Informs of Intentions to Proceed W/Dismantling Plan for Facility.Fuel Removal & Shipment to ORNL Scheduled for Middle of Feb 1982.Lists Details of Dismantling Procedure & Individuals Involved
ML20033B891
Person / Time
Site: 05000394
Issue date: 11/24/1981
From: Adamson R
CALIFORNIA POLYTECHNIC STATE UNIV., SAN LUIS OBISPO
To: Stolz J
Office of Nuclear Reactor Regulation
References
NUDOCS 8112020402
Download: ML20033B891 (2)


Text

.

CALIFORNlA POLYTEClINIC STATE UNJ\\/ERSITY S AN 1.I'lF OH!510, C ALIFORNI A uMm g

(8051 546 0111

~

g

,@&mm%g v

M

<r m

November 24, 1981

,f V

it

't Director

~

DEC.I 1

84 s, %

lh Division of Operating R2 actors N an D Office of Nuclear Reactor Regulation Y Tph@

U.S. Nuclear Regulatory Cocmission S

Washington, D.C.

20555 Attn: Mr. John F. Stolz, Chief, Operating Reactors Branch #4

Subject:

Docket No. 50-394, License No. R-121 Progress Report for Dismantling Plan This is to inform you of our intentions to proceed with the Dismantling Plan for our AGN-201 reactor, which was approved by P. B. Erickson's letter of Oct. 6, 1981. Tentatively we are scheduling fuel removal and shipnent to ORNL about the middle of February 1982.

As suggested by Mr. Collins, Directorate of Licensing, we will have supervision of the dismantling procedure under a currently licensed Senior Reactor Operator. The individual proposed is a local resident, Robert L. Fisher, who has been licensed by the NRC for the following reactors:

Triga (Pennsylvania State University) - License # SOP-2619 Dresden Power Station, Unit 2

  1. SCP-3211 Diablo Canyon, PG&E, Unit 1
  1. SOP-3%1 In addition, he holds a B.S. in M.E. from Pennsylvania State and recently has taken courses in Radiological Control and Protection in preparation for the operation of Unit 1 of Diablo Canyon Project.

Currently he is studying the pertinent documents for the AGN-201 and will soon be familiarizing himself with the equipment and instrumentation in our Nuclear Reactor Facility on campus.

To assist the SRO in carrying out the Plan, there will be a group of four University employees with expertise in the various areas of concern, i.e., John Pickering as Radiation Safety Officer, Dr. A. Rosen in Health Physics, M. Weber as M.E. Lab Technician, and R. Adamson as Reactor Administrator.

There is to be a rehearsal involving these individuals before proceeding with fuel removal; preliminary work will be done on sampling, surveying and calibration of the instruments.

8112020402 811124 dgo PDR ADOCK 05000394 P

PDR Tllii C Al.lFORNI,\\ F i AT!! I TliT.l:51 n P ml I.!Ml;g 890

Docket bb. 50-394, License No. R-121 Progress Report for Dismantling Plan Novenber 24, 1981 Page 2 Packaging of the fuel for shipment in approved containers is to be carried out as it is unloaded. Shipnent of the fuel containers is to be in accordance with instructions from DOE at ORNL, which have not been received as yet.

It is hoped that fuel removal and packaging can be coupleted in less than one working day in order to minimize demands on the various volunteers as well as the Inspector and Health Physics representatives from Region V, USNRC.

Should there be questions, cournents or advice about our proposal, I would appreciate hearing them as soon as possible.

Sincerely, 0b11W Robert W. Adamson, Reactor Administrator and Professor Aeronautical and Mechanical Engineering Department cc: Peter B. Erickson, Operating Reactors Branch #4, USNRC R. H. Engelken, Director, Region V, USNRC 1990 N. California Boulevard, Suite 202 Walnut Creek Plaza, Walnut Creek, CA 94596 Attn Phil Johnson and Amelio Garcia Paul Collins, Director for Operating Reactors Division of Licensing, US?RC washington, D.C. 20555 Please advise if additional information is needed in order to grant an extension or waiver for licensee R. L. Fisher.

Malcolm Theysen, Spent Fuel Storage Section, D.O.E.

Oak Ridge National Laboratory, Oak Ridge, TN 37830 Please forward written instructions regarding shiping and containers to be furnished for AGN-201 spent fuel.

R. L. Fisher, SRO Unit #1, Diablo Canyon Pacific Gas & Electric Company P.O. Box 56 Avila Beach, CA 93424

-