Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000443/LER-1990-010, :on 900305,actuation of Control Room Emergency Air Cleanup & Filtration Subsystem Occurred.Caused by Moisture in Detector Housing.Air Intake Monitors Cleaned & Desiccant Placed in Housing + (ML20012F518)
- ML20012F519 + (ML20012F519)
- ML20012F520 + (ML20012F520)
- 05000328/LER-1990-006, :on 900307,containment Ventilation Isolation Occurred.Caused by Containment Particulate Level Too Close to Setpoint.Module Replaced.Radiation Alarm Setpoint Increased from 10% to 40% of Tech Spec Limit + (ML20012F522)
- ML20012F523 + (ML20012F523)
- ML20012F524 + (ML20012F524)
- ML20012F526 + (ML20012F526)
- ML20012F527 + (ML20012F527)
- ML20012F529 + (ML20012F529)
- ML20012F530 + (ML20012F530)
- ML20012F532 + (ML20012F532)
- ML20012F533 + (ML20012F533)
- ML20012F534 + (ML20012F534)
- ML20012F536 + (ML20012F536)
- ML20012F537 + (ML20012F537)
- ML20012F538 + (ML20012F538)
- SNRC-1709, Discusses Layup Implementation Program & Site Characterization Program for Plant.Util Intends to Remove Neutron Instrumentation & Other Selected Reactor Pressure Vessel Internals in Order to Obtain More Accurate Profile + (ML20012F539)
- ML20012F540 + (ML20012F540)
- ML20012F541 + (ML20012F541)
- ML20012F542 + (ML20012F542)
- ML20012F545 + (ML20012F545)
- ML20012F547 + (ML20012F547)
- ML20012F548 + (ML20012F548)
- W3P90-0268, Advises That Util Installed Two Addl Benchmarks for Use as Part of Basemat Surveillance Program to Increase Efficiency of Survey Readings.New Benchmarks Will Be Shown on FSAR Figure 1.2.1 as Part of Next FSAR Rev + (ML20012F549)
- ML20012F551 + (ML20012F551)
- ML20012F553 + (ML20012F553)
- ML20012F554 + (ML20012F554)
- ML20012F556 + (ML20012F556)
- ML20012F557 + (ML20012F557)
- ML20012F558 + (ML20012F558)
- ML20012F559 + (ML20012F559)
- BECO-90-047, Responds to Generic Ltr 89-13 Re Svc Water Sys Problems Affecting safety-related Equipment.Util Instituted Biofouling Control Program in 1982 & Program Has Been Effectively Implemented at Plant & Complies W/Generic Ltr + (ML20012F560)
- ML20012F561 + (ML20012F561)
- ML20012F564 + (ML20012F564)
- IR 05000309/1990003 + (ML20012F566)
- ML20012F568 + (ML20012F568)
- ML20012F569 + (ML20012F569)
- ML20012F570 + (ML20012F570)
- ML20012F571 + (ML20012F571)
- ML20012F572 + (ML20012F572)
- TXX-9011, Final Deficiency Rept CP-90-005 Re Installed Fuse Types & Sizes Not Consistent w/one-line Drawings.Intially Reported on 900305.Fuses Removed & Reinstalled to Deenergize or Reenergize Circuits or Equipment,Per Clearance Procedure + (ML20012F573)
- 05000368/LER-1990-006, :on 900305,instrumentation Channels Declared Inoperable,Resulting in Manual Actuation of Reactor Protection Sys.Caused by Procedural Deficiencies.Functional Tests of Log Power Level Channels Performed + (ML20012F574)
- 05000293/LER-1990-003, :on 900311,automatic Actuation of Main Steam Sys Group 1 Portion of Primary Containment Isolation Control Sys Occurred.Caused by False High Reactor Vessel Water Level Signal.Procedure Developed Re Backfill + (ML20012F575)
- ML20012F576 + (ML20012F576)
- 05000245/LER-1990-002-01, :on 900305,main Steam Line High Flow Setpoint Determined to Be Incorrect & Nonconservative.Caused by Use of Incorrect Assumptions Based on Original Plant Design Conditions.Setpoint Corrected + (ML20012F578)
- ML20012F579 + (ML20012F579)
- ML20012F580 + (ML20012F580)
- IR 05000254/1990004 + (ML20012F582)
- ML20012F583 + (ML20012F583)
- ML20012F585 + (ML20012F585)
- ML20012F586 + (ML20012F586)