ML20003G636

From kanterella
Jump to navigation Jump to search
Requests That Response Date for Info Re Incorporation of ANSI Requirements Into Contractor Storage Procedures Be Delayed Until 810313,due to Complexities of Involved Conditions
ML20003G636
Person / Time
Site: Satsop
Issue date: 02/20/1981
From: Dobson D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20003G631 List:
References
GO3-81-531, NUDOCS 8104300322
Download: ML20003G636 (1)


Text

_

oq Y -

y P Washington Public Power Supply System A JOINT OPERATING AGENCY r.o.soxi222 itua. w4ssiscros ,es4 enose r2o6: 24,.sooi February 20, 1981 G03-81-531 Nuclear Regulatory Commission, Region V Suite 202, Walnut Creek Plaza 1990 North California Boulevard Walnut Creek, California 94596 Attention: Mr. G. S. Spencer Chief, Reactor Construction and Engineering Support Branch Gentl emen:

Subject:

WPPSS NUCLEAR PROJECTS 3 AND 5 NRC INSPECTION OF WNP-3 AND WNP-5 DOCKET NUMBERS 50-508 AND 50-509

References:

1) Letter, R. H. Engelken to R. L. Ferguson,

. NRC Inspection at Washinton Nuclear Projects Nos. 3 and 5 dated, October 21, 1980.

2) Letter, G. S. Spencer to F. D. Elwee, same subject, dated November 6,1980. ;p8 N"d /
3) Letter, G. S. Spencer to F. D. Elwee, same subject, dated January 6,1981.

The NRC requested information relative to incorporation of ANSI requirements into contractor storag' procedures in reference 3. These responses will not be completed by the requested date, due to the complexities of the involved conditions.

We request the response dates be delayed until March 13, 1981. If this does not meet with your approval, please so indicate as quickly as possible.

Very truly yours, D. E. DOBSON Project Manager, WNP-3/5 N

cc: D. Smithpeter - BPA g V

Ebasco - New York 7 ^'

WNP-3/5 - Richland U T

8104300 M RI- 2n

puco s, o -

UNITED STATES 8

  • ,}*\g NUCLEAR REGULATORY COMMISSION
. a: REGION V

'# 1990 N. CALIFORNIA BOULEVARD e, -

%' ' N' e SulTE 202, WALNUT CREEK PLAZA e ,,e WALNUT CREEK, CALIFORNIA 94596 FEB Yo 1981' Docket flos. 50-508 50-509 Washington Public Power Supply System P. O. Box 968 ,

Richland, Washington 99352 Attention: Mr. D. E. Dobson Acting Program Director Gentlemen:

Subject:

Request for delay in response date, (yourletterof January.29,1981).

Thank you for your letter, referenced ,above, requesting a delay in the response date for four letters issued by G. S. Spencer, Region V, to F. D. McElwee, dated January 5, 6, and 9, 1981. Extension of the response date to February 20, 1981, as requested, is acceptable to this office.

Sincerely, R. H. Engelken j Director l

B10 p Co @ 9

~

6il I

tc h -

g Washington Public Power Supply System A JOINT OPERATING AGENCY 8*

i $y

$ g

.i g P.O 8011223 ELM A, WASHINGTON 96541 PHONE 12%] 249-5'101 January 29, 1981 G03-81-264 fiuclear Regulatory Commission, Region V Suite 202, Walnut Creek Plaza 1990 fiorth California Boulevard Walnut Creek, California 94596 Attention: Mr. R. H. Engelken Gentlemen:

Subject:

WPPSS flVCLEAR PROJECTS 3 AND 5 DOCKET fiOS. 50-508, 50-509

References:

1) Letter, G. S. Spencer to F. D. McElwee, dated January 5,1981, regarding response to August 29 - Septembe,r 26, 1980 inspection.
2) Letter, G. S. Spencer to F. D. McElwee, dated January 6,1981, regarding response' to September 23-26, 1980 inspection.
3) Letter, G. S. Spencer to F. D. McElwee, "flovember 18-21, 1980 Inspection," -

dated January 9,1981.

4) Letter, G. S. Spencer to F. D. McElwee, ,

" December 8-19, 1980 Inspection,"

dated January 9, 1981.

The fiRC has requested in the referenced four (4) letters various responses or information from the Washington Public Power Supply System. However, we will not be able to complete our effort by the dates requested in your letters. This is due to the large quantity of information being generated by several site organiza-tions and contractors.

The additional time is required to verify that the information is complete and accurate, prior to stating commitments to the f1RC.

We request that our response date for the four (4) letters be delayed until February 20, 1981. We trust this delay will be acceptable to you.

Very truly yours,

~

@D. E.O.DOBSOff Acting Program Director, Wf1P-3/5 cc: D. Smithpeter - BPA Ebasco - flew York WriP-3/5 Files - Riciland spd