Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000369/LER-1981-167, Forwards LER 81-167/03L-0 + (ML20033B873)
- ML20033B875 + (ML20033B875)
- ML20033B878 + (ML20033B878)
- ML20033B880 + (ML20033B880)
- ML20033B881 + (ML20033B881)
- ML20033B882 + (ML20033B882)
- 05000369/LER-1981-165-01, /01T-0:on 811008,stud Matl & Grade 8 Nuts Purchased for Use on Spent Fuel Cooling Sys Strainers Were Unaccounted for & Possibly Installed in Wrong Flanges.Caused by Procedural Inadequacies & Personnel Errors + (ML20033B883)
- ML20033B884 + (ML20033B884)
- 05000369/LER-1981-167-03, /03L-0:on 811016,investigation of Loss of Sample Flow Alarm on Unit Vent Airborne Radiation Monitors Revealed Electric Motor for Operating Sys Vacuum Pump Did Not Rotate & Emitted Sparks.Caused by Burned Up Motor + (ML20033B885)
- AECM-81-460, Final Deficiency Rept Re Const Damage to Cables in Conduit, Initially Reported 810519.All Damage to Cables Was Minor. Cables W/Nicks or Cuts Have Been Repaired or Replaced. Deficiency Not Reportable Per 10CFR50.55e + (ML20033B886)
- ML20033B887 + (ML20033B887)
- ML20033B888 + (ML20033B888)
- AECM-81-441, Interim Deficiency Rept Re Inadequate Shielding Between Main Steam Tunnel & Auxiliary Bldg.Lack of Coordination & Human Error in Describing Criteria Change Is Probable Cause.Final Rept Expected 820104 + (ML20033B889)
- ML20033B890 + (ML20033B890)
- ML20033B891 + (ML20033B891)
- ML20033B892 + (ML20033B892)
- ML20033B893 + (ML20033B893)
- ML20033B894 + (ML20033B894)
- ML20033B895 + (ML20033B895)
- ML20033B896 + (ML20033B896)
- ML20033B897 + (ML20033B897)
- ML20033B898 + (ML20033B898)
- ML20033B899 + (ML20033B899)
- ML20033B900 + (ML20033B900)
- ML20033B901 + (ML20033B901)
- ML20033B902 + (ML20033B902)
- ML20033B904 + (ML20033B904)
- 05000327/LER-1981-128, Forwards LER 81-128/03L-0 + (ML20033B906)
- ML20033B908 + (ML20033B908)
- 05000327/LER-1981-128-03, /03L-0:on 811026,pressurizer Power Operated Relief Valve 1-PCV-68-340A Found Leaking to Pressurizer Relief Tank.Apparently Caused by Improper Adjustment of Valve Stem Operator Coupling.Stem Coupling Adjusted + (ML20033B909)
- ML20033B910 + (ML20033B910)
- ML20033B911 + (ML20033B911)
- ML20033B912 + (ML20033B912)
- ML20033B913 + (ML20033B913)
- ML20033B914 + (ML20033B914)
- ML20033B915 + (ML20033B915)
- ML20033B916 + (ML20033B916)
- ML20033B919 + (ML20033B919)
- ML20033B920 + (ML20033B920)
- ML20033B921 + (ML20033B921)
- ML20033B922 + (ML20033B922)
- ML20033B923 + (ML20033B923)
- ML20033B924 + (ML20033B924)
- ML20033B925 + (ML20033B925)
- ML20033B927 + (ML20033B927)
- ML20033B928 + (ML20033B928)
- ML20033B929 + (ML20033B929)
- ML20033B930 + (ML20033B930)
- IR 05000309/1981015 + (ML20033B931)
- ML20033B932 + (ML20033B932)
- ML20033B933 + (ML20033B933)