Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20003F089 + (ML20003F089)
- ML20003F090 + (ML20003F090)
- ML20003F091 + (ML20003F091)
- ML20003F092 + (ML20003F092)
- ML20003F093 + (ML20003F093)
- ML20003F097 + (ML20003F097)
- ML20003F099 + (ML20003F099)
- ML20003F101 + (ML20003F101)
- ML20003F102 + (ML20003F102)
- ML20003F103 + (ML20003F103)
- ML20003F105 + (ML20003F105)
- ML20003F106 + (ML20003F106)
- ML20003F107 + (ML20003F107)
- ML20003F108 + (ML20003F108)
- ML20003F110 + (ML20003F110)
- ML20003F111 + (ML20003F111)
- ML20003F114 + (ML20003F114)
- ML20003F115 + (ML20003F115)
- ML20003F116 + (ML20003F116)
- ML20003F117 + (ML20003F117)
- ML20003F118 + (ML20003F118)
- ML20003F119 + (ML20003F119)
- ML20003F120 + (ML20003F120)
- ML20003F121 + (ML20003F121)
- ML20003F122 + (ML20003F122)
- ML20003F123 + (ML20003F123)
- ML20003F124 + (ML20003F124)
- ML20003F125 + (ML20003F125)
- W3P81-1083, Advises That NUREG-0588 Submittal for Harsh Environs Will Be Transmitted on or Before 811001.Discusses Two Sets of Source Terms Used in Analysis + (ML20003F130)
- ML20003F131 + (ML20003F131)
- ML20003F132 + (ML20003F132)
- ML20003F134 + (ML20003F134)
- ML20003F135 + (ML20003F135)
- ML20003F136 + (ML20003F136)
- ML20003F140 + (ML20003F140)
- ML20003F141 + (ML20003F141)
- ML20003F142 + (ML20003F142)
- ML20003F143 + (ML20003F143)
- ML20003F145 + (ML20003F145)
- 05000348/LER-1981-009, Forwards LER 81-009/03L-0 + (ML20003F146)
- ML20003F147 + (ML20003F147)
- ML20003F148 + (ML20003F148)
- ML20003F149 + (ML20003F149)
- 05000348/LER-1981-009-03, /03L-0:on 810317,determined That Diesel Generator 1-2A Had Been Inoperable for 35-minute Period Following Entry Into Mode 4.Caused by Personnel Error.Personnel Instructed in Proper Procedures + (ML20003F150)
- PNO-III-81-036, on 810327,IE Authorized Resumption of All safety-related Work Including Concrete Placement.Decision Based on Favorable Insp Findings,Confirming That Appropriate Corrective Actions Were Taken by Util & Subcontractors + (ML20003F151)
- 05000348/LER-1981-008, Forwards LER 81-008/03L-0 + (ML20003F153)
- ML20003F154 + (ML20003F154)
- W3P81-1090, Forwards Conceptual Design of Operational Phase Meteorological Monitoring Sys Discussed During 810409 Telcon.Comments Requested.Diagrams Encl + (ML20003F155)
- 05000260/LER-1981-015, Forwards LER 81-015/03L-0 + (ML20003F156)
- ML20003F158 + (ML20003F158)
- 05000348/LER-1981-008-03, /03L-0:on 810313,surveillance Tests for Tech Spec 4.3.3.1 for Radiation Monitors R25 a & B Not Performed within Required Period.Caused by Personnel Not Properly Assessing Conditions for Surveillance.Test Schedule Revised + (ML20003F159)