.g D DA/RYLAND
_f h
[k COOPERAT/VE eo BOXS17 2615 EAST AV SOUTH LA CROSSE. 'MSCoNSIN 5:601
-(c m 37esecco April 24, 1981 In reply, please refer to LAC-7490 DOCKET NO. 50-409 m
U.-S. Nuclear Regulatory Cornission A
%,B ATTN:
Mr. Darrell G. Eisenhut,. Director' 6
h(k.
Division of Licensing U
Office of Nuclear Reactor Regulation Division of Operating Reactors E_J r3Q W
'g Washington, D.
C.
20555 d8 p#
- g. o.o$'E5"
SUBJECT:
DAIRYLAND POWER-COOPERATIVE h
LA CROSSE BOILING WATER REACTOR (LACBWR) s PRCVISIONAL OPERATING LICENSE NO. DPR-45 g
LIQUEFACTION POTENTIAL AND SEISMIC ANALYSIS AT LACBWR (SEP TOPICS II-4 AND III-6)
CHECKOUT OF EMERGENCY SERVICE WATER SUPPLY SYSTEM
Reference:
(1)
DPC Letter, Linder to Crutchfield, LAC-7376, dated February 18, 1981.
Gentlemen:
As reported in Reference 1, the deployment time test of the Emergency Service Water Supply System was' satisfactorily completed on February 18, 1981.
Photographs of the test are forwarded as of the first copy of this letter.
Please ensure these photographs reach Mr. James Shea, LACBWR Project Manager.
Enclo-sure 2 of this letter includes-the data sheet and procedure for the deployment tire test done on February 18, 1981.
If there are any questions concerning this subnittal, please contact us.
Very truly yours, DAIRYLAND POWER COOPEPATIVE f
/]J#G Frank L-inder, General Manager FL: FAD:af Fnclosures cc:
J. G. Eeppler, Reg. Dir., NRC-DRO III NRC Resident Inspectors 8104300355
/
r
,. 3..., ;
.., g,...,...j., p'.
y, c,..
r-V. M.
- b,
a N, !..".1 a *, ('.']t
.FC 80-83-T,* ADDENDK 5 ENCLOSURE 2
, ~.....
....y..
EMERGENCY SERVICE WATER SUPPLY SYSTEM
'~
\\
.g
~
ESWSS FUNCTIONAL TESTS 1.0 The objective of the following tests of the ESWSS are two-fold:
1 i
1.1 Determine ability and time requirS.nents to manually deploy and set up the ESWSS in acec-lance with proposed Technical Specifications (Section 3.0) 1.2 Perfornance of the system per the system's design objectives and proposed Technical Specifications (Section 4.0)
2.0 overoruCES
2.1 Energency Service Uater Supply Systen Design Description 2.2 LACEWR Cperating Manual, Vclunc V, Section 13 2.3 Waterous Co. " Operation and Maintenance Instructions for a
SV45 Skid Base Pumps", Forn F-2040 (7/79) 2.4 Proposed ESWSS Technical Specifications i
2.5 DPC Drawing 83-51-002 (attached).
f 3.0 ESWES DEPLOYMENT TIME TEST l
The purpose of this test is to determine the time required to deploy the systen under normal conditions using 5 maintenance department personnel and to determine an cptimum deployment routine.
3.1 Ecuic=ent:
The following equipment is stored in the northwest end of the Turbine Building.
3.1.1 3 Waterous SV45 purps with litter provisions and truck carts, Purps 41, 2 and 3. r
wc g.e s..
1 utr. ?l.p;c, ;.%'$@L*Q&;! 51l'C %
'1l 611 . 'l-l
.~.
I%QIt;flC.
3':
n
- i.. -3 FC 80-83 y," ADDENDA-5 5.. iw
~
r m t.jty. 7s.3 7lo:;.cq r,;
ENCLOSURE.2 p.
1
-(Cont'd)
~
.,e u.
...:., x..;,:
.v:x-h
.~m.
' 3.1. 2 ' 34 20' x 4" PVC Pump Suction Hoses with Strainers 3.1.3 3 - 25' x 3" Hi-Volume Pump Discharge Hoses 3.1.4 1 Way Ball Valve Distributor 3.1.5 2 - 100' Lengths of 5" Hi-Volume Relay Hose 3.1.6 1 - 50' Length of 5" Hi-Volume Relay Hose p
d
3.2 Prerecuisites
3.2.1 Notify security of intention to perform test and 1
1 obtain two guards for pesting at the Turbine Building overhead door and west gate to the river.
3.2.2 Nctify Operations of intention to perform test and obtain kcy for transfor.er yard gate and cper-ator to open Turbine Building dcor.
3.2.3 Notify Health Physics of intention to perform test and obtain clearances to enter transformer yard and to remove equipment f rom Turbine Building.
Determine unrchearsed time required for the Fire 3.2.4 Brigade to assemble at Turbine Building overhead dcor.
Determine time required for operator to open overhead 3.2.5 door and to line up valves 75-24-091, 75-24-092, and 75-24-093 in Turbine Building.
Instruct Maintenance personnel in the se -up and 3.2.6 operation of the portable system.
1 F
9
.a,
.e I
s
, - ~.
_-..._. g, w. n,,. s ; :_,_.. -
r
.,.a
. - ym 4 3.
l r:
. -p~s ;.:
, i.
5 Tois-r, ADDENDA 5_ J' (cont'd)
~
7 2
FNCLOSURE 2
. /,
4ff, fc - :
..,w -
wfy> s..v;, y y,
- . = _.
n -., n:. v. r.,.
~.
- y,w. f,l'#P. 3
- 3 *J Deployment' Drill:
j.@
-With the 5 Maintenance personnel staged at the overhead v
E'~
~. ' - -
i door to Turbine Building, perform and photograph the j
following tasks:
3.3.1 Manually deliver three pumps, suction hoses, strainers, discharge hoses, and 3-way distributor to the edge of the river.
3.3.2 Install suction and discharge hoses on each pump.
Access switch yard and cttach 5" hose to the 3.3.3 1
I 83-24-001 valve.
3.3.4 Laycut 200' of 5" hose fren valve 83-24-001 up to t
the west security fence.
Attach the three-pump discharge hoses to the 3-way l
3.3.5 distributor.
3.3.6 Attach a 5" 50-fcot hose to the disch;rge of the distributor and run to the river.
3.3.7 Start and prime all three pumps.
Establish full combined pu=p flow through the 5" hose 3.3.8 discharging into the river.
3.3.9 Record data on Data Sheet DS-A (attached).
3.3.10 Disacsemble and return equiprent to the Tu.-bine Building.
CAUTION:
Assure that the ESWSS ecuipment is stored in accordance with the Technical Specifications is so -er;uired.
3-t
?-e
s>.. rz.-; -
w :x ; '
,. ~ = -
.....h.
v' y-u : q~
... g ;...u *
- ~.,..<.,,,,g*
.,, y ' e.... mns +>e. ? *@s. 3.,.
.......m.x.g.y
. g s.
1 M l 2 -- ;
.,9.
i; *
[-
$3 SURE 2
- a ;e -
.. m..,-,z._.,3 q'a f. M,,9,,_.e....;c.
,... 'r
, h'?.',' ' y, T.N
. a : [$ J 5 I - f
.... :.r.
33.
..v
- ..e.,-
e:
.. + -,
'g..
- - g'
1,,.
,y_
- y.
)
,.f g.
.,; e-,
z r,--
-. - ^l.
- DATA SHEET
~
- I 1.,-
ps-A ESWSS Deployment Time Test (FC 83-80-1)
Elapsed Time 2
Min.
4;
_S e c,*
All (5) personnel assembled at
-Turbine Building, door open, and 3 in-plant valves lined up.
r Ist Pu-.p.- t river set up and 9
'4 i n.
15 Sec.
3 tarted.
200' of 5" Ecse layed cut and 10
.in.
15 sec.
cc:-nected up to west fence.
All pumps at river and set up.
14 Min.
45 Sec.
All 3 pumps running and dis-18 Min.
15 Sec.
charging thru distributor and 50' of 5" hose.
i
+
CCD'E';_'S :
- A fire brigade drill was performed on 2/20/81 to determine the base j
response time for the fira brigade (5 personnel) to assemble at and j
Balance of to open the Turbine E'ti'. ding Train Shed overhead door.
I deployment test was performed on 2/18/81 utilizing 5 maintenance personnel for which the 2/20/81 drill time was factored into the f
overall elapsed times.
i
';RC Resident Inspector, Morris Branch, observed 2/18/81 NOTES:
(1) portion of deployment test.
Paul Sampson, (2)
Photographs performed by DPC OC Inspector, on 2/18/81.,. (~ h
,7;,lp Date:
2/ZD/EL E e C O r d e d b y *.4. l -) U ' h. # -
Reviewed by:7R. 6 T '
4 (2/18/81 Test Witness)
@ <~, s g, } -