Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/LER-1981-036, Forwards LER 81-036/03L-0 + (ML20009F557)
- ML20009F558 + (ML20009F558)
- ML20009F559 + (ML20009F559)
- 05000259/LER-1981-036-03, /03L-0:on 810619,during Biaxial Seismic Switch Tests,Seismic Trigger Hst a Failed to Operate.Caused by Relay Transistor Failure Due to Moisture Condensation Inside Housing.Trigger Repaired + (ML20009F560)
- 05000321/LER-1981-050, Forwards LER 81-050/03L-0 + (ML20009F561)
- ML20009F562 + (ML20009F562)
- ML20009F563 + (ML20009F563)
- ML20009F564 + (ML20009F564)
- ML20009F565 + (ML20009F565)
- 05000321/LER-1981-050-03, /03L-0:on 810612,while Performing RHR Valve Operability,Containment Spray Isolation Valve B Found Inoperative.Caused by Incorrect Installation of Motor Pinion Gear.Motor Pinion Gear Reinstalled + (ML20009F566)
- ML20009F567 + (ML20009F567)
- ML20009F568 + (ML20009F568)
- ML20009F569 + (ML20009F569)
- ML20009F570 + (ML20009F570)
- 05000321/LER-1981-056, Forwards LER 81-056/03L-0 + (ML20009F571)
- ML20009F572 + (ML20009F572)
- 05000321/LER-1981-056-03, /03L-0:on 810610,during Startup,Offgas Hydrogen Analyzer 1N62-N009A Was Reported Inoperative.Caused by Personnel Error.Root Valve N62-F064 a Was Found Closed. Valve Opened + (ML20009F573)
- ML20009F574 + (ML20009F574)
- ML20009F575 + (ML20009F575)
- ML20009F576 + (ML20009F576)
- ML20009F577 + (ML20009F577)
- ML20009F578 + (ML20009F578)
- ML20009F580 + (ML20009F580)
- ML20009F581 + (ML20009F581)
- ML20009F582 + (ML20009F582)
- ML20009F583 + (ML20009F583)
- ML20009F585 + (ML20009F585)
- ML20009F586 + (ML20009F586)
- L-81-288, Deficiency Rept,Originally Reported on 810610,re Linear Indications in Reactor Coolant Pump 2A1 Volute.Further Info Needed Re Size & Depth of Excavations Required to Remove Linear Indications.Final Rept Will Be Submitted 810810 + (ML20009F587)
- L-81-249, Interim Deficiency Rept,Originally Reported on 810312,re Failure to Follow Established Procedure When Interpreting Radiographs of safety-related Welds.Required Repair Work Not Yet Completed.Final Rept Delayed Until 810731 + (ML20009F588)
- ML20009F589 + (ML20009F589)
- 05000335/LER-1981-031, Forwards LER 81-031/03L-0 + (ML20009F591)
- ML20009F594 + (ML20009F594)
- 05000335/LER-1981-031-03, /03L-0:on 810605,electrical Ground Occurred on 125-volt Dc Bus B.Caused by Grounded Coil in Faulty Electrohydraulic Actuator for Governor Valve.Spare Actuator Installed + (ML20009F595)
- ML20009F596 + (ML20009F596)
- 05000369/LER-1981-067, Forwards LER 81-067/03L-0.Detailed Event Analysis Encl + (ML20009F597)
- ML20009F598 + (ML20009F598)
- ML20009F599 + (ML20009F599)
- 05000296/LER-1981-032, Forwards LER 81-032/03L-0 + (ML20009F600)
- ML20009F601 + (ML20009F601)
- 05000369/LER-1981-067-03, /03L-0:on 810425,while in Mode 3 Initial Fuel Loading,Boron Concentration in Upper Head Injection Accumulator Sys Was 2,153 Parts Per Meter.Caused by Insufficient Purging Before Sampling.Pressure Reduced + (ML20009F602)
- ML20009F603 + (ML20009F603)
- 05000296/LER-1981-032-03, /03L-0:on 810701,leak Discovered at Vent Nipple of RHR Pump Room Cooler 3A.Cause Unknown.Crack Was Silver Soldered + (ML20009F604)
- ML20009F606 + (ML20009F606)
- 05000366/LER-1981-051, Forwards LER 81-051/03L-0 + (ML20009F607)
- ML20009F608 + (ML20009F608)
- 05000369/LER-1981-068, Forwards LER 81-068/03L-0.Detailed Event Analysis Encl + (ML20009F609)
- 05000369/LER-1981-069, Forwards LER 81-069/03L-0.Detailed Event Analysis Encl + (ML20009F613)
- ML20009F615 + (ML20009F615)
- ML20009F616 + (ML20009F616)
- ML20009F617 + (ML20009F617)