ML20009F598

From kanterella
Jump to navigation Jump to search
Forwards LER 81-067/03L-0.Detailed Event Analysis Encl
Date released: 01/23/2020 Download: ML20009F598


LER 81-067/03L-0:on 810425,while in Mode 3 Initial Fuel Loading,Boron Concentration in Upper Head Injection Accumulator Sys Was 2,153 Parts Per Meter.Caused by Insufficient Purging Before Sampling.Pressure Reduced
ML20009F602
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/25/1981
From: Ouellette R
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F602 (1)
Forwards LER 81-067/03L-0.Detailed Event Analysis Encl
ML20009F597
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 05/22/1981
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20009F597 (2)