Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20003G589 + (ML20003G589)
- ML20003G591 + (ML20003G591)
- ML20003G592 + (ML20003G592)
- ML20003G593 + (ML20003G593)
- ML20003G594 + (ML20003G594)
- ML20003G595 + (ML20003G595)
- IR 05000338/1980038 + (ML20003G596)
- ML20003G597 + (ML20003G597)
- ML20003G598 + (ML20003G598)
- ML20003G599 + (ML20003G599)
- ML20003G600 + (ML20003G600)
- ML20003G601 + (ML20003G601)
- ML20003G602 + (ML20003G602)
- ML20003G603 + (ML20003G603)
- ML20003G604 + (ML20003G604)
- ML20003G605 + (ML20003G605)
- ML20003G607 + (ML20003G607)
- A01548, Responds to NRC Re Violations Noted in IE Insp Rept 50-213/80-22.Corrective Actions:Label Prepared for Lab Reagent Stock Bottles,Indicating Reagent Identification, Date Prepared,Preparer & Date Expired + (ML20003G609)
- ML20003G610 + (ML20003G610)
- ML20003G611 + (ML20003G611)
- ML20003G612 + (ML20003G612)
- ML20003G613 + (ML20003G613)
- 05000366/LER-1981-025, Forwards LER 81-025/03L-0 + (ML20003G614)
- ML20003G615 + (ML20003G615)
- IR 05000213/1980022 + (ML20003G616)
- ML20003G617 + (ML20003G617)
- 05000366/LER-1981-025-03, /03L-0:on 810403,loss of Secondary Containment Occurred During Normal Operation.Caused by Inadvertent Drilling Through Containment Wall for Pipe Penetration.Hole Sealed W/Thaxton Plug & Tested + (ML20003G618)
- ML20003G619 + (ML20003G619)
- ML20003G620 + (ML20003G620)
- ML20003G621 + (ML20003G621)
- ML20003G623 + (ML20003G623)
- 05000331/LER-1980-011, Forwards Updated LER 80-011/01X-1 + (ML20003G624)
- ML20003G625 + (ML20003G625)
- ML20003G626 + (ML20003G626)
- ML20003G627 + (ML20003G627)
- ML20003G628 + (ML20003G628)
- ML20003G629 + (ML20003G629)
- ML20003G630 + (ML20003G630)
- TXX-3301, Informs That Preservice Exam Requirements Have Been Incorporated in QA Program & Will Be Performed by QC Personnel.Preservice Insp Will Be Verified Completed within Six Months of Preoperational Testing + (ML20003G632)
- ML20003G633 + (ML20003G633)
- 05000331/LER-1980-012, Forwards Updated LER 80-012/01X-1 + (ML20003G634)
- ML20003G635 + (ML20003G635)
- ML20003G636 + (ML20003G636)
- ML20003G641 + (ML20003G641)
- ML20003G642 + (ML20003G642)
- ML20003G644 + (ML20003G644)
- ML20003G645 + (ML20003G645)
- PNO-I-81-056, on 810423,individual Received 1.529 Rem Whole Body Exposure During Control Rod Drive Removal,Resulting in Total Second Quarter Exposure of 3.183 Rem.Caused by Inadvertent Dropping of TLD Badge Near Reactor Drain Line + (ML20003G646)
- ML20003G647 + (ML20003G647)
- ML20003G648 + (ML20003G648)
- ML20003G649 + (ML20003G649)