First Interim Deficiency Rept,Originally Reported on 810529, Re Failure to Implement Alternate Analysis Design Criteria for Pipe Analysis & Supports.Util Presently Identifying Affected Piping Sys.Next Rept by 810929
ML20009F586
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 06/29/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8107310334
Download: ML20009F586 (2)


Text

~

~OFFIC M Lc, y y 400 Chestnut Street Tower II ,

June 29, 1981 .

BLRD-50-438/81-42 dQ fg BLRD-50-439/81-44 // '(sY f 9,

$ ({bul,i '3 a

!- JUL '~ 01981 '" ,

hr. Jr.mes P. O'Reilly, Director , ,,.cc -;

Office of Inspection and Enforcement (~6,u. mu

^

U.S. Nuclear Regulatory Commission \/

itegion II - Suite 3100 101 Marietta Street

\k/- f Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONIE NUCLEAR PLANT Ul:ITS 1 AND 2 - FAILURE TO IMPLEMENT ALTERNATE ANALYSIS DESIGN CRITERIA - BLRD-50-430/81 '42, BLRD-50-439/81 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Celenjak on May 2o, 1981 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8112. Enclosed is our first interim report. We expect to submit our next report by Septemoer 29, 1981.

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Regulation and Safety Enclosure cc: Mr. Victor Stello, Jr., Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 r#'/

Si j 8107310334 810629 PDR ADOCK 05000438 s PDR

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 FAILURE TO IMPLEMENT ALTERNATE ANALYSIS DESIGN CRITERIA BLRD-50-438/81-42, BLRD-50-439/81-44

~

1J CFR 50.55(e)

FIRST INTERIM REPORT 2pseriotion of the Deficiency TVA employees have failed to conform to criteria as defined in TVA topical report CEB 76-11, " Alternate Criterf a For Pipe Analysis and Supports." We did not adhere to the spacing requirements for axial pipe supports as defined in CEB 76-11. Further investigation of this problem showed no indication that this nonconformance is applicable to other TVA nuclear plants.

Interim Progress TVA is in the process of identifying the piping systems which are affected by the subject deficiency. These piping systems will be reanalyzed by rigorous analysis checking the piping stress and the support loads. TVA has initiated action to instruct those individuals involved in alternate analysis calculations that all the requirements of the alternate analysis criteria must be strictly followed.

,