Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20023B781 + (ML20023B781)
- ML20023B783 + (ML20023B783)
- ML20023B784 + (ML20023B784)
- ML20023B785 + (ML20023B785)
- ML20023B786 + (ML20023B786)
- ML20023B787 + (ML20023B787)
- PNO-I-83-045, on 830503,shutdown Initiated Due to Containment Pressure Increase to 0.6 Psi & Unidentified Containment Leakage of 5.4 Gpm.Recirculation Pump Cooling Water Leakage Noted + (ML20023B789)
- 05000254/LER-1983-016, Forwards LER 83-016/03L-0 + (ML20023B793)
- ML20023B794 + (ML20023B794)
- ML20023B795 + (ML20023B795)
- 05000254/LER-1983-016-03, /03L-0:on 830331,reactor Operator Found RHR Discharge Pressure Greater than 90 Psig,Exceeding Tech Spec Range.Caused by Valve Leaking from Condensate Transfer Sys Into RHR Discharge Piping.Mod Implemented + (ML20023B796)
- ML20023B797 + (ML20023B797)
- ML20023B798 + (ML20023B798)
- ML20023B799 + (ML20023B799)
- 05000373/LER-1983-033, Forwards LER 83-033/03L-0 + (ML20023B800)
- ML20023B801 + (ML20023B801)
- ML20023B802 + (ML20023B802)
- ML20023B803 + (ML20023B803)
- ML20023B804 + (ML20023B804)
- ML20023B806 + (ML20023B806)
- ML20023B807 + (ML20023B807)
- ML20023B808 + (ML20023B808)
- IR 05000275/2019004 + (ML20023B809)
- ML20023B811 + (ML20023B811)
- 05000315/LER-1983-028-03, /03L-0:on 830331,after Completion of Surveillance Test on Solid State Protection Sys Train a & Review by Maint Supervisor,Sys Declared Inoperable to Troubleshoot Possible Problem W/Safety Injection Reset Time Delay + (ML20023B812)
- ML20023B813 + (ML20023B813)
- 05000315/LER-1983-029-03, /03L-0:on 830405,control Room Access Fire Door 412 Would Not Operate Properly.Caused by Extension Rod Being Pulled Loose from Door Frame Shoe.Shoe Set Screws Replaced & Extension Rod Reinstalled + (ML20023B815)
- ML20023B816 + (ML20023B816)
- ML20023B818 + (ML20023B818)
- 05000315/LER-1983-030-03, /03L-0:on 830402,while on Tour,Security Guard Discovered Diesel Room AB Cardox Sys Isolated W/No One in Room.Caused by Personnel Error.Operator Instructed on Proper Procedures for Exiting Carbon Dioxide Protected Areas + (ML20023B819)
- ML20023B820 + (ML20023B820)
- 05000237/LER-1983-024, Forwards LER 83-024/03L-0 + (ML20023B821)
- ML20023B822 + (ML20023B822)
- IR 05000295/1983006 + (ML20023B823)
- ML20023B824 + (ML20023B824)
- ML20023B826 + (ML20023B826)
- 05000237/LER-1983-024-03, /03L-0:on 830403,while Performing Core Spray Operability Test,Valve Mo 1402-4A Failed to Open.Caused by Burned Out Motor.Motor Replaced + (ML20023B827)
- A03124, Responds to 830316 Request for Plans for Cycle 6 Reload Outage Steam Generator Insp.Tube Defect Assessment & Supplementary Steam Generator Testing Program Tables Encl + (ML20023B828)
- ML20023B829 + (ML20023B829)
- 05000220/LER-1981-053, Forwards LER 81-053/03L-1 + (ML20023B830)
- ML20023B831 + (ML20023B831)
- 05000220/LER-1981-053-03, /03L-1:on 811120,discovered That Single Failure of Electrical Power Supply Could Either Isolate Both Condenser Sys or Cause Failure to Isolate.Logic for Initiation & Isolation of Condenser Sys Reviewed + (ML20023B832)
- ML20023B833 + (ML20023B833)
- RBG-14-887, Interim Deficiency Rept DR-105 Re Electrical Separation of Reactor Protection Sys Wiring from NSSS Shutoff Wiring. Initially Reported on 830329.Investigation Incomplete.Next Rept Expected by 830701 + (ML20023B834)
- ML20023B835 + (ML20023B835)
- ML20023B836 + (ML20023B836)
- ML20023B837 + (ML20023B837)
- ML20023B840 + (ML20023B840)
- 05000295/LER-1983-004, Updated LER 83-004/99X-1,canceling Original Rept + (ML20023B842)
- ML20023B850 + (ML20023B850)
- ML20023B854 + (ML20023B854)