essig, NRR HQ Session 1 Exposure Controls Moderators and Discussion Leaders -

T. Cellmer -'Public Service Electric and Gas Company R. Nimitz - Nuclear Regulatory Commission 8:45 - 9:15 Radiological Consequences. of Unexpected I.rud Bursts 8:45 - 9:00 E. Cohen - Duquesne Light Canpany 9:00 - 9:15 R. Gary - Public Service Electric L

and' Gas Company

?

9:15 - 9:45 Status of the "New" 10 CFR 20 Including the Application of Beir V T. Essig - Nuclear Regulatory Commission L

9:45 - 10:00 Prenatal Radiation Exposure - Arbitrat'on L

J. Kelly - New York Power Authority 10:00 - 10:20 Break 10:20 - 11:00 Exposure of Fertile Females D. Chawaga

. Nuclear Regulatory Coinnission

'11:00 - 11:30 Dosimetry Placement L

R. Pederson - Nuclear Regulatory Commission 11:30 - 12:00 Open Discussion 1P:00 - 1:00 Lunch l

t

ge W

y, l

2 e

j Session 21 Contamination Control Nderators and Discussion Leaders B. Murray - Nuclear Regulatory Commission, Region IV H. Riley - Pennsylvania Power and Light Company 1:00- 1:30- Current Status of Hot Particle Efforts and Impact onl Enforcement T. Essig - Nuclear Regulatory Commission, HQ y

1:30 - 2:00 Ingestion of a Hot Particle P. Volza - Niagara Mohawk Power Corporation 2:00 - 2:20 Break

.1 2:20 - 3s00 Respiratory Protection Program Issues R. Pederson - Nuclear Regulatory Comission, HQ 3:00 -:3:30 Radiological Controls for Steam Generator Work J. Wray, Public Service Electric and Gas Company -

3:30 - 4:00 Open Discussion Thursday, May 24 1990 Session 3 Administrative Issues and NP.C Policy Moderators and Discussion Leaders-T. Dragoun - Nuclear Regulatory Commission, Region I R. Dubiel - Philadelphia Electric Company

.8:00 - 8:15 The New EPA Emission Standards and the NRC T. Essig - Nuclear Regulatory Comission, HQ '

8:15 - 8:30 Posting of Radioactive Material Storage Areas R. Nimitz - Nuclear Regulatory Commission, Region I 8:30 - 9:00 Self Assessments and Training Program Improvements H. Riley - Pennsylvania Power and Light Company 9:00 - 9:30 Converting RETS to an ODCM and Environmental Monitoring s

T. Essig-- Nuclear Regulatory Commission, HQ 9:30 - 10:00 Brookhaven ALARA Activities J. Baum/T. Kahn - Breakhaven National Lab 10:00 - 10:20 Break' 10:20 - 11:00 Dosimetry Testing - Status of the Revised ANSI Standard Dr S. Sherbini - Nuclear Regulatory Commission l

r-k i

Fa*

t' 3

i e

ps

-11:00 - 11:30 Health Physi::s Audits s

B. Murray,iluclear Regulatory Commission, Region IV 11:30 - 12:00 Open discussion 12:00.- 1:00 Lunch Moderators and Discussion Leaders Dr. S. Sherbini - Nucleier Regalatory Commission-D. Quinn - New York Power Authority 1:00 - 1:30 Use of 10 CFR 20.302 including Disposal of Sewage Sludge-

[

T. Essig - Nuclear Regulatory Commission-1:30 - 2:00 Determination of Dose P. O'Connell - Nuclear Regulatory Commission 2:00 - 2:20 Break 2:20 - 3:00 Hioh Radiation Area Access Control Requirements.

T. Dragoun - Nuclear Regulatory Commission 3:00 - 3:30-Open Discussion 3:30 - 3:45 Concluding Remarks Dr. R. bellamy, Nuclear Regulatory Commission, Region I L

L I

I I

.